Suppl to 1986 Annual Environ Operating Rept.Procedures Will Be Initiated by 871031 for Submittal of NPDES Permit Changes.All Permit Changes Will Be Submitted to NRC
ML20237J784
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/11/1987
From: Mroczka E, Werner R
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
B12631, NUDOCS 8708180338
Download: ML20237J784 (2)


Text

r

  • NORTHEAST UTILITIES -

m ccm cucui m ,' mo.oma cow =v ceners Omces . seioen street. seriin connecticut u vun.ss.c,.u nnmu. c"* P.O. BOX 270 J ,am **na nc,ma cow ='

HARTFORD, CONNECTICUT 06141-0270 L L J ((C][.[,'7.", (203) 665-5000 August 11,1987 Docket No. 50-423 B12631 Re: 10CFR50.54 10CFR50.36b U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

References:

(1) Millstone Nuclear Power Station, Unit No. 3,1986 Annual Environmental Operating Report submitted April 30, 1987, Docket No. 50-423.

(2) Northeast Nuclear Energy Company letter to U.S. Nuclear Regulatory Commission, dated March 6,1987, Docket No. 50-423 on Millstone Nuclear Power Station Unit No. 3:

September 19, 1986 Modification to NPDES Permit No. CT0003263; EPP.

(3) Environmental Protection Plan (Nonradiological), Appendix B to Facility Operating License NPF-49, Millstone Nuclear Power Station, Unit No. 3, Northeast Nuclear Energy lj Company, Docket No. 50-423.

4 Gentlemen:

Supplement to 1986 Annual Environmental Operating Report for Millstone Nuclear Power Station, Unit No. 3 Environmental Protection Plan (EPP) Noncompliance After reviewing audit results for 1986, the Environmental Review Board (ERB) has identified one EPP noncompliance. Therefore, Northeast Nuclear Energy Company (NNECO) submits this supplement to the 1986 Annual Environmental Operating Report as committed by Reference (1).

.The EPP noncompliance is that a copy of the modified NNECO NPDES Permit was not submitted to you until March 6,1987 (Reference (2)), rather than as required by Section 3.2 of the Millstone Unit No. 3 EPP (Reference (3)). In the March 5,1987 subinittal, we stated incorrectly that the modification to the l

NPDES permit involved only Millstone Unit No. 2. In fact, the modified NPDES permit also incorporated several changes for Millstone Unit No. 3, including I discharge of boric acid, hydrazine and steam generator chemical i- decontamination wastewater.

l gB180338870ggi gg ADDCK 05000423 i PDR \

i L  :. _ _- _ _ _ . _ _ _ _ __ i

l i

NORTHEAST UTILITIES cenerai Orrices a seioen street. seriin. Connecticut J um mmcaem nwac c== P.O. BOX 270 wx*"'""**'"" H ARTFORD, CONNECTICUT 061410270 L L J C,2 C$.Yi c,[ (203) 665-5000 August 11,1987 Docket No. 50-423 B12631 Re: 10CFR50.54 10CFR50.36b U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

References:

(1) Millstone Nuclear Power Station, Unit No. 3,1986 Annual Environmental Operating Report submitted April 30, 1987, Docket No. 50-423.

(2) Northeast Nuclear Energy Company letter to U.S. Nuclear Regulatory Commission, dated March 6,1987, Docket No. 50-423 on Millstone Nuclear Power Station Unit No. 3:

September 19, 1986 Modification to NPDES Permit No. CT0003263; EPP.

(3) Environmental Protection Plan (Nonradiological), Appendix B to Facility Operating License NPF-49, Millstone Nuclear Power Station, Unit No. 3, Northeast Nuclear Energy Company, Docket No. 50-423.

Gentlemen:

Supplement to 1986 Annual Environmental Operating Report for Millstone Nuclear Power Station, Unit No. 3 Environmental Protection Plan (EPP) Noncompliance After reviewing audit results for 1986, the Environmental Review Board (ERB) has identified one EPP noncompliance. Therefore, Northeast Nuclear Energy Company (NNECO) submits this supplement to the 1986 Annual Environmental Operating Report as committed by Reference (1).

The EPP noncompliance is that a copy of the modified NNECO NPDES Permit was not submitted to you until March 6,1987 (Reference (2)), rather than as required by Section 3.2 of the Millstone Unit No. 3 EPP (Reference (3)). In the March 6,1987 submittal, we stated incorrectly that the modification to the NPDES permit involved only Millstone Unit No. 2. In fact, the modified NPDES

. permit also incorporated several changes for Millstone Unit No. 3, including discharge of boric acid, hydrazine and steam generator chemical decontamination wastewater.

gB18033887oggg gg ADOCK 05000423 h

PDR .

A________m__._.._ _ . __

U.S. Nuclear Regulatory Commission B12631/Page 2 August 11,1987 l

1 Corrective Action

1. As noted, the modified NPDES permit was submitted in March 1987 (Reference (2)).
2. As a result of ERB discussions and preparing this letter, necessary plant and supporting corporate personnel have been made properly aware of reporting requirements related to NPDES permit changes. Since there is one NPDES permit for the entire Millstone Nuclear Power Station, NNECO inteads to submit all Millstone NPDES permit changes to the NRC. This will develop a consistent habit and help preclude missing a submittal of NPDES permit changes that, for example, focus on Millstone Unit No. 2 but also affect Millstone Unit No. 3. l l
3. In addition, the corporate staff that has lead responsibility for submittal of l NPDES permit changes will have a procedure in place by October 31,1987 l to ensure copics of NPDES permit changes are sent to the NRC.

If you have any questions or require further information, please contact us.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY p c> ~

E. 3. Mrocika v Senior Vice President

'/ - w r-By: R. P. Werner Vice President cc: W. T. Russell, Region I Administrator R. L. Ferguson, NRC Project Manager, Millstone Unit No. 3 W. 3. Raymond, Resident inspector, Millstone Unit No. 3