gpR REco~
~o op
+~
~o~
+**++
UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION ll 101 MARIETTAST., N.WSUITE 3100 ATLANTA,GEORGIA 30303 Report Nos, 50-250/79-14 and 50-251/29-14 Licensee:
Florida Pover and Light Company 9250 West Flagler Street Miami, Florida 33101 Facility Name:
Turkey Point Units 3 and
Docket Nos. 50-250 and 50-251 License Nos.
DPR-31 and DPR-41 Inspection at T k y oint Site near Homestead, Florida Inspecto
.~
~
~
J. D. Wilcox, Jr.
Approved hy:
A. R. Herdt, Section Chief, RCSES Branch I ~Unmet Inspection on May 8-11, 1929 Areas Inspected Da e igned
> PY Date i ned This routine unannounced inspection involved 21 inspector-hours on site in the area of steam generator replacement for Turkey Point Station Units 3 and 4.
Results Of thhe area inspected, no apparent items of noncompliance or deviations vere identified.
vooaoo o55$.
DETAILS Persons Contacted Licensee Employees
+H. E. Yaeger, Plant Manager
+F.
W. Rothermel, Project Construction Supervisor-E. F. Baker, QAO
+J.
W. Brown, QAO Manager-J. K. Hays, Plant Supervisor, Nuclear
+J. E. Moore, Operation Supervisor, Nuclear
+R.
G. Mende, Reactor Engineering
- V. A. Kaminskas, Reactor Supervisor-R. J.
Spooner, QAO Supervisor
+D.
W. Jones, QC Supervisor R. Tucker, QA T. Young, Lead Area Construction Supervisor H. D. Mantz, Project General Manager J. Brain, Engineer Manager Other licensee employees contacted included 3 technicians, 1 security force member, and 2 office personnel.
Other Organizations Bechtel Power Corporation (Bechtel)
A. J. Irving, Lead Mechanical Engineer A. K. Beckman, Iead Civil Engineer K. Hampton, Lead Field Welding Engineer
+Attended exit interview.
Exit Interview The inspection scope and findings were summarized on May ll, 1979 with those persons indicated in paragraph 1 above.
The scope of the inspection was reviewed.
The licensee was advised that no items of noncompliance were identified during this inspection.
Licensee Action on Previous Inspection Findings Not inspected.
Unresolved Items Unresolved itemswore not identified during this inspectio.
Independent Inspection Effort a.
Construction Status The haul route, laydown area, and unloading areas for receipt of the new steam generator lower assemblies have been constructed and tested.
The new steam generator lower assemblies are not at present on site.
b.
Plant Construction Administrative Site Procedures The inspector examined the following FPM. Plant Construction Adminstra-tive Site Procedures for content, completeness and organization:
Procedure No.
Title CPL:
ASP-1 Rev.
CPL:
ASP-2 Rev.
CPL:
ASP-3 Rev.
Organization for Maintenance/Repair cwork Preparation of Site Procedures/Process Sheets Document Controls Co Drawing and Process Sheets The inspector reviewed Bechtel's drawing No.
5177-074-C-8 Rev.
entitled,
"Haul Route - Cribbing and Fill Locations" for content and completeness.
In addition Process Sheet (PS)
No.79-001 entitled,
"Haul Route/Talbert Trailer" was examined to ensure that all signoffs had been made and dated.
The drawing and process sheets reviewed were found to be conducted and documented in a thorough and objective manner.
No items of noncompliance or deviations were identified in the above area inspecte e