There is currently no text in this page. You can search for this page title in other pages, or search the related logs, but you do not have permission to create this page.
Category:PNO
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "PNO"
The following 200 pages are in this category, out of 3,846 total.
(previous page) (next page)P
- PNO-I-02-017, Susquehanna - Unusual Event Declared Due to Onsite Fire/Explosion within the Protection Area
- PNO-I-02-020, Unusual Event Due to a Hydrogen Gas Ignition in the Off-Gas System (39348)
- PNO-I-03-003, Unusual Event Due to a Safety Injection Signal & Closure of the Main Steam Isolation Valves (39616)
- PNO-I-03-004, Millstone Nuclear Power Station, Unit 2, Unusual Events Declared Due to Reactor Trip with Leakage from Charging System (EN Nos. 39644 and 39645)
- PNO-I-03-006, Seabrook Station, Unusual Event Due to a Potential Intruder Inside the Protected Area (39686)
- PNO-I-03-013, Reactor Trip from 100% Power Due to a Turbine Trip - Media and Public Interest
- PNO-I-03-014, Unusual Event Declared Due to Fire in the Main Turbine
- PNO-I-03-016, Oyster Creek Bargaining Unit Strike at Oyster Creek (39876)
- PNO-I-03-024, Salem Nuclear Power Plant, Units 1 & 2, Elevated Tritium Levels in Groundwater - New Information
- PNO-I-03-027, Dual Unit Reactor Scram Due to Electrical Grid Disturbance
- PNO-I-04-009, Yankee Atomic Electric Company, Spill of Low-Level Radioactive Waste from Package While in Transit
- PNO-I-04-010, Yankee Atomic Electric Company, Notification of Unusual Event
- PNO-I-04-012, Connecticut Yankee Atomic Power Company, Fire in Vacant Administration Building at Decommissioning Reactor Site
- PNO-I-04-014, Connecticut Yankee Atomic Power Company, Fire Inside Containment Structure at Decommissioning Reactor Site
- PNO-I-05-017, Alert Declared at Millstone 3 Due to Main Steam Safety Valve Not Reseating After an SI Actuation on Low Main Steam Line Pressure
- PNO-I-05-018, A, Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Supplement to Equipment Fire Inside Containment Structure at Decommissioning Reactor Site
- PNO-I-05-020, A: Supplement - Entergy'S Fitzpatrick Station Shutdown 72 Hrs; Repair Small Crack in Torus Portion of Primary Containment
- PNO-I-05-021, Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Vehicle Accident Involving Spill of Low Level Contaminated Material
- PNO-I-05-022, Alert Declaration at Oyster Creek
- PNO-I-05-026, A Supplement - Hope Creek Shutdown Expected to Be Greater than 72 Hours to Repair an Inoperable Drywell to Suppression Chamber Vacuum Breaker
- PNO-I-05-028, Connecticut Yankee Atomic Power Company, Haddam Neck Report of Spent Fuel Pool Leak
- PNO-I-06-005, Millstone Unit 2, Shutdown Greater than 72 Hours - Turbine Driven Auxiliary Feedwater Pump Rotating Assembly Degradation
- PNO-I-06-009, Vermont Yankee Unusual Event Due to Indications of Fire in Electrical Switchgear Room
- PNO-I-06-010, A: Seabrook Power Station, Shutdown Greater than 72 Hours - Both Emergency Diesel Generators Inoperable Due to Problems in the Voltage Regulation Circuitry
- PNO-I-06-011, Peach Bottom, Unit 2, Loss of Containment Integrity Due to Leak in a Test Return Line
- PNO-I-06-012, Oyster Creek, Evaluation of Containment Design Function
- PNO-I-06-014, A: Calvert Cliffs Update of Preliminary Notification on Shutdown Greater than 72 Hours Due to Trip from Closure of Main Turbine Governor and Intercept Valves
- PNO-I-07-001, A: Update on Notification of Unusual Event (NOUE) Declared Due to Low Water Level in Indian Point Unit 3 Service Water Intake Bay
- PNO-I-07-002, Notification of Unusual Event (NOUE) Declared Due to Fire in Turbine Building Load Center at Peach Bottom, Unit 3
- PNO-I-07-004, A: Update - Unusual Event Declared Due to Explosion in 31 Main Power Transformer at Indian Point Unit 3
- PNO-I-07-006, A - NRC Resident Inspector - Update - Reactor Scram on Low Reactor Vessel Water Level Due to a Trip of the 'C' Reactor Feed Pump
- PNO-I-07-007, Peach Bottom Alert Declared Due to Carbon Dioxide Discharge in Diesel Generator Building
- PNO-I-07-008, Vermont Yankee, Restoration of West Cooling Towers
- PNO-I-07-009, Nine Mile Point Unit 2, Alert Declared Due to Inadvertent Discharge of Carbon Dioxide Into Electrical Switchgear Room
