TAC:42768
From kanterella
(Redirected from TAC:42769)
Jump to navigation
Jump to search
Request for: Approved, Closed | |
| From | |
MONTHYEARML19310A9241980-06-0606 June 1980
[table view]Responds to IE Bulletin 80-06, Engineered Safety Feature (ESF) Reset Controls. Control of Solenoid Valve Will Be Modified Such That Total Recirculation of Control Room Air Will Continue After Reset of Containment Isolation IR 05000206/19810031981-03-10010 March 1981 IE Insp Repts 50-206/81-03 & 50-301/81-03 on 810210-13. Details Withheld (Ref 10CFR2.790) ML20009B5961981-05-31031 May 1981 Technical Evaluation of Licensee Responses to IE Bulletin 80-06,re Engineered Safety Feature Reset Controls for Point Beach Nuclear Power Station,Units 1 & 2 ML20009B5931981-07-0707 July 1981 Forwards Safety Evaluation & Technical Evaluation Re Util Responses to Items 1 & 3 of IE Bulletin 80-06, Engineered Safety Feature (ESF) Reset Controls ML20069F8611982-09-20020 September 1982 Advises That as Interim Corrective Measure Per IE Bulletin 80-06 Request,Administrative Controls Will Be Implemented to Manually Close Both Steam Generator Blowdown Line Isolation Valves Prior to Resetting Containment Isolation Signal ML20027D7531982-10-0808 October 1982 Approves Short & long-term Actions to Correct ESF Design Deficiency Discovered as Result of Wiring Mods to Steam Generator Blowdown Line Isolation Valves 1981-05-31 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:42768&oldid=4656780"