ML17338A946
| ML17338A946 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/30/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17338A948 | List: |
| References | |
| NUDOCS 7908030576 | |
| Download: ML17338A946 (2) | |
See also: IR 05000250/1979014
Text
AS RICO
In Reply Refer To:
RII:JDW
50-250/79-14
50-251/79-14
UNITED STATES
NUCLEAR REGULATORY'COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
NAY sog78
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President
P. 0. Box 529100
Miami, FL
33152
Gentlemen:
This refers
to the inspection
conducted
by J.
D. Wilcox, Jr. of this office on
May 8-11,
1979, of activities authorized
by
NRC Operating
License
Nos.
and DPR-41 for the Turkey Point Unit 3 and 4 facilities, and to the discussion
of our findings held with H. E. Yaeger at the conclusion of the inspection.
Areas
examined
during the inspection
and
our findings are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were disclosed.
In accordance
with Section 2.790 of the
NRC's
"Rules of Practice",
Part 2,
Title 10,
Code of Federal
Regulations,
a
copy of this letter and the enclosed
inspection report will be placed in the
NRC's Public Document
Room. If this
report
contains
any information that you (or your contractor)
believe to be
proprietary, it is necessary
that you make
a written application within 20'ays
to this office to withhold such information from public disclosure.
Any such
application must include
a full statement
of the reasons
on the basis of which
it is claimed that the information is proprietary,
and
should
be prepared
so
that proprietary information identified in the application is contained in a
separate
part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
C. E. Murphy, Chief
Reactor Construction
and
Engineering Support Branch
1 II0803 097(