- PNO-I-08-001, A: Seabrook, Update - Unplanned Shutdown Greater than 72 Hrs Resulting from Automatic Reactor Trip Due to Ground Fault on 345kv Line
- PNO-I-08-002, Notification of Unusual Event for Ginna Station Due to Loss of Off-Site Land-Line Communications Due to High Winds
- PNO-I-08-003, A: Limerick, Update - Shutdown Exceeding 72 Hrs
- PNO-I-08-006, A: Vermont Yankee Nuclear Power Station, (Update) Transfer of Spent Fuel from Spent Fuel Storage Pool to Onsite Independent Spent Fuel Storage Installation (ISFSI)
- PNO-I-08-009, A: Vermont Yankee, Update - Water Leak in a Cooling Tower
- PNO-I-08-010, Hope Creek Generating Station Notification of Unusual Event Due to Indications of Internal Flooding
- PNO-I-08-011, Susquehanna, 10/27/08, Alert Declared Due to High Nitrogen Levels in Unit 2 Safety-Related Pump Room
- PNO-I-08-013, A - Update - Oyster Creek: Automatic Reactor Scram Due to Main Transformer Fault
- PNO-I-09-001, A: Exelon Generation Company, LLC, Update - Oyster Creek Unusual Event and Automatic Reactor Scram Due to Fire in M1A Main Transformer
- PNO-I-09-002, A: Oyster Creek, Update - Shutdown Greater than 72 Hours: Manual Reactor Scram Following Loss of Cooling to Main Transformer, Dated 05/04/2009
- PNO-I-09-003, A: Indian Point Unit 3 Shutdown Due to Feedpump Issues, Dated 06/08/09
- PNO-I-09-004, A: Updated - Millstone Unit 2 Reactor Trip and Shutdown Greater than 72 Hours
- PNO-I-09-005, A: Update: Oyster Creek Reactor Trip and Unusual Event Due to a Loss of Offsite Power and Shutdown Greater than 72 Hours
- PNO-I-09-006, Three Mile Island Unit 1 - Contamination Event (Update)
- PNO-I-09-007, A: Update - Millstone Unit 3 Reactor Trip and Shutdown Greater than 72 Hours
- PNO-I-10-001, A: Update - Calvert Cliffs Dual Unit Reactor Trip Due to Partial Loss of Offsite Power
- PNO-I-10-002, Loss of Normal Communications / Storm Impact Offsite at Vermont Yankee
- PNO-I-10-003, Unusual Event Declarations Due to Seismic Activity (Vermont Yankee and D.C. Cook)
- PNO-I-10-004, A: Update: Susquehanna Unit 1 Manual Scram and Shutdown Greater than 72 Hours Due to an Internal Flooding Event
- PNO-I-10-005, Susquehanna Alert Due to High Refrigerant Levels in Unit 1 Reactor Bldg
- PNO-I-10-006, Notification of Alert Declared Due to Explosion as a Result of 21 Main Transformer Failure at Indian Point, Unit 2
- PNO-I-11-001, Nine Mile Point Units 1 and 2 Strike
- PNO-I-11-002, A: Update - Salem Unit 2, Notification of Unusual Event Due to Reactor Coolant System Leak Greater than 10 Gpm and Technical Specifications Required Shutdown
- PNO-I-11-003, A, Update: Nine Mile Point Unit 2 Notification of Unusual Event Due to Reactor Coolant System Leak Greater than 10 Gpm and Plant Shutdown Greater than Three Days
- PNO-I-11-004, A Update - Nine Mile Point Unit 2 Technical Specification-Required Shutdown Due to an Increase in Unidentified Reactor Coolant System Leakage
- PNO-I-12-001, A: Update - Salem Generating Unit 1 Inadvertent Safety Injection and Notification of Unusual Event Due to Fire Alarm in Containment
- PNO-I-12-002, G: Update - Status of Union Lockout at Pilgrim Nuclear Power Station
- PNO-I-12-003, A Update: Shutdown Expected to Be Greater than 72 Hours to Repair a Leak from a Chemical Decontamination Pipe on the '1A' Reactor Recirculation Loop
- PNO-I-12-004, Limerick, Unit1, Notification of Unusual Event Declared Due to Electrical Fault in Non-Safety Related Transformer 7-18-2012
- PNO-I-12-005, Oyster Creek Reactor Shutdown and Unusual Event Due to a Loss of Offsite Power and Shutdown Greater than 72 Hours
- PNO-I-12-006, A Update - Three Mile Island Shutdown Due to Reactor Coolant System Leak
- PNO-I-12-007, Hurricane Sandy Causes Oyster Creek Alert and Shutdowns of Reactors at Nine Mile Point Unit 1, Indian Point Unit 3, and Salem Unit 1
- PNO-I-12-008, Fitzpatrick Notice of Unusual Event for Fire in Main Transformer
- PNO-I-13-001, D - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo
- PNO-I-14-001, Calvert Cliffs Dual Unit Trip Following the Loss of the 21 13kV Bus
- PNO-I-14-002, A - UPDATE- Millstone Dual Unit Trip with Loss of Offsite Power
- PNO-I-14-003, Millstone, Unit 2. Shutdown Greater than 72 Hours Due to TS-Required Shutdown for the TDAFW
