IR 05000250/1979018

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-250/79-18 & 50-251/79-18 on 790610-14.No Noncompliance Noted.Major Areas Inspected:Security Plan,Security Program Audits,Lighting & Access Control.Six Pages of Insp Rept Withheld (Ref 10CFR2.790)
ML17338B034
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/03/1979
From: Moore D, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17338B033 List:
References
50-250-79-18, 50-251-79-18, NUDOCS 7908240110
Download: ML17338B034 (1)


Text

ty'AT:

I

~ ~

G UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 JUL -g's79 Report Nos. 50-250/79-18 and 50-251/79-18 Docket Nos. 50-250 and 50-251 License Nos.

DPR-31 and DPR-41 Licensee:

Florida Power and Light Company ATTN:

R. E. Uhrig, Vice President Advance Systems and Technology Post Office Box 529100 Miami, Florida 33152 Facility Name:

Turkey Point 3 and

Inspection at: Homestead, Florida Inspection Conducted:

June 10-14, 1979 Date of Last Physical Security Inspection Visit:

March 5-9, 1979 Type of Ins ection:

Unannounced Physical Security Inspect

. E.

oore, Security Inspector hppreved by:

V.

. To in, Acting Chief, Security and Investigation Section

3

at Signed ate Signed Inspection Summary Areas Inspected:

Included review of Security Plan; Security Program Audits; Lighting; Access Control (identification, authorization and badging)

Access Control (Search);

Access Control (escorting);

Access Control (vital area);

Compensatory Measures.

The inspection involved 31 inspector hours onsite by one NRC inspector.

The inspection vas begun during an offshift period; three inspection hours vere accomplished during offshift periods.

Results:

The licensee vas found to be in compliance vith NRC requirements vithin the eight areas examined.

s -y2~7 I 05 Ce~

rcprc

.'8 e

~

@~IyI p,'"iI"TT9'tIrI!V@TH

~,

~ ~ ~

e COb

.... 2.-

~ ee

~ ~

7008240