Provides Results of Util Evaluation of Licensed Operator Requalification Exam Conducted During Wks of 900709 & 16. Crew That Failed to Meet Expected Performance Level Has Been Successfully Upgraded & re-evaluated to Be Satisfactory
ML20059E763
Person / Time
Site: Beaver Valley
Issue date: 08/01/1990
From: Sieber J
DUQUESNE LIGHT CO.
To: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20059E755 List:
References
NG1VPN:6302, NUDOCS 9009100308
Download: ML20059E763 (19)


Text

=

y es' Wm.

ATTACHMENT 2:

L.

d' h} '0 ;, -

i Telephone (412) 303-6000

  1. i Nuclear Group

P.O. Box 4

(~

Shippingport, PA 16077 0004 August'1, 1990 ss NGlVPN:. 6302

Mr.. Robe rt M. - Gallo, Chief

-Operations Branch Division of Reactor Safety

[

U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 L

Reference:

Beaver Valley Power Station,-Unit 1 Docket No. 50-334, Licensed DPR-66 Licensed Operator Requalification Examination Report 0

Dear Mr. Gallo:

The purpose of this letter is to provide the results of Duquesne' l

i Light Company's evi.luation of the Licensed Operator Requalification Examination conducted at Unit I the weeks of July 9 and July 16, 1990.

A summary of the examination results is provided along with individual results for each operator examined. These examination results indicate that the Beaver Valley Licensed Operator'Requalification Program is t

satisfactory overall and that;some operator retraining is needed in a-defined areas.

We have taken necessary corrective-actions based on the examination

-results.

The crew that failed to meet their expected performance icvel has been successfully upgraded and re-evaluated t.o be satisfactory.

In addition', a list of areas needing general training erephasis is attached, and is being used to enhance the operator retraining program.

j In'our view,- the revised examination process continues to work well. The NRC Examination Team interacted effectively with Beaver Valley personnel to administer the examination.

9009100308 900824 PDR ADOCK 05000334 3

PDC V

i

n i

3. o;.

p i

Robert. M. - Callo '

' August 1, 1990 NGlVPN:

6302 Page'2

~$

If thern are any questions regarding our evaluation of the examination or' our corrective actions,- please contact Mr. T. W. Burns, Director-operations Training at. (412) 393-5751, or Mr. D. E. Spocrry.

Nuclear Training Manager at (412) 393-5710.

Very truly yours,

-g D. Sieber vice President, Nuclear JDS/TWB/pgs l>

Enclosure cc:

T. P. Noonan L.'R. Freeland D. E. Spoerry T. W._ Burns Central File.(2)

\\

s 2

--4

- Jy; '

[

f BEAVER VALLEY UNIT 1

~REQUALIFICATION' EXAM JULY 9 - JULY.19, 1990

. r:

The following areas, although not necessarily generic weaknesses, were identified.as needing additional training emphases in the Licensed Operator Retraining Program.

WRITTEN EXAM Determining proper transition to make at-ECA-3.1 Step 19 when neither sub-cooling or' pressurizer level criteria are met.

D*

Input to OPDT setpoint calculation (Tavg vs DT).

jr Effect of Media select Tavg design change on Pressurizer Level Control-System.

Accuracy of Power Defect Curve when Tavg is not on program.

PLANT WALK-THROUGH EXAM Effect of a Turbine Trip on the air supply to the. Extraction Steam Non-return valves.

g SIMULATOR EXAM V

None (with exception of ur. satisfactory crew).

i I

I I

l e

s n

l l

+

-BEAVER VALLEY UNIT l' REQUALIFICATION EXAM JULY 9 - 19, 1990 i

.LAaMINATION

SUMMARY

I Results Facility Evaluators SIMULATOR:

7/12/90 2 Crews passed K. L. Ostrowski 8. Individuals passed Manager Operations Assessment

'7/18/90 1 Crew passed T. E. Kuhar-1 Crew failed Licensed Operations 8 Individuals passed Training Supervisor PLANT WALK-THROUC51 1

