IR 05000250/1979023

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-250/79-23 & 50-251/79-23 on Noncompliance Noted.Major Areas Inspected:Assessment Aids,Communications, Testing & Maint,Power Supply,Records,Repts,Locks & Keys. Details Withheld (Ref 10CFR2.790)
ML19249D436
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/24/1979
From: Moore D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19063C985 List:
References
50-250-79-23, 50-251-79-23, NUDOCS 7909240655
Download: ML19249D436 (1)


Text

{{#Wiki_filter:PATTRIALTE'NSP'1TO HEREWITH p *" "' * %'o, CC;!iAD!s 7.1.T.fiC.ATM . UNITED STATES

! \\ s, '% NUCLEAR REGULATORY COMMISSION 3 k ".., 7 ' ! REGION 11 ' ' h [[ 101 MARIETT A sT., N.W.. sulTE 3100 I o, ATLANT A, GEORGI A 30303 % ' %,r jn241979

    • "*

Report Nos. 50-250/79-23 and 50-251/79-23 Docket Nos. 50-250 and 50-251 License Nos. DPR-31 and DPR-41 Licensee: Florida Power and Light Company Post Office Box 529100 Miami, Florida 33152 Facility Name: Turkey Point 3 and 4 Inspection at: Homestead, Florica Inspection Conducted: June 26-29, 1979 Date of Last Physical Security Inspection Visit: June 10-14, 1979 Type of Inspection: Unannounced Physical Security Inspecto h

  • d/.24 !77

/ D. E. loore Date / Signed Accompanied by: T. D. Wilkins, Safeguards Co-op Approved by: gf'[.h_m b W. J. Tobin, Acting Chief, Security and Date Signed A Investigation Section SUMMARY Inspection Summary Areas Inspected Included review of Assessment Aids; Communications; Testing and Maintenance; Power Supply; Response; Lock and Keys; Records and Reports.

The inspection involved 32 inspector hours on site by two NRC inspectors.

,sQ , " Results r.

Within the seven areas inspected, no items of noncompliance were identified.

s-r.? 77 82l Cop-cf Ccpics 7_. J ~ ? O Th i ~ - ' ' r, -t t o be re,reducci- ..r:ccific ' " "'I ' I MATERIAL 1RANSMITT3 HEREWITH CONTAltiS 2.7C3 I;;Ta:::ali33 7909240 (55 _ _ _. _ _ _ _ _ }}