- PNO-I-15-001, Pilgrim: Shutdown Greater than 72 Hours Due to Reactor Scram Following a Partial Loss of Offsite Power
- PNO-I-15-002, A - Update - Indian Point Nuclear Power Station Unit No. 3: Shutdown Greater than 72 Hours Due to Reactor Trip Following 31 Main Transformer Failure
- PNO-I-22-001, Susquehanna Notification of Bankruptcy Filing by Talen Energy Supply
- PNO-I-79-001, on 790922,stable Natural Circulation Flow Was Lost.Caused by Diminishing Heat Input from Core
- PNO-I-79-005, on 791008,licensee Employee Picked Up 7.5 Mci Cs-137 Source Which Separated from Retraction Rod of Moisture Density Gauge.Employee Carried Source in Pocket for 30 Minutes,Receiving 10-15 Rems to Whole Body
- PNO-I-79-035, on 791213,NRC Contacted by Univ of MD Poison Control Ctr Re Individual Who Became Ill After Contact W/ Toxic Matl at Sharpstown,Md.Region 1 Will Continue to Review Matter to Determine Whether Radiation Was Involved
- PNO-I-79-039, on 791218,two Former Employees of Const Contractors Made Statements That Welding & Concrete Work Improperly Performed.Region 1 Conducting Investigation of Allegations
- PNO-I-79-040, on 791218,contractor Painter Fell from Ladder in Reactor Bldg & Sprained Ankle.Painter Was Treated & Released from Hosp.No Radiation or Contamination Involved
- PNO-I-79-045, b on 791228,Region 1 Requested Licensee Assure That Radiation Level of 1 Rem/Hour Under Trailer Bed Be Reduced to Less than 200 Millirem/Hour Prior to Release from Depot
- PNO-I-80-001, on 800104,isolation Condenser Isolated.Addl Insps of Containment Wall in Progress.Power Operation Will Continue Per Tech Specs for 15 Days.Precedures Require Power Be Reduced to 40% 24-h After Removing Condenser from Svc
- PNO-I-80-002, on 800223,observed Two Individuals Climb Protected Area Barrier Fence on East Side of Site. Individuals Eluded Security Force Surveillance.All Onsite Personnel Identified
- PNO-I-80-024, on 800210,facility Lost Incoming 345 Kv Transmission Line.Caused by External Power Sys Problems.Core Defueled & Spent Fuel Pool Temp Remained Relatively Constant During Event
- PNO-I-80-025A, on 800211,40.5 Ci Xe-133 Released Representing 37% Tech Spec for Instantaneous Release.On 800212 Local Emergency Declared in Auxiliary Bldg Again Due to Ion Exchanger.No Release Evident
- PNO-I-80-026, on 800125,27 & 0213,pinhole Leaks Found in Transfer Pipe from Condensate Storage Tank During Insp of Pipe.Contaminated Soil Was Removed & Pipe Replaced.Media Interest Expected
- PNO-I-80-028, on 800214,during Plant Startup W/Turbine at Rated Speed But Not Tied to Grid,Loud Noise Was Heard in Low Pressure Turbine Accompainied by Excessive Vibration. Turbine Coasted to Stop & Could Not Be Rotated
- PNO-I-80-030, on 800218,while Refueling Core W/Pool Clarity & W/Approx 1/3 Core in Place,Problems Experienced in Seating Assembly.Assembly Placed in Core Improperly & Tilted Over. Area Evacuated
- PNO-I-80-031, on 800131,licensee Identified Nine Fuel Assemblies Containing Leaking Fuel Pins.At Least Two Pins Appeared to Have Missing Segments.Cause Not Stated.Damaged Fuel Assemblies Being Replaced
- PNO-I-80-034, on 800302,two Individuals Showed Significant Whole Body Counts of Co-60.Licensee Review Indicated Exposure Occurred While Wiping Down Control Rod Blade Tool W/No Respiratory Protection
- PNO-I-80-034A, on 800302,two Individuals Were Exposed to Co-60.Deposition Calculated in Lungs & Lower Large Intestine within Allowable Quarterly & Lifetime Limits.No Future Action Anticipated
- PNO-I-80-041, on 800313,radiological Surveys of Site Grounds Uncovered Three Small Patches of Contaminated Soil Outside Controlled Area.Approx Three Tablespoons Soil Removed.Survey Continuing to Determine If Other Areas Contaminated
- PNO-I-80-042, on 800317,notified by Several Sources That Radioactive Matl Package Containing 13.8 Ci Ir-192 Source in Radiographic Device Dropped at Philadelphia Airport Was Leaking.Nonradioactive Insulating Matl Spilled Out
- PNO-I-80-043, on 800318,one Truck Full of Chlorine Rail Tank Car Derailed at Broken Switch on Licensee Property.Car Presently Located Outside Protected Area,But Is Upright, Intact, & Stable.Formulating Plans to Replace Car on Rail