7/10 - 7/11/90' 8 Individuals passed T. E. Kr.har l

Licensed Operator 7/16 - 7/17/90 8 Individuals passed Training Supervisor j

R. J. Brooks L

Senior Nuclear l

Operations Instructor T. Gillot Senior Nuclear Operations Instructor l

A. W. Beckert I

Senior Nuclear-Operations Instructor J. p. Oliver Simulator Instructor WRITTEN 7/13/90 8 Individuals passed T. E. Kuhar Licensed Operator 7/19/90 8 Individuals passed Training Supervisor J. P. Oliver Simulator Instructor A. W. Ilartner Nuclear Shif t Supervisor R. J. Brooks Senior Nuclear Operations Instructor OVERALL:

16 Individuals passed 1 Crew failed

g 1

i ; ;f,

.I 9

BEAVER VALLEY UNIT 11

+

REQUALIFICATION EXAM JULY'9 - July.19, 1990-

- NAME' A.

J

- SINULATOR: PASS t

Pl. ANT WALK-THROUGH:

5/5 JPMS SATISFACTORY 9/10 QUESTIONS SATISFt.CTORY t

. WRITTEN - Section A 16.75/25.1 Section B 29.3/29.3 84.7%

OVERALL:

PASS l

l L

o L

l m-.

l..

m---

i e

+ ;-ne BEAVER VALLEY UNIT 1 REQUALIFICATION EXAM' l

i JULY 9_- 19, 1990

-3, NAMES-B=

~l

_c SIMULATOR:

PASS 5

PLANT WALK-THROUCili-5/5 JPMS SATISFACTORY 10/10 QUESTIONS SATISFACTORY ER1TTEN: Section A 22.1/25.1-

-i Section-B-29.3/29.3 94.5%

[

i 1

OVERALL:

PASS l

l l-l s

1 r

l:

i j

.-j M t.

4 BEAVER VALLEY. UNIT 1 stEQUALIFICATION EXAM 1

JULY 9 - 19, 1990

,1 NAME:

C SIMULATOR:

PASS-PLANT WALK-TliROUGil:

5/5 JPMS SATISFACTORY 10/10. QUESTIONS SATISFACTORY WRITTEN:

Section A 17.57/25.1 Section B 28.6/30.8 82.6%

r OVERALL:

PASS i

k

'l l

l I

i 1


-- -a-n

.;3

4-

'. i-BEAVER VALLEY UNIT 1 REQUALIFICATION EXAM JULY 9 ~ - 19, ' 1990 ;

k i

NAME:

D

~

-i SIMULATOR:

PASS

?

b

+

1 PLANT WALK-TIIROUGil:

4/5 JPMS SATISFACTORY 9/10 QUESTIONS SATISFACTORY l

i

' WRITTEN:

Section A 21.68/25.1 J

Section B 27.55/30.8 l

88.1%

+-

l f

i OVERALL: PASS

.t t.

l t

l l?

4 l^

i 4

6


.+

w

1-i BEAVER VALLEY UNIT 1 REQUALIFICATION EXAM JULY 9-19, 1990 NAME:

E SIMULATOR:

PASS PLANT WALK-TilROUCll:

5/5 JPMS SATISFACTORY I

10/10 QUESTIONS SATISFACTORY i

e WRITTEN:

Section A 23.7/25.1 Section B 29.3/29.3 97.4%

6 OVERALL:

PASS k

i w

-n 7 -

1 BEAVER VALLEY UNIT 1 REQUALIFICATION EXAM JULY 9 - 19, 1990 NAME:

F SIMULATOR:

PASS PLANT WAl,K-TilROUCil:

5/5 JPMS SATISFACTORY 10/10 QUESTIONS SATISFACTORY WRITTEN:

Section A 20.17/25.1 Sect. ion B E 65/29.3 87.9%

OVERAll, PASS i

l g

I i

l

+

BEAVER VALLEY UNIT 1 REQUALIFICATION EXAM 7

t JULY 9 - 19, 1990 NAME:

