Letter Sequence Other |
---|
|
|
MONTHYEARB12000, Proposed Tech Spec Revs,Expanding Storage Capacity of Spent Fuel Pool by Storing Consolidated Spent Fuel in Fuel Storage Racks1986-05-31031 May 1986 Proposed Tech Spec Revs,Expanding Storage Capacity of Spent Fuel Pool by Storing Consolidated Spent Fuel in Fuel Storage Racks Project stage: Other ML20212M2341986-08-21021 August 1986 Forwards Suppl to 860725 Request for Addl Info Re 860521 Application to Amend License DPR-65 to Permit Storage of Consolidated Spent Fuel in Spent Fuel Pool.Response Requested within 60 Days of Ltr Receipt Project stage: RAI ML20206Q3231986-08-27027 August 1986 Forwards Draft Technical Evaluation Rept,Millstone 2 - Storage of Consolidated Spent Fuel Tech Spec Change Per Review of Util 860521 Application.Response to Questions Included in Rept Requested within 60 Days of Ltr Receipt Project stage: Draft Approval ML20206Q3321986-08-31031 August 1986 Draft Technical Evaluation Rept,Millstone 2 - Storage of Consolidated Spent Fuel Tech Spec Change Project stage: Draft Other ML20214P7781986-09-22022 September 1986 Forwards Request for Addl Info to Facilitate Review of 860521 Application to Store Consolidated Spent Fuel.Response Requested within 30 Days of Receipt of Ltr Project stage: RAI A06007, Responds to 860821 Request for Addl Info Re Util 860521 Request to Amend License DPR-65 to Allow Storage of Consolidated Spent Fuel in Spent Fuel Storage Pool1986-10-22022 October 1986 Responds to 860821 Request for Addl Info Re Util 860521 Request to Amend License DPR-65 to Allow Storage of Consolidated Spent Fuel in Spent Fuel Storage Pool Project stage: Request A06028, Forwards Addl Info Re Application to Amend License DPR-65 to Allow Storage of Consolidated Spent Fuel in Spent Fuel Storage Pool,Per NRC Request1986-10-30030 October 1986 Forwards Addl Info Re Application to Amend License DPR-65 to Allow Storage of Consolidated Spent Fuel in Spent Fuel Storage Pool,Per NRC Request Project stage: Request B12383, Submits Addl Clarification of Util 861030 Response to NRC Request for Addl Info Re Proposed Amend to License DPR-65, Allowing Storage of Consolidated Spent Fuel in Spent Fuel Storage Pool,Per NRC 861208 Request1987-01-0202 January 1987 Submits Addl Clarification of Util 861030 Response to NRC Request for Addl Info Re Proposed Amend to License DPR-65, Allowing Storage of Consolidated Spent Fuel in Spent Fuel Storage Pool,Per NRC 861208 Request Project stage: Request ML20207S4991987-03-0909 March 1987 Forwards Request for Addl Info Re Util 860526 Submittal on Consolidation of Spent Fuel at Facility.Response Requested within 45 Days of Ltr Receipt Project stage: RAI B12539, Proposed Tech Specs,Authorizing Storage of Up to 10 Consolidated Spent Fuel Assemblies in Spent Fuel Pool1987-05-27027 May 1987 Proposed Tech Specs,Authorizing Storage of Up to 10 Consolidated Spent Fuel Assemblies in Spent Fuel Pool Project stage: Other ML20214T7301987-05-27027 May 1987 Suppl to 860521 Application for Amend to License DPR-65, Authorizing Storage of Up to 10 Consolidated Spent Fuel Assemblies in Spent Fuel Pool for Interim Period,Pending NRC Approval of Permanent Spent Fuel Storage Project stage: Request 1986-08-27
[Table View] |
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS ML20155B0331998-10-22022 October 1998 Proposed Tech Specs Changing TS 3.3.2.1, Instrumentation - ESFAS Instrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F ML20154A3701998-09-28028 September 1998 Proposed Tech Specs Sections 3.3.2.1,3.4.6.2,3.4.8,3.6.2.1, 3.6.5.1,3.7.6.1 & 3.9.15,revising Info Re Revised MSLB Analyses & Revised Determinations of Radiological Consequences of MSLB & LOCA ML20154C0491998-09-28028 September 1998 Proposed Tech Specs Revising FSAR Separation Requirement of Six Inches Which Is Applied to Redundant Vital Cables, Internal Wiring of Redundant Vital Circuits & Associated Devices ML20151V5011998-09-0909 September 1998 Proposed Tech Spec Changing TS Definitions 1.24,1.27,1.31, 3.0.2,4.0.5,3.2.3,3.3.2.1,3.4.1.1,3.4.11 & Adding TS 3.0.6 B17385, Proposed Tech Specs 6.9.1.8b,updating List of Documents Describing Analytical Methods