IR 05000361/1981019
| ML20011B262 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 12/02/1981 |
| From: | Nelson G, Norderhaug L, Wieder A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20011B260 | List: |
| References | |
| 50-361-81-19, NUDOCS 8112080276 | |
| Download: ML20011B262 (1) | |
Text
.
__
,
Th2 information on this pag 2 is censid: red to be appropriata fcr public disclosure pursuant to 10 CFR 2.790.
ggg Tpjacwu itTREMiB CSTE
V 2AJ.;achuA1105 U. S. Nuclear Regulatory Commission
Office of Inspection and Enforcement Report No.
50-361/81-19 (IE-V-460)
50-361 C
Docket No.
License No. SNM-1879 Safeguards Group -2.
Licensee:
Southern California Edison ~ Company 2244 Walnut Grove Avenue, P. O. Box 800 Rosemead, California 91770 Facility Name:
San Onofre Nuclear Generating Station - Unit 2 Inspection at:
San Clemente, California 92672 Inspection conducted:
September 9-10, 1981 Date of Last Material Control and Accounting Inspection:
February 23-25, 1981 Type of Inspection:
Preoperational, Material Control and ' Accounting -
Inspectors:
[u MA -
M -/-[/
/ G. B. Nelson, Chemist Date Signed hY
&
l2-2-f /
' f. V. Wieder, Auditor "
Date Signed Approved by: v&n O.h[a[.
ja/2/7/
L. R. Norderhaug, Chief, Safeguards Branch Date Signed
'
Inspection Summary:
Areas Inspected: Announced preoperational safeguards inspection verifying compliance with applicable regulations pertaining to the control and-accounting of special nuclear material.
Functional areas inspected included Facility Organization and Operations, Measurements and Controls, Shipping and Receiving, Storage and Internals Controls, Physical Inventory, Records and Reports. The inspection involved 24 man-hours on-site by two NRC inspectors.
- Results: No items of noncompliance were identified.
L 2]90 INFORMA110N O$Ko!$$jjj, PDR
,
,_
__---------x,___-
- - _ _