U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AFD ENFORCEMENT
i
REGION V
Report No. 50-361/81-20
.
Docket No,' 50-361 License No.
CPPR-97 Safeguards Group
,
Licensee: Southern California Edison Company
P. O.
Box 800
,
2244 Walnut Grove Avenue
_
Rosemead, California 91770
,
Facility Name:
San Onofre Unit 2 Inspection at:
San Onofre, California Inspection conducted: August 1-7 and August 17-28. 1981 Inspectors:
lb k M 21,/ffI
@lrf)JohMaidn, Resident Inspector Date S'igned
'
Date Signed
.
Date Signed Approved by:^ OMMZ
~
WAi. 19(l
Gf B. Uwetdig, Chief, Reactor Projects Date Signed Section 1, Reactor Operations Projects Branch Date Signed Summary:
+
Inspection on August 1-7 and August 17-28, 1981 (Report No. 50-361/81-20)
Areas Inspected: Routine, resident-inspection of preopera-tional test program and procedures, receipt of new fuel, plant tours, and independent inspection effort.
The in-
';
spection involved-75 inspector-hours by one NRC inspector.
Results: Of the.five areas inspected, no items of noncompliance or deviations were identified.
,
.
d i
791102004% B10922 RV Form 219 (2)
s PDR ADOCK L 5000361 -
,U PDR-
-.
- - - -
- - -
- -
- - - -
-
. - - - -
-
- -
-
- -
-
V'
.
DETAILS
.
1.
Persons Contacted a.
Southern California Edison
- P. A.
Croy, Project Quality Assurance Supervisor
- R.
Horton, Startup Quality Assurance Supervisor AD. Stonecipher, Operations Quality Assurance AC. Kergis, Operations Quality Assurance AF. Patterson, Startup Quality Assurance Engineer
- R.
Neal, Station Operations
- T.
R.
Phelps, Startup Engineer T. Gra, Quality Assurance f
K. Johnson, Startup Engineer
- J.
Pantaleo, Startup Quality Assurance Engineer b.
Bechtel Power Corporation AD. O.
Bye, Startup Engineer The inspector also interviewed and talked with other licensee employees during the course of the inspection.
These in-cluded shift supervisors, reactor and auxiliary operators, maintenance personnel, plant technicians and engineers, and quality assurance personnel.
^ Denotes those attending exit meeting.
2.
Plant Statur The licensee reports that Unit 2 is 99 percent complete as of July 29, 1981.
3.
Initial Fuel Receipt The inspector discussed with licensec representatives their prep-arations for receipt of fuel prior to the arrival onsite, to confirm that all necessary provisions had been met.
An examina-tion of the requisite procedures affirmed that the licensee had taken into account security' requirements, radiation protection, and receipt inspection.
The first shipment arrived August 20,.1981, and ras immediately moved to the' loading area at Unit 2.
The inspector verified by observation that the security plan was in effect; radiation protection personnel performed surveys; and the inspection of the containers for damage, breakage of seals, and absence of loose matter was done as required.
As the fuel was moved into the fuel building, the inspector observed the opening of the containers.
After a container was l
-
r*
.
'
-
-2-opened, the interior was surveyed and smeared for radioactive contamination.
The fuel elements were then removed and visually inspected in accordance with procedures.
The elements were then placed in the appropriate storage location.
Clean room conditions were in effect during all stages of activity in the fuel building.
No items of noncompliance or deviations were identified.
4.
Plant Tour The inspector toured various areas of the plant to discover the status of housekeeping.
During a tour, the inspector observed that loose paper material, used for masking during painting, had accumulated on the floor in the containment on the grade elevation.
The inspector discussed with licensee representatives during the management meeting a concern that this paper and the volatile solvents used with the paint could present a fire hazard.
The representatives stated that an audit surveillance would be con-ducted to assess the conditions in the containment and take appro-priate corrective action.
The inspector also pointed out that the containment personnel airlock door seals and mating surfaces had no protection.
The representatives stated that the seals had been protected earlier with plywood covers and would investigate the condition of the ueals to assess the protection required.
(81-20-01)
No items of noncompliance or deviations were identified.
5.
Preoperational Test Observation i
The inspector observed selected portions of the following pre-operational tests:
2PE-225-01 High Pressure Safety Injection 2PE-455-01 Diesel Generator Load Group Verification 2PE-101-04 Containment Isolation Valves (Feedwater Isolation Valves)
2AC-285-01 Compressed Air System 2PE-358-01 Plant Protection System Time Response During the observation of these tests, the inspector verified by observation that the tests were conducted with approved pro-cedures; that test equipment was installed and functional; the test data were collected and recorded; and personnel participat-ing in the test were apprised of the conduct of the test prior to commencing the test activity.
\\
_
.-
-
.
,
,,
.
'~
-
-3-
,
,
,
,
!
S
'
Test 2PE-358-01, " Plant Protection Sydtem Time Response," has not yet achieved viable results.
The-apparent problem is with the test instrumentation.
Thd' licensee has sent the test equip-
-
ment to the vendor to investigate th'e problem.
".einspector.rekues'tedthat'theresident inspector be kept 4'ormed of the status of the test so any change in the test procedure could be'(xamined prior to the conduct of the test.
(61-20-02)
No items of noncompliance or deviations were identified.
6.
Management Meeting On August 28, 1981, the inspector met with licensee representa-tives (denoted in Paragraph 1) to discuss the scope and findings of the inspection.