Text
.
._m__.
I I
..fe Whey Power Staten Shwngport, PA 15077A)04 3
1 t
COU1o.,%
m2, m sas 1
August 14, 1990
-U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington,.DC 20555
Reference:
- Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Response to R.
G.
1.97 Gentlemen:-
This-letter provides information on the acceptability of rescheduling our response to Item 4b, Neutron Flux Monitoring
'l 4
-Instrumentation, of the Regulatory Guide 1.97 Safety Evaluation Report (SER) for the-Beaver Valley. Power Station (BVPS-1). 'The response; was to.,be submitted by. August '15, 1990~ predicated on a prior meeting with' the -NRC Staff.
As indicated in our previous.
1
. response to the SER, we have pursued resolution of the issue with j
other. utilities which will-.also ba represented at the meeting.
During.telecon discussions on August 3 and-6, 1990 between i
Mr.
-A.
W.
- DeAgazio, NRC Senior Project Manager,.and Mr.
E.
D..
- Coholich, Duquesne Light company (DLCo),. it - was determined that a -
.i meeting prior to August:15 between the NRC Staff and the Utility Group Representatives could :not be arranged ~because.of personnel schedules.
.However, Mr.
DeAgazio determined that it would be
- acceptable; to delay the-DLC response until after1the meeting..
The'.
-nearest _ possible future date. for the-meeting will be arranged -
presently targeted,for mid-September.
The rescheduling of the DLCo response will be determined.on or shortly,after the meeting.
. 'Please contact-my-. office if there are any questions-regarding this' submittal.
Very truly yours, A'2/
J.
D. Sieber Vice. President O
Nuclear Group
.cc:
Mr. J.
Beall, Sr. Resi' dent. Inspector Mr. T. T. Martin, NRC Region I Administrator
'Mr. A. W. DeAgazio, Project Manager Mr. R.
Saunders (VEPCO) 00029
/9 9009200058 900814 j
PDR ADOCK 05000334 e
p PDC i
l s.