- PNO-I-80-044, on 800318,call Received from Individual in Belmont,Ma Re Retrieval of Gamma Sample Charger from Trash Compactor in Winchester,Ma.Unlabelled Sealed Source Reading 11 Mrem/Hr Found.Little Radiation Exposure Occurred
- PNO-I-80-051, on 800328,licensee Reported That Core Spray Sys Sparger Insp Found 28 New Cracks.Proposed Repairs Include Installation of Clamps
- PNO-I-80-054, on 800402,plant Tripped from Full Power Due to Ground in Reactor Protective Sys.Ground Will Be Repaired & Plant Returned to Svc
- PNO-I-80-095, on 800624,Home Transportation Co tractor- Trailer Carrying Low Level Radwaste from Oswego,Ny to Barnwell,Sc Developed Air Suspension Sys & Axle Trouble on Route 81 South of Syracuse,Ny
- PNO-I-80-128, on 800909,portable Gantry Fell on Summer Work/ Study Student Working in Reactor Bldg Causing Fractured Skull & Internal Injuries.Reactor Was Shutdown.No Radiation or Contamination Was Involved
- PNO-I-80-130A, Ocean County,Nj Radiological Officer Conducted Radiation Survey of Landfill Due to Rumors of Radwaste Dumping.No Abnormal Activity Levels Were Detected
- PNO-I-80-135, on 800924,both Containment Spray Pumps Discovered in pull-to-lock Position After Tagging by Operators Per Containment Entry Procedure.Switches Returned to Automatic Position & Change to Procedure Initiated
- PNO-I-80-156, on 801021,plant Superintendent Issued Court Summons to Respond to Concerns of Rowe Nuclear Conversion Campaign.Util Also Notified That Application for Preliminary Injunction & Temporary Restraining Order Had Been Filed
- PNO-I-80-157, on 801023,well Logging Source Containing 1500 Mci Cs-137 Lost at Depth of 3,700 Ft in Franklin Township, Pa.Retrieval Unsuccessful.Hole Will Be Sealed & Placarded If Addl Recovery Attempts Fail
- PNO-I-82-042, on 820611,spent Resin Found on Ground Near Turbine Bldg.Roofs of Turbine,Reactor,Offgas & Retube Bldgs Contaminated.No Personnel or Offsite Locations Contaminated. Source of Resin Under Investigation
- PNO-I-82-042A, Re Release of Spent Resin.Site Surveys Confirmed Contamination of Turbine,Administration,Augmented Offgas & Retube Bldg Roofs.Duct Surveillance Program Established.No Offsite Release Identified
- PNO-I-82-043, on 820614,leak from Trucks Carrying U Hexafluoride for Export Under License XSNM-1913 Noticed at Truck Stop in Keysers Ridge,Md.Trucks & Liquid Surveyed.No Abnormal Radiation Levels Found
- PNO-I-82-044, on 820619,w/Unit 3 at Full Power,Hpci & Reactor Core Isolation Cooling Sys Injected Water to Core for 30 Before Safety Injection Verified Unnecessary.Caused by Degradation of Power Supply Unit
- PNO-I-82-045, on 820618,rept Submitted to Resident Inspector of Apparently Falsified Records of Composition Analysis of Sample Burnable Poison Pellets.Failure to Analyze Pellets Discovered During 820614-18 Audit
- PNO-I-82-046, on 820611,plugged Vent Filter Caused Backflow of Condensate Water & Resin Beads Into Svc Air Sys in New Radwaste Facility
- PNO-I-82-048, on 820701,unit Will Be Shut Down for 3 Days to Repair back0eakage Through Check Valve Between Common Safety Injection Header & Safety Injection Tank 11A
- PNO-I-82-049, on 820630,smoke in Control Bldg Traced to Fire in Two nonsafety-related Cable Trays Just Outside Switchgear Room.Cables Appear to Be Cut as Well as Burned. Damage Limited to Two Cable Trays.Local Police Notified
- PNO-I-82-050, on 820703,1.5 Ci Cs-137 Well Logging Source Severed from Cable Near Bottom of Well in Scottsdale,Pa. Attempts to Recover Source Unsuccessful.Licensee Plans to Cement Hole & Install Plaque Describing Source
- PNO-I-82-052, on 820715,moisture Gauge Containing 8-mCi Cs-137 Rod & 40-mCi Am-241/Be Source Run Over & Damaged by High Lift.Source Retracted Into Lead Shield at Time of Accident.Leak Test Underway.Site Roped Off
- PNO-I-82-053, on 820725,entire Shipment of New Fuel Received at Facility for First Core Load.No Discrepancies Identified
- PNO-I-82-054, on 820723,after Purging Unit 2 Containment Through Encl Bldg Filtration Sys to Unit 1 Vent Stack,Unit 2 Stack Gaseous Release Rates Exceeded Administrative Limits. Caused by Mispositioned Valve in Encl Bldg Exhaust Sys
- PNO-I-82-055, on 820727,Teamsters Union Personnel Demonstrated at Facility Access Road to Protest Delivery of New Fuel.Maint Personnel Transported Fuel to Reactor Bldg. Intervenor Press Conference & Demonstration Planned
