05000334/LER-1982-052, Forwards LER 82-052/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-052/03L-0
ML20070D478
Person / Time
Site: Beaver Valley
Issue date: 12/02/1982
From: Lacey W
DUQUESNE LIGHT CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20070D482 List:
References
ND1SS1:690, NUDOCS 8212150075
Download: ML20070D478 (2)


LER-2082-052, Forwards LER 82-052/03L-0
Event date:
Report date:
3342082052R00 - NRC Website

text

$ ,

e h

348 Telephone (412) 4564000 Nuclear Division P.o. Box 4 Shippingport, PA 15077 @ 4 December 2, 1982 NDISS1:690 Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 LER 82-052/03L Mr. R. C. Haynes, Regional Administrator United States Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear fir. Haynes:

In accordance with Appendix A, Beaver Valley Technical Specifications, the following Licensee Event Report is submitted:

LER 82-052/03L, Technical Specification, 3.7.14.4, Fire Hose Stations.

Very truly yours, gpf d

m. S/ . lacey Superintende Attichment LV B212150075 821202 (&

PDR ADOCK 0b000334 /

S PDR

e Mr. R. C. Haynes December 2, 1982 NDISSI:690 Page 2 cc: Director Of Management & Program Analysis United States Nuclear Regulatory Commission Washington, D. C. 20555 J. Hultz, Ohio Edison Director, Of fice of Inspection and Enforcement Headquarters United States Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Peter Tam, BVPS Licensing Project Manager United States Nuclear Regulatory Commission Washington, D. C. 20555 W. M. Troskoski, Nuclear Regulatory Commission, BVPS Site Inspector Mr. Alex Timme, CAPCO Nuclear Projects Coordinator, Toledo Edison INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, CA 30339 G. E. Muckle, Factory Mutual Engineering, Pittsburgh Arthur Alford, Stone & Webster /Bosten i

l i

l l

r t

l l

l