MONTHYEARML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML20217F8011999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of McGuire Nuclear Station.Areas That Warranted More than Core Insp Program Over Next Five Months,Not Identified.Historical Listing of Plant Issues Encl ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 ML20217C4471999-10-0404 October 1999 Forwards Insp Repts 50-369/99-06 & 50-370/99-06 on 990801- 0911.Determined That One Violation Occurred & Being Treated as Non-Cited Violation ML20212J2191999-10-0404 October 1999 Informs That Util 980326 Response to GL 97-06, Degradation of SG Internals Provides Reasonable Assurance That Condition of Steam Generator Internals Are in Compliance with Current Licensing Bases for Facility ML20212J7801999-10-0404 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for McGuire NPP & 990615.Informs That NRC Reviewed Responses & Concluded That All Requested Info Re Y2K Readiness Provided.Subj GL Considers to Be Closed ML20212M1651999-09-23023 September 1999 Refers to 990917 Meeting at Region II Office Re Licensee Presentation of self-assessment of McGuire Nuclear Station Performance.List of Attendees & Licensee Presentation Handouts,Encl ML20212D1671999-09-20020 September 1999 Forwards Exemption & SER from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Re Isolation of Main Steam Branch Lines Penetrating Containment.Exemption Related to Licensee Application ML20212B6491999-09-15015 September 1999 Informs That Encl Announcement Re 990913 Application for Amend to Licenses NPF-9 & NPF-7 Forwarded to C Observer in North Carolina,For Publication ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212A0501999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementing Code Case for Duration of Insp Interval ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211J3671999-08-31031 August 1999 Forwards Public Notice of Application for Amend to License NPF-9 Seeking one-time Extension of Surveillance Frequency for TS SR 3.1.4.2 Beyond 25% Extension Allowed by TS SR 3.0.2 ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211K8831999-08-26026 August 1999 Forwards Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs ML20211G5181999-08-24024 August 1999 Forwards SE Re second-10-yr Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0171999-08-13013 August 1999 Confirms Conversation Between M Cash & M Franovich on 990806 Re Mgt Meeting,Scheduled for 990917 to Present self- Assessment of Plant Performance.Meeting Will Be Held in Atlanta,Ga ML20210S2231999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210T4511999-08-10010 August 1999 Forwards Response to NRC RAI Re 981014 Standby Nuclear Svc Water Pond Dam Audit Conducted by FERC ML20210R4311999-08-10010 August 1999 Forwards Summary Rept of Mods,Minor Mods,Procedure Changes & Other Misc Changes Per 10CFR0.59 ML20210R0031999-08-10010 August 1999 Forwards Revised TS Bases Pages to NRC for Info & Use. Editorial Changes Were Made to Correct Incorrect UFSAR Ref Number Associated with Certain Reactor Coolant Sys Pressure Isolation Valves ML20210Q3701999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date in Order to Register Individuals to Take Exam ML20210H7691999-07-21021 July 1999 Submits Summary of 990715 Meeting at Facility Re Presentation of Results of Most Recent Periodic Ppr.List of Meeting Attendees Encl ML20209H1551999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for May 1999 Also Encl ML20210E1931999-07-13013 July 1999 Forwards Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20209G5151999-07-0808 July 1999 Forwards Amended Pages to Annual Radioactive Effluent Release Repts, for 1997 & 1998 for McGuire Nuclear Station. Portion of Rept Was Inadvertently Omitted Due to Administrative Error,Which Has Been Corrected ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20196J4381999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid Version 2 ML20196G3721999-06-24024 June 1999 Documents Verbal Info Provided to NRR During Conference Call Re Relief Requests 98-002 & 98-003 ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20195K3601999-06-14014 June 1999 Forwards MORs for May 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised MORs for Apr 1999.Line 6 Max Dependable Capacity (Gross Mwe) on Operating Data Rept Should Be Revised to 1114 from Jan 1998 to Apr 1999 ML20195D5691999-06-0303 June 1999 Submits Ltr to Facilitate Closing of Inspector Follow Up Item 50-369,370/97-15-05,re Revising Site Drawings in UFSAR Into Summary one-line Flow Diagrams,Per NRC 990327 Telcon ML20195F1851999-06-0202 June 1999 Forwards Insp Repts 50-369/99-03 & 50-370/99-03 on 990328- 0508.