- PNO-I-83-038A, on 830427,recirculation Loop a Riser Exam Completed.One Weld in Each of Two Risers Had Crack Indications.Data Forwarded to GE for More Detailed Analysis. Licensee Addressing Repair Method & Impact on Outage
- PNO-I-83-043, on 830430,Troxler Gauge 34-ll-B,containing Approx 40 Mci Am-241 Damaged at Const Site.Caused by Accidentally Cracking Gauge Case W/Backhoe Bucket.Wipes Taken & Analyzed.Gauge Shipped to Manufacturer for Repair
- PNO-I-83-101B, during Dec 1982,water from Irradiator Pool Pumped Onto Facility Floor During Filtering Operations. Contaminated Water Removed.Contaminated Steel Tank Removed During 850819-30
- PNO-I-84-060, on 840703,cold Shutdown Plant Condition Following Reactor Scram from 100% Power
- PNO-I-85-037, on 850516,reactor Shut Down After One of Two Diesel Generators & One of Four LPCI Pumps Found Inoperable. Cause Not Stated.Diesel Generator B Returned to Svc & LPCI Pipe Supports Repaired
- PNO-I-85-037A, on 850523,reactor Shutdown Initiated Due to Lubricating Oil Circulation Pump Motor Tripping on Diesel Generator B.Generator Declared Inoperable.Shutdown Will Be Terminated After Oil Circulation Pump Motor Replaced
- PNO-I-85-039, on 850522,several Fires Identified & Extinguished Outside Facility Structure & Inside Industrial Security Area.Caused by Apparent Arson.Investigation Initiated & Security Measures Increased
- PNO-I-85-041, on 850601,facility Reported Damaged by 850531 Tornado.Small Fire,Resulting from Damage to Transformer, Extinguished by Personnel.No Licensed Matl Disturbed.Media Interest Widespread
- PNO-I-85-042, on 850612,during Recovery Process Following Reactor Trip,Reactor Bldg Deluge Fire Protection Sys Initiated.Caused by Smoke from Hot Blistering Paint on Scram Discharge Vol Piping.Reactor Currently in Cold Shutdown
- PNO-I-85-043, on 850623,10 Indications of Unacceptable Size of Steam Generator Shell Transition Girth Weld Per ASME Section XI Found Through Ultrasonic Exam.Caused by pre-existing Flaws Present After 1983 Repairs
- PNO-I-85-044, on 850628,RCS Water Inventory Balance Indicated Unidentified Leak Rate Increased from 0.72 Gpm (Tech Spec Limit Is 1.0 Gpm) on 850627 & Steam Observed Leaking from Inlet Flange of Pressurizer Relief Valve PR-4
- PNO-I-85-045, anti-Shoreham Demonstrations Planned at Site During Wk of 850705.Demonstrators Plan Civil Disobedience of Nonviolent Nature at Gate.Task Force Established to Plan for Event
- PNO-I-85-046, on 850630,reactor Scrammed from 100% Power Due to Generator Load Reject.Caused by Generator Neutral Phase Overvoltage Condition.Test & Repairs Will Be Completed by 850707
- PNO-I-85-047A, on 850707,initiation of Startup Delayed for 36 H Due to Problems Encountered W/Installation of Structural Support on Two Suppression Pool Temp Instruments. Steam Lines Drained
- PNO-I-85-048, on 850709,maint Worker Suffered First Degree Burns to Hands & Second Degree Burns to Arms & Face While Cleaning 13 Kv Transformer Disconnect Panel.Short Circuit Caused Voltage Transient.Sys Lineup Being Restored
- PNO-I-85-049, on 850712,seven Man Picket Line Was Set Up at Plant Main Entrance to Protest Use of non-union Contractor Employed at Site on 850708.Plant Security Declared Security Alert.Local Police Providing Support for Traffic Control
- PNO-I-85-050, on 850715,reactor Tripped from Full Power When Pressure Dropped to Thermal Margin/Low Pressure Setpoint of Approx 2,130 Psi.Caused by Failure of Both Pressurizer Spray Valves to Shut
- PNO-I-85-051, on 850717,diesel Generator 1 Failed Monthly Surveillance Test Due to Woodward Governor Load Limit Setting Being Set at 3,instead of Normal Setting of 10. Caused by Possible Tampering W/Generator Setting
- PNO-I-85-051A, on 850717,diesel Generator 1 Failed Monthly Surveillance Test.Initially Attributed to Possible Tampering W/Load Limit Setting Knob.Investigation Concluded That Knob May Have Been Inadvertently Moved During Cleaning
- PNO-I-85-052, on 850722,reactor Shutdown Initiated as Result of Degradation of Emergency Svc Water Sys.Caused by HX Differential Pressure Problems.Use of Television Camera to Examine Inner Pipe Wall Planned