Specified1998-08-12012 August 1998 Proposed Tech Specs 6.9.1.8b,updating List of Documents Describing Analytical Methods Specified B17341, Proposed Tech Specs Surveillance 4.4.5.3.a Re SG Tube Insp Interval1998-08-0606 August 1998 Proposed Tech Specs Surveillance 4.4.5.3.a Re SG Tube Insp Interval ML20236Y0831998-08-0404 August 1998 Proposed Tech Specs Changing TS 3.7.1.3, Plant Sys - Condensate Storage Tank & Adding TS 3.7.1.7, Plant Sys - Atmospheric Steam Dump Valves ML20236X2521998-07-30030 July 1998 Proposed Tech Specs Bases 3/4.9.1,3/4.1.1.3,3/4.7.1.6, 3/4.7.7,3/4.5.4 & 3/4.3.3.10,resolving Miscellaneous Condition Repts ML20236W0201998-07-30030 July 1998 Proposed Tech Specs Bases Section 3/4.6.1.1,clarifying Administrative Controls for RHR Isolation Valves When RHR Sys Is in Svc for Core Cooling ML20236T2681998-07-21021 July 1998 Proposed Tech Specs Re Reactor Protection & ESFs Trip Setpoints ML20236T5301998-07-17017 July 1998 Proposed Tech Specs Pages for TS Bases Section 3/4.4.9, Pressure/Temperature Limits ML20236T7331998-07-17017 July 1998 Proposed Tech Specs Modifying DG Testing Requirements ML20249A2811998-06-10010 June 1998 Proposed Tech Specs Re Post Accident Access to Vital Areas (Plar 3-98-6) ML20249A3121998-06-0606 June 1998 Proposed Tech Specs Re SLCRS Bypass Leakage (Plar 3-98-5) ML20249A2681998-06-0505 June 1998 Proposed Tech Specs Re Revised Steam Generator Tube Rupture Analysis (Plar 3-98-4) ML20248M2221998-06-0404 June 1998 Revised Tech Specs Pages,Changing TS Bases Section 3/4.7.1.5 to Reword Section Which Describes Limiting Temperature Case for Containment Analysis ML20247G6841998-05-14014 May 1998 Proposed Tech Specs,Modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time Most Reactor Protection or Esfa Channels Can Be in Bypass Position to 48 Hours,From Indefinite Period of Time B17211, Proposed Tech Specs Re Refueling Water Storage Tank Back Leakage1998-05-0707 May 1998 Proposed Tech Specs Re Refueling Water Storage Tank Back Leakage ML20247B9411998-05-0101 May 1998 TS Change Pages for TS Bases Section 3/4.5.4,modifying Wording Associated W/Refueling Water Storage Tank Minimum Boron Concentration ML20217D5941998-04-30030 April 1998 Proposed Tech Specs Re Change to Basis 3/4.6.4 Which Modifies Accuracy Range Associated W/Measured Std Cubic Feet Per Minute & Corrects Listed Component Number ML20217N9441998-04-29029 April 1998 Proposed Tech Specs Replacing Two low-range Pressurizer Pressure transmitters,PT-103 & PT-103-1,which Will Identify That Two low-range Pressurizer Pressure Instrument Channels Are Independent & Redundant Only 1999-09-07
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20155B0331998-10-22022 October 1998 Proposed Tech Specs Changing TS 3.3.2.1, Instrumentation - ESFAS Instrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F 1999-09-07
[Table view] |
Text
.
U.S. Nuclear Regulatory Commission B12539 May 27, 1987 ATTACHMENT NO. 1 MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2 f
SAMPLE TECllNICAL SPECIFICATION PAGES FOR INTERIM LICENSE AMENDMENT i
i i
)
May, 1987 07061003'?!? Y9onp7 PDit AI)OCK 05000336 l' PDit
l
}
REFUELING OPER ATIONS SPENT FilEL POOL i I
LIMITING CONDITION FOR OPER ATION 3.9.19 Prior to consolidation of spent fuel assemblies, the candidate fuel assemblies %ust have decayed for at least 3 years.
APPLICABILITY: During all consolidation operations. ;
ACTION:
With the requirements of the above specification not satisfied, replace candidate assembly with an appropriate substitute or suspend all consolidation activities.
StJRVEILLANCE REQUIREMENTS 4.9.19 The decay time of all candidate fuel assemblies for consolidation shall be determined to be greater than or equal to five years within 7 days prior to inoving the fuel assembly into the consolidation work station. ,
i t
i I
I l
l
- 'lhe storage of concilidateil spent ruel ( *i limited to five ($) connolidatett Hpent fuel storar,e canistern (ie., 10 npent fuel annerblien con *olidated !
into 5 atorace cantnterm/locationu), ;
1 MILLSTONE - UNIT 2 3/4923
(
DE5lGN FEATURES I VOLUME 3.4.2 The total water and steam volume of the reactor coolant system is i 10,060 + 700/-0 cubic feet.
