IR 05000206/1981020

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-206/81-20 on 810618.No Noncompliance Noted. Major Areas Inspected:Independent Measurements Verification Program
ML20009E511
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 07/06/1981
From: Book H, Hamada G, Wenslawski F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20009E490 List:
References
50-206-81-20, NUDOCS 8107280265
Download: ML20009E511 (4)


Text

,

_

.-

-

.

. _ _.

'

,

,

.

U. S. NUCLEAR REGULATORY C0fEISSION i

0FFICE OF INSPECTION AND ENFORCEMENT REGION Y Report No. 50-206/81-20 Docket Ho. 50-206 License No. npp-13 Safeguards Group Licensee:

Southern California Edison Cnmnanv j

P. O. Box 800 2244 Walnut Grove Avenue

Rosemead. California 91770 Facility Name:

San Onofre Unit 1 l

Inspection at:

In Office. NRC Reaion V Inspection conducted: June 18.1981 Inspectors:

dM l

G. Hamada, ' Radiation Labc atory Specialist Date Signed 7///f/

Approved By:

.

F. Wenslawski, Chief Date Signed Reactor R iation otec ic>n Section d4}L

[ !I/

Approved by:

~

Date Signed

,

.

H. E. Book, Chief Radiological Safety Branch Sumary:

Inspection of June 18,1981 (Report No. 50-206/81-20)

,

'

This report is a followup to a previous NRC inspection (Report No. 50-206/

81-06) during which radioactive samples were collected for subsequent analyses and comparisons.

Results of those analyses and comparisons are reported herein. No items of noncompliance were identified.

8107280265 810707 RVForm219(2)

PDR ADOCK 05000206 G

PDR

.. _ _

-

,, _.

- - -.

.. -

-

- -.

._ _. - -.

-

.

,

DETAILS 1.

Background During(the independent measurements verification inspection of February 9-12, 1981, Report No. 50-206/81-06), a liquid effluent sample was obtained and split for analysis by both Southern California Edison (SCE) and a NRC contractor (the Radiological and Environmental Sciences Laboratory (RESL) of the Departmegt ofEnergy). The intercomparison measurements included analysis for Tritium (H ),

Gross Beta, SR-89 and SR-90. The SCE analyses were performed by their contractor laboratory (Environmental Analysis Laboratory). The analyses have been completed and the results are discussed below. The attachment to this report provides the criteria for comparing the analytical measurements.

2.

Discussion of Results The table below shows that there is good agreement between SCE and RESL for this phase of the independent measurements verification program.

SCE (SONGS 1) - RESL INTERCOMPARISONS SCE RESL RATIO RATIO RANGE Analysis Ci/ml Ci/ml SCE/RESL FOR AGREEMENT H-3 (7.91 1 0.02) E-3 (7.6 1 0.4) E-3 1.04 (0.75 - 1.33)

SR-89 (0 1 0.05) E-6 (-2 1 1) E-7

-

-

SR-90 (7.3 1 0.3) E-7 (9.4 1 0.6) E-7 0.78 (0.75 - 1.33)

Gross B*

(5.0 1 0.2) E-4 (5.4 1 0.2) E-4 0.93 (0.75 - 1.33)

  • Reference date for Gross Beta was March 19, 1981, 10:00 A.M.

This completes the independent measurements verification effort with i

San Onofre Unit 1, and the open item (item no. 81-C6-01) identified in report no. 50-206/81-06 is now closed. On the bcsis of the above l

results and the intercomparison results previously mtained, it can l

be concluded that there is agreement between NRC and San Onofre Unit

!

1 in th'e measurement of gaseous and liquid effluents. -

l

'

!

{

!

l

.

t

-

r,

,,

.

..

..

.

.

'

-

.

.

,

e o

~

ATTACHMENT

,

CRITERIA FOR COMPARING ANALYTICAL MEASUREMENTS

-

.

'(

LICENSEE VALUE

)

RATIO (NRC REFERENCE VALUE)

.....

M"3 Possible Possible

'

'

Resolution Agreement Agreement A Agreement B c...

0.4 - 2.5 0.3 - 3.0 No Comparison 4-7 0.5 - 2.0 -

0.4 - 2.5 0.3 - 3.0 i

8.- 15 0.6 - 1.66 0.5 - 2.0 0.4 - 2.5

,

16 - 50 0.75 - 1.33 0.6 - 1.66 0.5 - 2.0 51 - 200 0.80 - 1.25 __ 0.75 - 1.33 0.6 - 1.66

'

,

!

>200 0.85 - 1.18 0.80 - 1.25 0.75 - 1.33

.

"A" criteria are applied to the following analyses:

Gamma Spectrometry where principal ga==a energy used for

'

identification is greater than 250 Kev.

hhhij$

Tritium analyses of liquid samples.

Iodine on adsorbers.

"B" criteria are applied to the following analyses:

Camma spectro =etry where principal gam =a energy used for

.

idenrification is less than 250 Kev.

9 Sr and Sr determinations.

Gross Eeta where samples are counted on the same date using the same reference nuclide.

.

.

.

,..

.

l

=.{

'

. '.

,

.

.

,

.

.-

.-

__

__.

-

t

.

\\

-

e e.

,

..

"

-

-

.

.

.

.

,

.>

.

-2-

!

.

Procedure a.

The NRC Reference Laboratory value should be divided by its

..,, ;

associated uncertainty (la) to obtain the resolution.

b.

The ratio of the two measurements to be compared should be

-- -

determined by dividing the result to be compared by the AEC

.

M Reference Laboratory result.

'

.

c.

Agreement is considered obtained if the ratio falls within therangegiveninthe" Agreement"columnfortheagociated

,

,,,,,,.

resolution.

For example, consider a comparison of S,r

' "

-5 determinations. A licensee obtains a value of 1.'J +.08 x 10 uCi/ml and the Ny Reference Laboratory reports a result of

-

2.53 +.06 x 10 uCi/ml. The resolution would be 42 (2.53/.06)

'

and the ratio is 0.78 (1.97/2.53). This pair of measurements would be considered to be in " agreement" because for this resolution, the " agreement" range is 0.75 - 1.33.

I d.

If " agreement" is not achieved, the ratio should be evaluated for "possible agreement." In this case, consideration is made for the type of analyses conducted by selecting a range in the appropriate column; i.e., "A" analyses or "BI' analyses.

If the ratio falls outside the appropriate possible agreement" e.

column, the two measurements will be considered to be in

,

"disagreemen t."

'