AECM-83-0822, Interim Part 21 Rept Re Failure of Fuel Oil Mfg by Transamerica Delaval Adjacent to Male Branch Tee on Div I Diesel Generator.Initially Reported on 831230.Fuel Oil Line Support Installed.Next Rept by 840413

From kanterella
Jump to navigation Jump to search
Interim Part 21 Rept Re Failure of Fuel Oil Mfg by Transamerica Delaval Adjacent to Male Branch Tee on Div I Diesel Generator.Initially Reported on 831230.Fuel Oil Line Support Installed.Next Rept by 840413
ML20086G684
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/03/1984
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-83-106-000 AECM-83-0822, AECM-83-822, PT21-83-106, PT21-83-106-000, NUDOCS 8401120350
Download: ML20086G684 (5)


Text

.

/.

P MISSISSIPPl POWER & LIGHT COMPANY

~

Helping Build Mississippi P. O. B O X 16 4 0. J A C K S O N, MIS SIS SIP PI 3 9 2 0 5 n8: 50

^

", 6 NUCLEAR PRODUCTION DEPARTMENT January 3, 1984 Of fice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303 At tention: Mr. J. P. O'Reilly, Regional Administrator Daar Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/15525/15526/16694.4 PRD-83/17, Interim Report, Diesel Generator Low Pressure Fuel Oil Line Failure AECM-83/0822 On December 30, 1983, Mississippi Power & Light Company notified Mr. D.

Verelli, of your of fice, of a Reportable Deficiency at the Grand Gulf Nuclear Station (CGNS). The deficiency concerns the failure of a fuel oil line immediately adjacent to a male branch tee on the Unit 1, Division I diesel generator.

MP&L has evaluated this deficiency and determined that it is reportable under the provisions of 10CFR21 for Unit 1. The investigation is continuing to determine reportability or corrective action required for Unit 2.

Details are provided in our attached Interim Report. MP&L expect s to submit the next report by April 13, 1984.

Yours truly

-7

/ [ J. P. McGaughy, Jr.

RDC:ky ATTACHMENT cc: See page 2 ._ _ _ __

,r-8401120350 84G103 PDR ADOCK 05000416 S PDR hy (c[

Member Middle South Utilities Sy,, tem 8 I

y M:r. J. P. O'Reilly-

. AECM-83/0822 NRC Page 2 cc: . Mr. J . . B. Rich ard

Mr. R. B. McGehee Mr..T. B. Conner Mr. Richard C.'DeYoung, Director Of fice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Mr. G. B. Taylor South Miss. Electric Power Association P.
0. Box 1589 Hattiesburg, MS 39401 l

t .

i l

l I

L l

l I

I l

l l

l

y. .

+- ..

~

Attachment to AECM-83/0822 Page 1 of 3

. INTERIM REPORT POR' PRD-83/17

't. Name and address' o'f the individual .. . informing the commission:

1 1

J. P. McGaughy, Jr. )

'Vice-President, Nuclea r 1 P.O. Box 1640

' Jackson, Mississippi 39205 This deficiency was also reported under 10CFR21 by Transamerica Delaval to the NRC in their. letter dated September 21, 1983.

I 2.. Identification of the facility ... which .. contains a deficiency

, Grand Gulf Nuclear Station (GGNS) Unit 1.

Port,Gibson, Mississippi 39150 3.. Identification of the firm ... supplying the basic component which .. .

contains a deficiency:

The low pressure - fuel. line asemblies were manufactured _ by Transamerica Delaval, Inc. , and supplied to Grand Gulf by Bechtel Power Corporation, Gaithersburg, Maryland.

4. Nature of the deficiency ... and the safety hazard which ... could be created by such a deficiency . ..:
  • A. Description of the Deficiency The deficiency involves a condition on the Unit 1, Division I diesel generator where the failure of a fuel oil line immediately adjacent to a male branch tee caused a fire in the Division I
diesel generator area. During the investigation following the fire it was discovered that a required support was missing from

~

the fuel oil line.

i . The failed line was forwarded by MP&L to Middle South Services,

. Inc. , (MSS) for metallurgical evaluation. The MSS metallurgical evaluation report indicated. that the f ael oil line failure was due I to high cycle fatigue caused by a combination of vibration from

-the turbocharger and the absence of the required support on the

. fuel oil-line.

.B. - Analysis of Safety Implications The lack of the proper support on the low pressure fuel line could result in failure of the line. Since fuel is supplied via this line ~ to the engine, a failure of the line would cause the engine to be inoperable. The support was absent on both the Unit 1, Division I and II diesel generators, thus failures of the lines .

could result in both diesel generators' inability to perform their design functions in the' event- of an LOCA.

n

. =

4

.g Attachment to AECM-83/0822 Page 2 of 3 i

f

5. The :date on which the information of such deficiency ... was obtained.

Mississic.pi Power and Light received information of .the deficiency on September 6, 1983. We reported ' the ' deficiency to Mr. D. Verelli, of

.your of fice, as being reportable under.the provisions of 10CFR21 for

-Unit '1' on December 30,'1983.- Ihe MP&L "Res pons ible' Of ficer," Mr. -J. P.

McGaughy, Jr. , will be . n'otified of the 'reportability requirements of 3

' this deficiency when he returns to his office.  ;

-6. In the ' case of the basic component ;. . . the number- and location of all' such components.

There are .two -(2) diesel generators on e'ach Unit ' at' Grand Gulf for a 1 ~ total of four (4). Other locatiocs of defective components were listed by Transamerica Delaval' in their notification letter to the NRC'of

~

j

Sept embe r 21, 1983. . We do not have knowledge of the location of other

[.

' defective equipment.

The corrective action which' has been taken . .. the name of the

~

, 7.'

individual ... responsible. for the action; and the length of time that has been . . . taken to' complete the action.

\

Corrective Actions Taken A.

1. . The missing fuel oil'line support has been installed on the
3. Division I diesel generator.
2. Design Change Package 83/4096 for installing the fuel oil line support on' the Division II diesel generator has been issued for construction.
3. The reportability of this deficiency for Unit 2 has not been

, determined at this time. However, our Architect / Engineer has issued QAR F-432 to track the concern for Unit 2.

B.. Responsible Individual Unit l' Unit 2 J. E. Cross T. H. Cloninger Plant Manager Unit 2 Project Manager Mississippi Power & Light Co. Mississippi Power & Light Co.

C. ' Length of Time to Complete Actions

1. Corrective action for the ' Unit 1, Division I diesel generator is complete.

4

2. Corrective actions on the Unit 1, Division II diesel 1

generatur are scheduled to be complete by January 30, 1984.

e Attachment to AECM-83/0822 Page 3 of 3 3.. Date of cospletion for corrective actions for Unit 2 is not known at.this time.

8. Any advice related to the deficiency ... that has been, is being, or will be given to purchasers or licensees:

As the deficiency did not originate with MP&L, we have no advice to offer.

!