IR 05000206/1981003

From kanterella
Jump to navigation Jump to search

IE Insp Repts 50-206/81-03 & 50-301/81-03 on 810210-13. Details Withheld (Ref 10CFR2.790)
ML19347D531
Person / Time
Site: San Onofre, Point Beach  Southern California Edison icon.png
Issue date: 03/10/1981
From: Creed J, Madeda T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19347D524 List:
References
50-206-81-03, 50-206-81-3, 50-301-81-03, 50-301-81-3, NUDOCS 8103260474
Download: ML19347D531 (1)


Text

..

__. _

_ _

__.

..

.

,

t

.,a

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

,

r Report No. 50-266/81-03; 50-301/81-03 Safeguard Group IV

Docket No.- 50-266; 50-301 License No. DPR-24; DPR-27 Licensee: Wisconsin Electric Power Company 231 West Michigan Milwaukee, WI 53201 Facility Name: Point Beach Nuclear Plant, Units 1 and 2

.

. Inspection At: Point Beach Site, Two Rivers, Wisconsin Inspection Conducted: February 10-13, 1981 Date of Last Physical Security Inspection: October 27-31, 1980 Type of Inspection: Announced Physical Protection i

Inspectors:

.

/0/P/

p(PhysicalSecuritySpecialist)

~ Date

. R. Creed 0 h a,&

3/n/ei T. J. Madeda

/ Dar'e ~

(Physical Security Specialist)

Approved By:

.

.

E / 7/

. R. Creed, Acting Chief Date Safeguards Section f

Inspection Summary Inspection on February 10-13, 1981 (Report No. 50-266/81-03; 50-301/81-03)

Areas Inspected:

Included a review of Security Organization; Vital Area Physical Barriers; Access Control (Identification, Authorization, and D

. Badging); Access Control Escorting; Access Control (Vital Areas);

Detection Aids; Testing' and Maintenance; Power Supply; Response; Locks, Keys, and Combinations; Records and Reports.

The inspection. involved 47 inspector-hours onsite by two NRC inspectors;

-

The inspection began during the day shift period.

8108260 M

. -

-

--

-

-

-

-

-

-