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20195E8771999-06-0202 June 1999 Confirms Telcon with M Cash on 990524 Re Public Meeting for 990715.Purpose of Meeting to Discuss Results of NRC Most Recent PPR ML20207D0521999-05-21021 May 1999 Informs That in Telcon on 990519 Between a Orton & Rf Aiello Arrangements Made for Administration of Initial Written Exam for McGuire Nuclear Station on 990603.Exam Will Be Administered at Catawba Simultaneously with Written Exam ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld ML20206T4481999-05-13013 May 1999 Forwards Rev 3 to Topical Rept DPC-NE-3002-A, UFSAR Chapter 15 Sys Transient Analysis Methodology, IAW Guidance Contained in NUREG-0390 ML20206R0791999-05-13013 May 1999 Forwards Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised Monthly Operating Repts for Mar 1999 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210S2231999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210T4511999-08-10010 August 1999 Forwards Response to NRC RAI Re 981014 Standby Nuclear Svc Water Pond Dam Audit Conducted by FERC ML20210R0031999-08-10010 August 1999 Forwards Revised TS Bases Pages to NRC for Info & Use. Editorial Changes Were Made to Correct Incorrect UFSAR Ref Number Associated with Certain Reactor Coolant Sys Pressure Isolation Valves ML20210R4311999-08-10010 August 1999 Forwards Summary Rept of Mods,Minor Mods,Procedure Changes & Other Misc Changes Per 10CFR0.59 ML20209H1551999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for May 1999 Also Encl ML20209G5151999-07-0808 July 1999 Forwards Amended Pages to Annual Radioactive Effluent Release Repts, for 1997 & 1998 for McGuire Nuclear Station. Portion of Rept Was Inadvertently Omitted Due to Administrative Error,Which Has Been Corrected ML20196G3721999-06-24024 June 1999 Documents Verbal Info Provided to NRR During Conference Call Re Relief Requests 98-002 & 98-003 ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20195K3601999-06-14014 June 1999 Forwards MORs for May 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised MORs for Apr 1999.Line 6 Max Dependable Capacity (Gross Mwe) on Operating Data Rept Should Be Revised to 1114 from Jan 1998 to Apr 1999 ML20195D5691999-06-0303 June 1999 Submits Ltr to Facilitate Closing of Inspector Follow Up Item 50-369,370/97-15-05,re Revising Site Drawings in UFSAR Into Summary one-line Flow Diagrams,Per NRC 990327 Telcon ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld ML20206R0791999-05-13013 May 1999 Forwards Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised Monthly Operating Repts for Mar 1999 ML20206T4481999-05-13013 May 1999 Forwards Rev 3 to Topical Rept DPC-NE-3002-A, UFSAR Chapter 15 Sys Transient Analysis Methodology, IAW Guidance Contained in NUREG-0390 ML20206S9151999-05-11011 May 1999 Forwards Rev 29 to McGuire Nuclear Station Selected Licensee Commitments. Section 16.11-16.2 Has Been Revised to Apply Guidance of NUREG-0133 for Performing Gaseous Effluent Dose Pathway Calculations ML20206K1341999-05-0303 May 1999 Forwards 1999 Interim UFSAR for McGuire Nuclear Station. UFSAR Update Includes Items Relocated During Improved Tech Specs Implementation.Next Regular UFSAR Update as Required 10CFR50.71(e) Is Due in Oct 1999 ML20206F3321999-04-28028 April 1999 Forwards Annual Radioactive Effluent Release Rept for 1998 for McGuire Nuclear Station. Listed Attachments Are Contents of Rept.Revised ODCM Was Submitted to NRC on 990203 ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20206B4791999-04-20020 April 1999 Requests Exemption from GDC 57 Re Reactor Containment - Closed Sys Isolation Valves,As Described in 10CFR,App a for Containment Penetrations M393 & M261.Detailed Technical Evaluation & Justification for Exemption Request,Encl ML20205S9731999-04-19019 April 1999 Submits Info Re Quantity of SG Tubes Inspected,Tube Indications of Imperfections & Tubes Removed from Svc by Plugging,Per TS 5.6.8,part B 05000369/LER-1999-001, Forwards