11

{

i SIMULATOR:

PASS t

f PLANT WALK-TilROUGil:

5/5 JPMS SATISFACTORY 10/10 QUESTIONS SATISFACTORY WRITTEN:

Section A 24.5/25.1 Section B 29.7/30.8 97.0%

OVERALL:

PASS I

6 I

I 1

l l

l

[

BEAVER VA1AEY UNIT 1 REQUALIFICA? ION EXAM JULY 9 - 1Y, 1990 I,

NAME:

G SIMULATOR:

PASS PLANT WALK-THROUGils

$/$

JPMS SATISFACTORY 9/10 QUESTIONS SATISFACTORY WRITTEN:

Section A 22.0/25.1 Section B 30.8/30.8 94.57.

OVERALL:

PASS i

l l

1 l'

l l-l l

l' I

r BEAVER VALLEY UNIT 1 i

REQUALIFICATION EXAM JULY 9 - 19, 1990 l

NAME:

1 i

SINULATOR:

PASS / CREW FAILED PIANT WALK-THROUGH:

$/5 JPMS SATISFACTORY 9/10 QUESTIONS SATISFACTORY WRITTEN:

Section A 28.1/32.1 Section B 25.7/27.6 90.1%

OVERALL:

PASS r

n l

l l

i

-e

o BEAVER VALLEY UNIT 1 REQUALIFICATION EXAM JULY 9 - 19. 1990 NAME:

J l

SINULATOR:

PASS / CREW FAILED PLANT WALK-THROUGH:

4/5 JPMS SATISFACTORY, 9/10 QUESTIONS SATISFACTORY WRITTEN:

Section A 30.6/32.1 Section B 27.6/27.6 97.5%

OVERALL:

PASS i

i l

-1 i

e BEAVER VALLEY UNIT 1 REQUALIFICATION EXAM JULY 9 - 19, 1990 i

NAME:

K SIMULATOR:

LASS / CREW FAILED Pt. ANT WALK-THROUGH:

5/5 JPMS SATISFACTORY t

10/10 QUESTIONS SATISFACTORY WRITTEN:

Section A 32.0/32.6 Section B 28.5/30.4 96.0%

I

?

OVERALL:

PASS k

e

3

.c BEAVER VALLEY UNIT 1 REQUALIFICATION EXAM JULY 9 - 19, 1990 t

NAME:

L l

LIMULATOR:

PASS / CREW FAILED PLANT WALK-TilROUGil 4/$

JPMS SATISFACTORY 9/10 QUESTIONS SATISFACTORY WRITTEN:

Section A 28.98/32.1 Section B 25.7/27.6 91.67.

I

?

OVERALL:

PASS l

i

[ '.'

c i

BEAVER VALLEY UNIT 1 REQUALIFICATION EXAM JULY 9 - 19, 1990 NAME:

M i

SIMULATOR:

PASS t

PLANT WALK-THROUGH:

5/5 JPMS SATISFACTORY 10/10 QUESTIONS SATISFACTORY WRITTEN:

Section A 30.6/32.1 Section B 24.5/27.6 92.3%

OVERALL:

PASS 1

i I

l 4

i

.J BEAVER VALLEY UNIT 1 l

REQUALIFICATION EXAN JULY 9 - 19, 1990

)

I NAME:

N l

I SINULATOR:

PASS-9 PLANT WALK-THROUVA:

5/5 JrHS SATISPACTOR't 9/10 QUESTIONS SATISFACTORY WRITTEN:

Section A 30.1/32.1

-Section B 26.85/27.6 95.4%-

OVERALL:

PASS s

~

BEAVER VALLEY UNIT 1 REQUALIFICATION EKAM JULY 9 - 19, 1990 NAME:

0 SINULATOR:

PASS PLANT WALK-TilROUGil:

5/5 JPMS SATISFACTORY 10/10 QUESTIONS SATISFACTORY WRITTEN:

Section A 32.0/32.6 Section B 28.5/30.4 96.0%

DVERALL:

PASS l

l l-1

]