- PNO-I-85-053, on 850726,scram Signal Generated Due to Low Reactor Water Level.Normal Suction Valve from Suppression Pool for Loop a Opened Before Alternate Suction for Shutdown Cooling Valve Closed.Approx 3,000 Gallons Drained
- PNO-I-85-054, on 850801,irradiator Containing 22 Ci Co-60 & Other Radioactive Matl Found Underwater Due to Flooding in Stone Science Bldg.Caused by 4-inch Rainfall.Fire Dept Wants to Pump Area to Prevent Electrical Fires
- PNO-I-85-055, instrumentation Valves Mispositioned.State of Me Notified by Telcon on 850807.W/o Encl
- PNO-I-85-056, on 850808,technician Experienced Radiation Exposure by Entering Traversing in-core Probe (TIP) Room. Technician Received 1.29 Rem Dose.Caused by TIP Probe Attaching Cable That Was Recently Stuck in-core
- PNO-I-85-057, on 850812,facility Began Shutdown Due to Unusual Event.Caused by Inoperable LPCI Loop a Due to Diesel Generator E3 Out of Svc for Annual Insp & RHR-LPCI Outer Isolation Valve (MO-154A) Not Opening During Surveillance
- PNO-I-85-058, on 850813,reactor Tripped & Main Steam Line Isolation Occurred Due to Indicated Steam Line Area High Radiation.Caused by Air Introduction Into Feedwater Sys While Placing Demineralizer in Svc
- PNO-I-85-059, on 850815,unplanned 2% Power Excursion Occurred for 3-5 While Increasing Power to Permit Operational Testing of HPCI Sys.Power Ascension Program Testing Suspended Until Problem Resolved
- PNO-I-85-060, on 850819,unit Shut Down.Caused by Diesel Generator E2 Out of Svc for Annual Insp & RHR-LPCI Outer Isolation Valve MO-154A Not Opening During Surveillance. Valve Will Be Repaired & Diesel Generator Returned to Svc
- PNO-I-85-061, on 850827,Inst of Scrap Iron & Steel Reported Slightly Contaminated Steel at Unidentified Facility Near Pittsburgh,Pa.Caused by Ra-226 Contamination from Well Drilling Equipment
- PNO-I-85-062, on 850829,at 100% Power,Reactor Tripped & Safety Injection Occurred.Caused by Broken Pipe Fitting on Instrument Air Compressor Tank in Turbine Bldg.Pressurizer Pressure Restored to Normal
- PNO-I-85-064, on 850904,carbon Dioxide Fire Protection Sys Initiation Occurred,Causing Discharge of 17 Tons of Liquid Cardox Into Fuel Storage Area.Plant Evacuated & Search & Rescue Stations Established
- PNO-I-85-064A, on 850904,gas Discharged Into Diesel Generator Through Fire Suppression Sys Nozzles & Drifted to Access Bay for Four Fuel Tank Rooms & Adjacent Areas.Cause Unknown. Investigation Underway
- PNO-I-85-066, on 850907,fire Broke Out in Relay Room During CRD Surveillance Testing.Reactor Manually Tripped.Licensee Troubleshooting to Determine Cause
- PNO-I-85-066A, on 850911,licensee Implemented Maint/Test Procedure to Identify Cause of 850907 Fire in CRD Power Distribution Panels.Fire Caused by Overload of Rods on Auxiliary Power Supply,Causing Excessive Dc Current
- PNO-I-85-067, on 850923,malfunction of One Reactor Protection Sys Ac Breaker Caused Small Electrical Fire.Operator Deenergized Breaker from Feeder Bus & Fire Extinguished. Spare Breaker Installed
- PNO-I-85-067A, on 850924-25,failed Reactor Protection Sys Breaker Removed & Examined.Failure Caused by Mechanical Binding within Breaker Closure Assembly.Investigation Continuing
- PNO-I-85-068, on 850923,chemistry Technician Determined to Be Missing & Possibly Drowned After Being Sent to Obtain Environ Water Grab Sample from Discharge Canal.Search by Util & State Police Unsuccessful
- PNO-I-85-069, on 850921,fire Caused Damage to Large Portion of Lab,Resulting in Possible Loss of 75 Mci C-14. Investigation Continuing
- PNO-I-85-070, on 850925,RHR Loop B & HPCI Inoperable.Caused by Sheared Motor Mounting Bolts on Motor Operator.Piping Sys Integrity Unaffected
- PNO-I-85-071, on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35%
- PNO-I-85-071A, on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered Damage
- PNO-I-85-072, advising That Current Util Contract W/Yoh Security Guards Expires on 851001.Contingency Security Guard Force Assembled.Strike Not Expected to Affect Plant Operations
- PNO-I-85-073, on 851001,unit Placed in Cold Shutdown After Ground Fault Found in Reactor Coolant Pump Motor.Pump Motor Will Be Removed to Allow Util & GE to Determine Whether Fault Accessible
