N OV2 9 1 80 Carolina Power and Light Company-2
Enclosure:
Inspection Report
No. 50-261/80-33
REGION H
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
NOV 2 6 1980
Report No. 50-261/80-33
Docket No. 50-261
License No. DPR-23
Safeguards
Group IV
Licensee:
Carolina Power & Light Company
ATTN: J. A. Jones
Executive Vice President
Engineering, Construction & Operation
411 Fayetteville Street
Raleigh, NC 27602
Inspection at H. B. Robinson
Date of Last Material
Control
and Accounting
Inspection:
December
13-14, 1976
Type of Inspection:
Unannounced Material Control and Accounting
Inspector:
J. W. Hodges, Safeguards Branch
Date Signed
Approved by:_
___
__
-
J. B. K7 'e,
Acting Section Chief
Date Signed
Inspection Summary:
Areas Inspection:
Material Control and Accounting. The inspection involved
16 inspector hours on site by one NRC inspector and was begun during the
regular hour Results:
The licensee was found to be in compliance with NRC requirements
in the one area examined during the inspectio Report Details
1. Key Persons Contacted
R. B. Starkey, General Manager
- H. S. Zimmerman, Manager Technical and Administrative
- Marvin Page, Project Engineer
Joe Scarborough, Engineer Technician
- Denotes those present at the exit intervie. Licensee Action on Previous Inspection Findings
There were
no items of noncompliance on
the previous Material
and
Control inspectio. Exit Interview
The inspection scope and findings were summarized on October 30,
1980
with those persons indicated in paragraph 1 abov * 4. Unresolved Items
There were no unresolved items on this inspectio. MC85102B Material Control and Accounting
No items of noncompliance note The inspection results were attained
through:
(1) A review of SNM accountability procedures
and practice The
procedures have been approved by appropriate licensee management
and
contain written statements
of responsibilities for SIM
receipts, shipments, storage, internal control
and burnup and
depletio (2) Material Status Reports,
from
NRC
742,
issued by the licensee
during the period from December 31,
1976 through March 30,
1980
were audited and found to be in agreement with internal records
and reports
(3) Documentary evidence of prior physical inventories was reviewe The licensee has performed physical inventories at intervals
prescribed by the regulation *
(4) Material balance statements for enriched uranium,
and reactor
produced plutonium, as of March 30, 1980 are attached as Exhibits
A and EXHIBIT A
CAROLINA POWER & LIGHT COMPANY
H. B. ROBINSON, UNIT #2
MATERIAL BALANCE STATEMENT
ENRICHED URANIUM
AS OF MARCH 31, 1980
GRAMS
U
U235
BEGINNING INVENTORY 7/1/76
159,163,354
1,969,902
RECEIPTS
YUD Exxon Nuclear Co., Inc
67,804,298
1,960,270
SHIPMENTS
YUD Exxon Nuclear Co., In,476
12,363
YBL Brunswick #1
66,346,884
714,366
XGY Brunswick #2
46,419,020
334,450
BURNUP
2,773,481
1,510,260
BAL 3/31/80
111,000,791
1,356,733
Exhibt B
H. B. ROBINSON,
UNIT #2
MATERIAL BALANCE STATEMENT
AS OF MARCH 31,
1980
GRAMS
Per
150
BEGINNING INVENTORY, 7/1/76
1,038,526
803,109
REACTOR PRODUCTION
593,748
408,733
SHIPMENT
YBL BRUNSWICK #1
497,449
397,319
XGY BRUNSWICK #2
331,331
240,469
DECAY
13,962
13,962
BAL 3/31/80
789,532
578,091