05000387/LER-1983-029, Forwards LER 83-029/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 83-029/03L-0
ML20072E503
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 03/14/1983
From: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20072E506 List:
References
PLA-1573, NUDOCS 8303210692
Download: ML20072E503 (1)


LER-2083-029, Forwards LER 83-029/03L-0
Event date:
Report date:
3872083029R00 - NRC Website

text

__, .

PPat Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101 = 215/7705151 March 14, 1983 Mr. R.C. Haynes Director, Region.I U.S. Nuclear Regulatory Commission 631 Park Avenue
King of Prussia,- PA 19406

$USQUEHANNA STEAM ELECTRIC STATION LICENSEE EVENT REPORT 83-029/03L-0 ER 100450 FILE 841-23 Docket No. 50-387 PLA- 1573 License No. NPF-14

Dear Mr. Haynes:

l Attachcd please find a copy of Licensee Event Report No. 83-029/03L-0.

This event was determined to be reportable per Technical Specification 6.9.1.9.a. in that during the course of surveillance testing, one of the

, four Drywell Pressure switches for the Automatic Depressurization System l was found to have a trip setpoint less conservative than the allowable

, value per Technical Specifications.

l l

l H.W. Keiser Superintendent of Plant-Susquehanna JTT/cg cc Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555 G.G. Rhoads Resident Inspector

[ U.S. Nuclear Regulatory Commission

( P.O. Box 52 p' Shickshinny, PA 18655 7 8303210692 830314 h i 1

PDR ADOCK 05000387 iS PDR k