DCL-85-051, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 1 to EP OP-0.1, Reactor Trip Response & Rev 5 to EP G-3, Notification of Offsite Organizations

From kanterella
(Redirected from DCL-85-051)
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 1 to EP OP-0.1, Reactor Trip Response & Rev 5 to EP G-3, Notification of Offsite Organizations
ML20125A619
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/04/1985
From: Shiffer J
PACIFIC GAS & ELECTRIC CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20125A621 List:
References
DCL-85-051, DCL-85-51, GL-81-27, NUDOCS 8506110135
Download: ML20125A619 (4)


Text

-__ - _ _ _ _ _ _ _ _ _ _ _

O)V J

PACIFIC OAS AND E LE C T RIC C O M PANY 77 statt srRcct. s4N raancisco, c ALIFORNI A 94106 ppg , TELEPHONE (415) 781 4231 February 4,1985 i

~

PGandE Letter No.: DCL-85-051

> Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re: Docket No. 50-275, OL-DPR-80 Docket No. 50-323' Diablo Canyon Units 1 and 2

' ' ~ ~ ~ - Emergency Plan Implementing Procedure Updates

Dear Mr. Martin:

In accordance with Section V, " Implementing Procedures," of 10 CFR 50, Appendix E. PGandE is submitting one copy of the updates to the detailed Implementing Procedures (Enclosure 3) for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan. These updates are listed in Enclosure 1.

Concurrently, two copies of each update are being submitted to the Document Control Desk.

Some of the updates contain privacy / proprietary infomation. This ocivacy/ proprietary infermation has been bracketed in accordance with NRC

. Generic Letter 81-27 and is identified in Enclosure 2.

Kindly acknowledge receipt of the above material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

Sincerely.

ORIGINAL SIGNED BY J. D. Shiffer Enclosures cc: R. T. Dodds R. Fish - -.

Document Control Desk (2) '

Service List cc w/o enc 3: G. W. Knighton .

0506110135 850204 PDR ADOCK 05000275 F PDR l

l

PGandE Letter No.: DCL-85-051 ENCLOSURE 1 Updates Included In This Submittal DIABLO CANYON EMERGENCY PLAN IMPLEMENTING PROCEDURES

~

Volume 3A Updated Table of Contents EP OP-0.1, Revision 1

  • EP M-1 Attachment Only Revision 12 EP G-3, Revision 5 (pages 1 through 5 only) s Volume 38 Updated Table of Contents

- - - - f EP EF-4, Revision 6 EP RB-10, Revision 1 O

O e

m '

WN \

\

k

)

, PGandE Letter N3.: DCL-85-051 ENCLOSURE 2

~

Location of Privacy / Proprietary Information Procedure: ,

EP EF-4 Pages 1, 2, 3, and 8 of 8; Attachment 1, page 1 of 1; Attachment 4, page 1 of 1 EP M-1 Attachment, Safety Health and Claims Personnel to be Contacted for Reporting of Injuries at Diablo Canyon, pages 1 and 2 of 2.

e p = = = rem "

9 O

G S

9 e

4 0502d/0005K

. . . i i..... .-i

~

PGandE Lett;r N3.: DCL-85-051 ENCLOSURE 3 Updates to Diablo Canyon Emergency Plan Implementing Procedures e

4

  • p- e eh ""

a f

e 4

5

(

<i 7 i

(

~~

t __