IR 05000250/1979016

From kanterella
Jump to navigation Jump to search
Forwards Proposed Revision to Administrative Procedure 0301, Licensed Operator Requalification Program,As Result of Deficiency Noted in IE Insp Repts 50-250/79-16 & 50-251/79- 16.Requests Review
ML17339B007
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/01/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Collins P
Office of Nuclear Reactor Regulation
Shared Package
ML17339B008 List:
References
L-80-137, NUDOCS 8005070534
Download: ML17339B007 (3)


Text

REGULATORY O'ORMATION OISTRISUTION SYM (RIOR)ACCESSION NBR;8005070534 DOC,DATES 80/05/01 NOTARIZED:

NO DOCKET FACIL:50 250 Turkey Point Plantr Unit A3i Florida Power and Light C 05000250 50 251 Turkey Point Plant<Unit Qi Florida Power and Light C 05000251 TH BYNAME AUTHOR AFF ILI ATION IGrR~ED Florida Power L Light Co, RECIP~NAME RECIPIENT AFFILIATION Division of Ljcensing COLLINS'~F~Operator Licensing Branch SUBJECT: Forwards proposed revision to Administrative Procedure 0301'icensed operator requalification program as result of deficiency noted in IE Insp Repts 50 250/79 16 K 50 250/79'6'equests review, DISTRIBUTION CODE~M003S COPIES RECEIVED~LTR~ENCL SIZE~,/TITLE: Operator Requa 1 i f i cat i on Pr ogr am C0~OTES~RECIPIENT COPIES ID CODE/NAME LTTR ENCL ACTION: 07 BC~~Q,~(5 5 INTERNAL: 0~G 1 1 05 LIC BR 2 2 14 AD QA K 0 1 1 RECIPIENT ID CODE/NAME 02 NRC PDR 12 ILE COPIES LTTR ENCL 1 1 2 2 EXTERNAL;03 LPDR 15 ACRS*-1 1 16 16'4 NSIC 1 1 NSV s~9SO TOTAL NUMBER OF COPIES REQUIRED: LTTR 30 ENCL 30

.1 l pt/r r f 11 4 I 1, L s

~%'g0 5005 07O~S~Y.O.BOX 529100, MIAMI, FL 33152 iyglljgi FLORIDA POWER II LIGHT COMPANY May 1, 1980 L-80-137 Office of Nuclear Reactor Regulation Attention:

Mr.Paul F.Collins, Chief Operator Licensing Branch Division of Project Management U.S.Nuclear Regulatory Commission Washington, D.C.20555

Dear Mr.Collins:

Enclosed is a proposed revision dated March 13, 1980 to Turkey Point Plant Administrative Procedure 0301, Licensed Operator Requalification Program.This proposed revision is submitted in accordance with the requirements of 10CFR 50.54 (i-1)and is consistent with the outcome of conversations between Mr.Joseph J.Buzy (NRC)and Mr.Kenneth E.Beatty (FPL)con-cerning resolution of identified deficiencies in examination categories.

The conversations and resulting revision are the result of an open item on I 8 E inspection report 250/79-16 and 251/79-16, dated June 25, 1979.We have also, at this time, incorporated other changes which we felt were appropriate.

Your timely review of this revision is appreciated.

Your very truly, Robert E.Uhrig Vice President Advanced Systems 5 Technology REU/JKH/RED/pa Attachment PEOPLE...SERVING PEOPLE