- PNO-I-85-074, wastes Containing I-125,H-3,I-131,Cl-36 & P-32 Lost.Untrained Custodial Worker Entered Labs & Emptied Wastes Into Normal Trash Compactor.Waste Removed & Disposed of in Saugus,Ma
- PNO-I-85-075, on 851006,plant Tripped.Caused by Condensation in Condenser Vacuum Sensing Line Reaching Sensor Causing Turbine Trip W/Automatic Reactor Trip.Plant in Cold Shutdown for Maint & Mod to Condenser
- PNO-I-85-076, on 851009,reactor Shut Down After Unsuccessful Attempt to Identify Cause of 1.5 Gpm Leak from Reactor Coolant Pump 11A Controlled Bleed Off Line.Caused by Cracked Weld
- PNO-I-85-077, on 851008,radiographer Received Whole Body Dose of 15.5 Rem.Caused by Failure to Retract 100-Ci Ir-192 Source to Shielded Position in Exposure Device.Radiographer Removed from Radiation Work for Remainder of Quarter
- PNO-I-85-078, on 851011,isolation Valve to Low Pressure Sys Piping Opened & Discharge of Reactor Coolant to Cleanup Demineralizer Precoat Pump Area Occurred.Cause Under Investigation.Cleanup in Progress
- PNO-I-85-078A, on 851011,reactor Coolant Spill from RWCU Sys to 779 Ft Elevation of Reactor Bldg Occurred.Caused by Lifting of 150 Psig Precoat Feed Relief Valve.Spill Cleaned & Access to Area Restored
- PNO-I-85-079, on 851016,steam Leak Identified on Drain Line from Associated Main Turbine Control Valve Header.Caused by through-wall Crack in Weld Associated W/Pipe Elbow.Power Reduced from 40% to Make Repairs
- PNO-I-85-080, on 851017,plant Tripped on Low Level Due to Loss of All Three turbine-driven Main Feed Pumps.Cause Unstated.Reactor Vessel Level Recovered by HPCI & RCIC Injection
- PNO-I-85-081, on 851022,missing 50-mCi Cs-137 Brachytherapy Source Reported.Source Possibly Removed from Premises by Laundry Servicer.State of Nj Informed
- PNO-I-85-082, on 851018,4 Kv nonsafety-related Electrical Breaker Exploded,Injuring Two Const Workers.Workers Taken to Hosp for Treatment.Vendor Representatives & OSHA Investigating Cause of Event
- PNO-I-85-083, on 851031,unmonitored Release of 1,600 Gallons Radioactive Water from Unit 1 Boric Acid Holding Tank Occurred.Caused by Personnel Error.Leak Isolated & Sewers Monitored.Unit 2 Worker Contaminated on Shoe
- PNO-I-85-084, on 851101,plant Scrammed from 100% Power Due to Loss of Instrument Air & Failure of Feed Regulator Valves to Lockup.Licensee Will Install Correct Cable to One Dc Emergency Isolation Valve
- PNO-I-85-085, on 851106,fire Protection Deluge Sys in Cable Tunnel Automatically Actuated.Smoke Smelled at Scene.Sys Isolated After 10 Minutes of Operation.Visual Insp of Cable Tunnel Revealed No Apparent Damage
- PNO-I-85-085A, on 851106,licensee Secured from Unusual Event Declared Due to Automatic Actuation of Cable Tunnel Deluge Sys.Caused by Faulty Printed Circuit Card.Ground on Nonvital Bus Damaged by Deluge Sys Corrected
- PNO-I-85-086, Nuclear Pharmacy,Inc Delivery Drivers Threatened to Call Strike During Wk of 851111 at Philadelphia Pharmacy.Licensee Mgt & Drivers Negotiating.Mgt Believes No Agreement Will Occur to Prevent Strike
- PNO-I-85-087, on 851120,reactor Scram Occurred Due to Main Generator Trip Causing Main Turbine Trip.After Scram,Main Steam Lines Isolated.Plant Brought to Cold Shutdown.Operator Manually Initiated Isolation Condenser
- PNO-I-85-088, on 851121,normal 345 Kv Offsite Power Lost as Result of Personnel Error During Surveillance of Offsite Power Source Breakers.Emergency Gas Turbine Generator Failed to Start.Shutdown Capability Lost for 5 Minutes
- PNO-I-85-089, on 851118,employee Received About 250 Rems C-14 to Skin of Hand.Caused by Spill & Inappropriate Gloves. Employee Will Be Examined by Physician.Detailed Measurements & Calculations Ongoing
- PNO-I-85-090, on 851202,Units I & II Tripped from Full & 80% Power,Respectively.Caused by Deenergization of Engineered Safeguards Svc Transformer III & Momentary Loss of Control to Reactor Feed Pumps.Transformer Being Tested
- PNO-I-85-091, on 851202,univ Inadvertently Disposed of Package Containing 2 Mci P-32 to Normal Trash.Trash Subsequently Transferred to Landfill & Buried Under Large Amount of Trash.Hazard to Public Minimal
- PNO-I-85-092, on 851205,PUC of State of PA Voted 3.2 Billion Dollar Cost Cap.Unit About 30% Complete.Restart of Const Planned in Jan 1986 Pending Board of Directors Approval.Fuel Load Planned for Early 1990
