Submits Final Response to GL 96-01, Testing of Safety- Related Logic Circuits
ML20136F690
Person / Time
Site: Pilgrim
Issue date: 03/07/1997
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-2.97.028, GL-96-01, GL-96-1, NUDOCS 9703170024
Download: ML20136F690 (2)


Text

. __= m . . . ._. _ ..

l

- *o Boston Edison i Pdgnrn Nuclear Power Station l Rocky Hill Road  ;

Plymouth, Massachusetts 02360 I E. T. Boulette, PhD March 7, 1997 Senior vice President - Nuclear BECo Ltr. No. 2.97.028 l U.S. Nuclear Regulatory Commission i

Attention: Document Control Desk '

Washington, DC 20555

, j Docket No. 50-293 License No. DPR-35 l I

l

, Generic Letter 96 Testina of Safetv-Related Loaic Circuits Final Response 1

On April 19,1996, Boston Edison responded to Generic Letter 96-01 in which we committed to notifying you when actions associated with the generic letter were complete. We have completed a review of the core spray and automatic depressurization systems. The logic system functional test l

(LSFT) procedures were found acceptable to test logic circuits to ensure they function as designed. l l

Based on the review of these two systems, we conclude that past and present activities at Pilgrim I comply with NRC requirements and address the concerns of GL 96-01.

~

We discovered an error in the April 19,1996, letter we would like to correct. In the attachment l under " Background" information, we stated the LSFT database is controlled in accordance with

, Station Instruction SI-TC.3.2.13. That instruction has been retired and the database is now '

controlled in accordance with procedure 1.8, " Master Surveillance Tracking Program." We regret any inconvenience this error may have caused.

. M- - -l E. T. Bou ette, PhD ETB/MTidasf/gl96-01a 9703170024 970307 PDR ADOCK 05000293 V

P PDR '

h J t u v .x A .

5.EEEN.E55.0 (()

_ _ . _ _ . _ . _ - _ _ . . _ . . _ . _ _ _ _ . . . . _ . . . _ . . . ~ _ . - _ _ _. _ _ , . _ _ _ _ -. _

I

<- j O.S. Nuclear Regulatory Commission Page 2 j cc: Mr. Alan B. Wang, Project Manager

Project Directorate 1-1 Office of Nuclear Reactor Regulation l Mail Stop 14B2 1 y U. S. Nuclear Regulatory Commission l i 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission Region i I 3 475 Allendale Road I

! King of Prussia, PA 19406 j Senior NRC Resident inspector

Pilgrim Nuclear Power Station i

1 a

.