Revises Commitment Made in LER 96-001-00 Re Repair/Rework of CWS Condenser Water Box Air Release Valves.New Committed Date for Refurbishment of Valves Will Be 980430
ML20216J127
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/12/1997
From: Warren C
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
WO-97-0090, WO-97-90, NUDOCS 9709170167
Download: ML20216J127 (1)


LER-2096-001, Revises Commitment Made in LER 96-001-00 Re Repair/Rework of CWS Condenser Water Box Air Release Valves.New Committed Date for Refurbishment of Valves Will Be 980430
Event date:
Report date:
4822096001R00 - NRC Website

text

i i

WfSLF CREEK NUCLEAR OPERATING CORPORATION Clay C. Warren Chief Ooerstmg Officer September 12, 1997 WO 97-0090 U. S. Nuclear Regulatory Commission ATTN Document Control Desk Mail Station P1-137 Washington, D. C. 20555

Reference:

Letter WO 97-0072, dated August 5, 1997; from Clay C. Warren; WCNOC, to NRC

Subject:

Docket No. 50-482: Revision to Commitment made in Licensee Event Report 96-001-01 Gentlemen:

WCNOC is revising a commitment made in LER 96-001-01 regarding the repair or rework of Circulating Water System condenser water box air release valves.

WCNOC stated in the Reference that these valves would be repaired or replaced by November 1, 1997. Based on the timeline for refurbishment of the valves by the vendor, the November 1, 1997, date is not attainable. The new committed date is April 30, 1998.

Currently, eleven valves have been replaced and twelve valves remain scheduled to be repaired or replaced. Having some of these air release valves isolated is acceptable because the three air release valves on the Circulating Water System warming line have been inspected and reworked as necessary and will be tested and monitored when the warming line is placed in service. Operation last winter with twenty waterbox air release valves isolated and the three warming line air release valves functional, demonstrated that the lineup we anticipate this winter will not impact circulating water warming line flow.

If you should have any questions regarding this submittal, please cantact me at (316) 364-8831 extension 4000, or Mr. Richard D. Flannigan at extension 4500.

Very truly yours, g4 9709170167 970912 PDR ADOCK 05000482 ji S ~

PDR Clay C. Warren ,,

CCW/jad cci W. D. Johnson (NRC)

E. W. Merschoff (NRC) i i J. F. Ringwald (NRC) e i ,i .

J. C. Stone (NRC)

PO. Box 411 i Burhngton, KS 66839 / Phone: (316) 364 6831 An Equal Opportunny Employer M F HCNET