LER 99-01(S)-00 Re Contract Employee Submittal of False Info Resulting in Gaining Unescorted Access.No Licensee Planned Corrective Actions or Other Regulatory Commitments Were Identified as Result of Incidence1999-04-16016 April 1999 Forwards LER 99-01(S)-00 Re Contract Employee Submittal of False Info Resulting in Gaining Unescorted Access.No Licensee Planned Corrective Actions or Other Regulatory Commitments Were Identified as Result of Incidence ML20205P8891999-04-13013 April 1999 Forwards Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for Feb 1999 Encl ML20206K3561999-04-13013 April 1999 Forwards Revised McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual. Significant Changes Are Marked by Vertical Bars on Right Margin ML20205K5131999-04-0707 April 1999 Forwards Complete Response to NRC 981209 & 990105 RAIs on Question 11 Re LARs for McGuire & Catawba Nuclear Stations. Addl Info Received from W & Contained in Encl W ML20205B6011999-03-23023 March 1999 Requests That NRC Place Technical Interface Agreement 97-02 Re URI 96-11-03,raising Operability & Design Criteria Conformance Issues Re Hydraulic Snubbers Installed at Plant & NRR Response on Dockets to Provide Record of Issue ML20205C4611999-03-23023 March 1999 Submits Correction to Violation Against 10CFR50 App B, Criterion VII, Control of Purchased Matl,Equipment & Svcs, Issued to McGuire Nuclear Station on 980807 ML20205B6161999-03-23023 March 1999 Provides Addl Info & Correction to Typo in Re License Bases Record Change Re License Amend Submittals ,approved as FOL NPF-9 & NPF-17,amends 184 & 166, respectively.Marked-up TS Pages,Encl ML20204J0051999-03-19019 March 1999 Forwards Response to 990127 & 28 RAIs Re GL 96-05 for Catawba & McGuire Nuclear Stations ML20204E1791999-03-18018 March 1999 Reflects 990318 Telcon Re License Bases Record Change for License Amend Submittals ,approved as Amends 184 & 166,respectively for Licenses NPF-9 & NPF-17.TS Pages Encl ML20204C8821999-03-15015 March 1999 Forwards Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for Jan 1999 Encl ML20207C2071999-02-25025 February 1999 Informs of Revised Expected Submittal Date of Proposed License Amend Presented at 990127 Meeting Re Soluble Boron & Boraflex.Util Plans to Submit Proposed License Amend in First Quarter of 1999 ML20207C7691999-02-22022 February 1999 Forwards Annual Occupational Radiation Exposure Rept for 1998. Rept Provides Tabulation of Number of Station,Utility & Other Personnel Receiving Exposure Greater than 100mRem/yr Followed by Total Dose for Each Respective Worker ML20207C6851999-02-22022 February 1999 Forwards Revised TS Bases Pages,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4 ML20206S3341999-01-28028 January 1999 Forwards Proprietary & non-proprietary Responses to NRC 981209 & 990105 RAIs Re Util Lars,Permitting Use of W Fuel at McGuire & Catawba Stations.Proprietary Info Withheld,Per 10CFR2.790 ML20199E0081999-01-12012 January 1999 Forwards MOR for Dec 1998 & Revised MOR for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199C9861999-01-0707 January 1999 Forwards Annual Lake Norman Environ Summary Rept for 1997,as Required by NPDES Permit NC0024392,including Detailed Results & Data Comparable to That of Previous Years.With Corrected Pages 3 & 19 to 1994-95 Lake Norman Creel Rept 1999-09-09
[Table view] |
Text
- -
11 1
' DukcibwerCompany T. C klctitim
- hicGuire Nuclear Generation Department Vice President 12700Hagers FerryRoad(AIG01W) (704)8754800 Huntersville, NC280784985 (704)8754809 Fax 7-~5 -
DUKEPOWER (v ~ )
May_13, 1996 U. S. Nuclear Regulatory Commission Attention: Documen*. Control Desk washington, D.C. 20555
SUBJECT:
Duke Power Company McGuire Nuclear Station - Unit 2 Docket No. 50-370 NRC Bulletin 96 Outage Test Data The purpose of this letter is to provice information on McGuire Unit 2 actions taken during the current refueling outage (2EOC10) in response to NRC Bulletin 96-01.
NRC Bulletin 96-01, dated March 8, 1996, requested holders of operating licenses for Westinghouse designed plants to take actions and supply 4 information to the NRC regarding recent control rod insertion problems. l The initial Duke Power response to this bulletin was provided by letter dated April 4, 1996 and supplemented with additional information by letter dated April 30, 1996.