5.5 EMERGENCY CORE COOLING SYSTEMS 3.5.1 The emergency core cooling systems are designed and shall be i maintained in accordance with the original design provisions contained in Section 6.3 of the FSAR with allowance for normal degradation pursuant to the l applicable Surveillance Requirements. l 3.6 FUEL STORACE CRITICALITY 3.6.1 a) The new fuel (dry) storage racks are designed and shall be ,
maintained with sufficient center to center distance between assemblies to ,
ensure a K,gg less-than-or-equal-to 0.93. The maximum fuel enrichment to be I
- 1 stored in these racks is 3.70 weight percent of U-233. ;
b) Region I of the spent fuel storage pool is designed and shall be .
maintained with a nominal 9.8 inch center to center distance between storage :
locations to ensure a Kegg less than or equal to 0.95 with the storage pool filled !
with unborated water. Fuel assemblies stored in this region may have a ,
maximum fuel enrichment of 4.3 weight percent of U 23). Consolidated fuel i storage bones may also be stored in this region. !
c) Region 11 of the spent fuel storage pool is designed and shall be !
maintained with a 9.0 inch center to center distance between storage locations j to ensure a Kefg less than-or equal to 0.93 with the storage pool filled with unborated water. Fuel assemblies stored in this region must comply with Figure 3.91 to ensure that at least 83% of the design burn-up has been sustainsd. The contents of consolidated fuel storage boxes to be stored in this region must >
comply with Figure 3.9 3.
l d) Region !! of the spent fuel storage pool is des llLned to permit storage of consolidated fuel in the 4th location of the storage rac< and ensure a K,gg less than.or equal to 0.93. >
DRAINAGE 3.6.2 The spent fuel storage pool is designed and shall be maintained to ;
prevent inadvertent draining of the pool below elevation 22'6". j CAPACITY l 3.6.3 The spent fuel atorage pool is designed and shall be maintained with a i storage capacity limited to no more than 384 storage locitions in Replon I and !
962 storane locations in Realon 11 for a total of 1346 storage locations. !
(* 1hin Ernn.ilnica into Tu/ ntornne toent tonn to roccive npent fuel anil l MILL 5 TONE - UNIT 2 33
l .
U.S. Nuclear Regulatory Commission l B12539 May 27, 1987 l
ATTACHMENT NO. 2 MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2 l
l SAMPLE TECilNICAL SPECIFICATION PAGES FOR FULL LICENSE AMENDMENT Hay, 1907 l
- . _ _ _ . _ . _ _ _ _ _ _ _ _ _ . _ . ____-__-_m_.-.m- _ - _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ . . _ _ _ _ _ . _ _
REFUELING OPER ATIONS SPENT FIlEL POOL ;
LIMITING CONDITION FOR OPERATION 3.9.19 Prior to consolidation of spent fuel assemblies, the candidate fuel assemblies must have decayed for at least 5 years.
4 APPLICABILITY: During all consolidation operations.
ACTION:
With the requirements of the above specification not satisfied, replace candidate assembly with an appropriate substitute or suspend all consolidation activities.
StJRVEILL ANCE REQUIREMENTS 4.9.19 The decay time of all candidate fuel assemblies for consolidation shall be determined to be greater than or equal to five years within 7 days prior to rnoving the fuel assembly into the consolidation work station.
i i
l 1
1 MILI.570NE - UNIT 2 3/4 9-23
DESIGN FEATURES VOLUME 3.4.2 The total water and steam volume of the reactor coolant system is 10,060 + 700/-0 cubic feet.
5.5 EMERGENCY CORE COOLING SYSTEMS 5.5.1 The emergency core cooling systems are designed and shall be
- maintained in accordance with the original design provisions contained in Section 6.3 of the FSAR with allowance for normal degradation pursuant to the applicable Surveillance Requirements.
5.6 FUEL STORAGE CRITICALITY 5.6.1 a) The new fuel (dry) storage racks are designed and shall be maintained with sufficient center to center distance between assemblies to i ensure a K ef f ess-than-or-equal-to l 0.95. The maximum fuel enrichment to be I stored in these racks is 3.70 weight percent of U-235.
b) Region I of the spent fuel storage pool is designed and shall be maintained with a nominal 9.8 inch center to center distance between storage locations to ensure a Kegg less than-or-equal-to 0.95 with the storage pool filled with unborated water. Fuel assemblies stored in this region may have a maximum fuel enrichment of 4.5 weight percent of U-235. Consolidated fuel
, storage boxes may also be stored in this region.
c) Region II of the spent fuel storage pool is designed and shall be maintained with a 9.0 inch center to center distance between storage locations to ensure a Kegg less-than-or-equal-to 0.95 with the storage pool filled with unborated water. Fuel assemblies stored in this region must comply with Figure 3.9-1 to ensure that at least 85% of the design burn-up has been sustained. The contents of consolidated fuel storage boxes to be stored in this region must
- comply with Figure 3.9-3.
d) Region II of the spent fuel storage pool is designed to permit storage of consolidated fuel in the 4th location of the storage rack and ensure a Kegg less-than-or-equal-to 0.95.
DR AINACE 3.6.2 The spent fuel storage pool is designed and shall be maintained to prevent inadvertent draining of the pool below elevation 22'6".
CAPACITY 1
5.6.) The spent fuel storage pool is designed and shall be maintained with a storage capacity limited to no more than 384 storage locations in Replon I and
- 962 storage locations in Region ll for a total of 1346 storage locations P mi9 tranalntem into i m ntornae locations to receive " pent ruct ani!
MILL 5 TONE - UNIT 2 " " " * " tomtlonn to main mom.)