- PNO-I-85-094, on 851226,reactor Scrammed on Low Reactor Water Level.Caused by Loss of Feed Pump & Fluctuations in Feedwater Level Control Sys.Condensate & Feedwater Sys Isolated.Rcic Sys Manually Started to Control Water Level
- PNO-I-85-095, on 851230,seal Failure on RCS Makeup Pump 1A Occurred,Spilling Approx 300 Gallons of Water on Floor.Nine Personnel Slightly Contaminated.Approx 46 Ci Released from Plant.Pump Drained.Personnel Cleaned Up Room
- PNO-I-86-001, on 860109,technician Entered High Radiation Area During Treatment of Patient Undergoing Co-60 Teletherapy.Door Interlock on Treatment Room Inoperative. Exposure Estimated at No Greater than 100 Mrems
- PNO-I-86-002, on 860109,fire Protection Deluge Sys for Auxiliary Transformer Manually Actuated by Unknown Person at Local Fire Box.Caused by Intentional Act of Tampering or Harassment.Addl Security Patrols Instituted
- PNO-I-86-003, on 860115,reactor Manually Scrammed After Power Reduction to 70%.Caused When Oil Observed Spraying from Main Transformer.Oil Spray Caused by Excessive Heat Buildup.Transformer Will Be Inspected & Repaired
- PNO-I-86-004, on 860117,nine Plant Workers Contaminated w/short-lived Rb-88 & Cs-138.Caused by Buildup of Gases in Offgas Bldg After Offgas Sys Shut Down for Maint.Slight Radioactivity Detected at Bldg Vent
- PNO-I-86-005, on 860118,licensee Conducted Normal Reactor Shutdown After Discovering Potential for Overstressing Containment Penetration in Event of Postulated Emergency Condenser Steam Line Break.Evaluation Continuing
- PNO-I-86-006, on 860123,facility Achieved Initial Criticality.Criticality Boron Concentration Was 1,591 Ppm, 32 Ppm Above Predicted Concentration & within Tech Spec Max Margin of 100 Ppm
- PNO-I-86-007, on 860123,bomb-like Device Discovered in Containment Encl Ventilation Fan Room.Both Plant & State of Nh Police Notified.Plant Police Conducting Investigation.No Bomb Threat Received
- PNO-I-86-008, on 860124,unit Scrammed from 95% Power After Diesel Generator E-2 Tripped When Loaded W/Certain Emergency Buses.Caused by Mechanical Failure of Scavenging Air Blower. Addl Damage Caused by Debris
- PNO-I-86-009, on 860127,reactor Shut Down to Repair Leaking Expansion Bellows on Feedwater Heater Extraction Steam Line. Cause of Leakage Not Stated.Outage Should Last 1 Wk
- PNO-I-86-009A, on 860204,plant Restarted Following Outage to Replace Turbine Extraction Steam Bellows Inside Main Condenser
- PNO-I-86-010, on 860123,Mo-99-Tc-99m Generator Picked Up by Federal Express for Shipment to Hollywood,Fl.Generator Lost in Transit.Federal Express Presently Searching.Safety Hazard Possible If Package Opened & Contents Released
- PNO-I-86-011, on 860201,plant Placed in Commercial Operation. Plant Operating at 99.5% Power.Util Received License to Load Fuel & Conduct Low Power Testing on 841026 & full-power License on 850808
- PNO-I-86-012, on 860206,during Routine Closure Surveillance, Inboard MSIV Failed to Close.Main Steam Lines Isolated.One Inboard MSIV Remains Open.Investigation & Repair of Valve Underway
- PNO-I-86-013, on 860207,150 Rads of Co-60 Administered to Wrong Patient.Patient Treatment Suspended Pending Results of Internal Investigation
- PNO-I-86-013A, on 860207,wrong Patient Received Prescribed Dose of 150 Rads After Kidney Transplant.Caused When Clerk Entered Order for Wrong Kidney Patient.Proper Patient Treated.Required Notifications Made
- PNO-I-86-014, on 860208,squib Valve a Failed to Open When Sys Actuated.Caused by Firing Circuit Being Miswired. Wiring Error Alo Exists in Squib B.Reactor Currently Defueled as Part of Extended Outage for Piping Replacement
- PNO-I-86-015, on 860216,water in Condenser Pumped to Condensate Storage Tank,Resulting in Overflow.Caused by Blown Fuse in Main Condenser Hotwell Level Control Sys.Water Drained by Yard Drain Sys & Released to River
- PNO-I-86-017, on 860220,CPN Corp Model MC-2 Moisture/Density Gauge w/10-mCi Cs-137 & 50-mCi Am-241 Sources Reported Stolen.Gauge Stored in Locked Case in Locked Wooden Box Nailed to Floor of Locked Trailer.Locks Broken
- PNO-I-86-018, on 860214,83-mCi Cs-137 Calibr Source Discovered Missing.Theft Suspected Due to Lock on Source Holder Being Changed.Investigation in Progress