IE Insp Rept 50-261/80-33 on 801028-30.No Noncompliance Noted.Major Areas Inspected:Matl Control & Accounting
ML14175B242
Person / Time
Site: Robinson 
Issue date: 11/26/1980
From: Hodges J, Kahle J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML14175B241 List:
References
50-261-80-33, NUDOCS 8101100820
Download: ML14175B242 (5)


Text

N OV2 9 1 80 Carolina Power and Light Company-2

Enclosure:

Inspection Report

No. 50-261/80-33

REGION H

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

NOV 2 6 1980

Report No. 50-261/80-33

Docket No. 50-261

License No. DPR-23

Safeguards

Group IV

Licensee:

Carolina Power & Light Company

ATTN: J. A. Jones

Executive Vice President

Engineering, Construction & Operation

411 Fayetteville Street

Raleigh, NC 27602

Inspection at H. B. Robinson

Date of Last Material

Control

and Accounting

Inspection:

December

13-14, 1976

Type of Inspection:

Unannounced Material Control and Accounting

Inspector:

J. W. Hodges, Safeguards Branch

Date Signed

Approved by:_

___

__

-

J. B. K7 'e,

Acting Section Chief

Date Signed

Inspection Summary:

Areas Inspection:

Material Control and Accounting. The inspection involved

16 inspector hours on site by one NRC inspector and was begun during the

regular hour Results:

The licensee was found to be in compliance with NRC requirements

in the one area examined during the inspectio Report Details

1. Key Persons Contacted

R. B. Starkey, General Manager

  • H. S. Zimmerman, Manager Technical and Administrative
  • Marvin Page, Project Engineer

Joe Scarborough, Engineer Technician

  • Denotes those present at the exit intervie. Licensee Action on Previous Inspection Findings

There were

no items of noncompliance on

the previous Material

and

Control inspectio. Exit Interview

The inspection scope and findings were summarized on October 30,

1980

with those persons indicated in paragraph 1 abov * 4. Unresolved Items

There were no unresolved items on this inspectio. MC85102B Material Control and Accounting

No items of noncompliance note The inspection results were attained

through:

(1) A review of SNM accountability procedures

and practice The

procedures have been approved by appropriate licensee management

and

contain written statements

of responsibilities for SIM

receipts, shipments, storage, internal control

and burnup and

depletio (2) Material Status Reports,

from

NRC

742,

issued by the licensee

during the period from December 31,

1976 through March 30,

1980

were audited and found to be in agreement with internal records

and reports

(3) Documentary evidence of prior physical inventories was reviewe The licensee has performed physical inventories at intervals

prescribed by the regulation *

(4) Material balance statements for enriched uranium,

and reactor

produced plutonium, as of March 30, 1980 are attached as Exhibits

A and EXHIBIT A

CAROLINA POWER & LIGHT COMPANY

H. B. ROBINSON, UNIT #2

MATERIAL BALANCE STATEMENT

ENRICHED URANIUM

AS OF MARCH 31, 1980

GRAMS

U

U235

BEGINNING INVENTORY 7/1/76

159,163,354

1,969,902

RECEIPTS

YUD Exxon Nuclear Co., Inc

67,804,298

1,960,270

SHIPMENTS

YUD Exxon Nuclear Co., In,476

12,363

YBL Brunswick #1

66,346,884

714,366

XGY Brunswick #2

46,419,020

334,450

BURNUP

2,773,481

1,510,260

BAL 3/31/80

111,000,791

1,356,733

Exhibt B

H. B. ROBINSON,

UNIT #2

MATERIAL BALANCE STATEMENT

PLUTONIUM

AS OF MARCH 31,

1980

GRAMS

Per

150

BEGINNING INVENTORY, 7/1/76

1,038,526

803,109

REACTOR PRODUCTION

593,748

408,733

SHIPMENT

YBL BRUNSWICK #1

497,449

397,319

XGY BRUNSWICK #2

331,331

240,469

DECAY

13,962

13,962

BAL 3/31/80

789,532

578,091