Restated below are pertinent sections of NRC Bulletin 96-01 requiring actions during the current McGuire Unit 2 refueling outage:
Requested Action (3):
(3) Measure and evaluate at each outage of sufficient duration during calendar year 1996 (end of cycle, maintenance, etc.), the control rod drop times and rod recoil data for all control rods. If appropriate plant conditions exist where the vessel head is removed, measure and evaluate drag forces for all rodded fuel assemblies,
- a. Rods failing to meet the rod drop time in technical specifications shall be deened inoperable,
- b. Rods failing to bottom or exhibiting high drag forces shall require prompt corrective action in accordance with Appendix B to Part 50 of Title 10 of the Code of Federal Regulations (10 CFR Part 50).
Required Response Item (3):
(3) Within 30 days after completing Requested Action (3) for each outage, a report that summarizes the data and that documents the results obtained; this is also applicable to Requested Action (4)when any abnormal rod behavior is observed.
1 000GM ,
9605200096 960513 PDR ADOCK 05000370 G PDR (
1 U. S.' Nuclear Regulatory Commission.
Document' Control Desk '
Hay 13, 1996' .
I Page 2/3 McGuire Response to Item (3):
i Included as. Attachment 1 and 2 to this letter is a summary report of the l McGuire Unit 2 data for Requested Action (3) obtained during testing 1 performed in conjunction with the Unit 2 End-of-Cycle.10 refueling ,
outage. This testing was completed on April 12, 1996.
Further testing will.be performed _in'accordance with the requested information within the NRC Bulletin. i
.Please direct questions on this matter to James E. Snyder at
- (704) 875-4447. ;
Very truly yours, ;
I T. C. McHeekin i l
l 1' l
i 1
l
)
l l
l I
l' i
h s
l
-, , -, , . . , . -. _ - . .. . _ _ , - - . _ . ~ _ . - , . ~ . - , ,
l l
U. S. Nuclear Rrgulatory Commission Document Cont'.ol Desk May 13, 1996 Page 3/3 l
i
! Attachzrent 1 1
McGuire Unit 2 Control Rod Drive Line Performance Evaluation Analysis Attachment 2 McGuire Unit 2 RCCA Drag Test Before Fuel Unload cc: Mr. S D. Ebneter, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta St., NW, Suite 2900 Atlanta, GA 30323 l Mr. Victor Nerses U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555 i
Mr. George Maxwell NRC Resident Inspector McGuire Nuclear Station l
i i
l
c McGuire Nuclear Station
, NRC Bulletin 96-01 l
' Attachment 1 Unit 2 Control Rod Drive Line l Performance Evaluation Analysis l
- i on April 5, 1996 Control Rod Drop Timing was performed in accordance with requirements of NRC Bulletin 96-01. The following is a summary of the data analysis of the Control Rod Drive Line Performance Evaluation for McGuire Nuclear Station Unit 2.
During the Unit 2 EOC10(End of Cycle) outage, Rod Drop Testing was performed on the Drive Lines. This included a detailed analysis of Control Rod Drop Times (see attached data tables). .
McGuire Nuclear Station has trended control rod drop times from initial plant startup in 1983. The data has been consistent during all testing r on Unit 1 and 2.
The analysis method used consisted of a detailed review of each control rod's time based profile. Four rods, F-10, H-08,.H-10 and N-09, were flagged as having slightly longer drop times. All four of these control rods were still well within their required time. The profiles of eight rods were then superimposed on each other and compared. The mean '
profile was used to compare an additional seven rods. This process was repeated until all of the rods were analyzed. Again the same four -
control rods exhibited a slight variance in their profiles.
McGuire traces did not reveal any change at the top of the fuel !
assembly. However, four of the McGuire traces indicated a very slight j change at the center of the fuel assembly. Duke Power's analysis of [
industry data indicates that this is typical of the majority of rods !
throughout the industry that use Westinghouse fuel. This typical >
category is a deceleration prior to the Dashpot Region. ,
Duke Power has detailed information on the testing and analysis I methodology and is willing to share with the NRC upon request.
r 1
)
l i
i I
l l
I
! McGuire Nuclear Station NRC Bulletin 96-01 Attachment 2 Unit 2 EOC-10 RCCA Drag Test Before Fuel Unload April 18, 1996 The McGuire Unit 2 RCCA (Rod Cluster Control Assembly or control rod) drag test was conducted in conjunction with heavy drive rod >
unlatching. Drive rod unlatching takes place before the initial ,
removal of the upper internals. The Unit 2 control rod drag test before fuel unload was performed in response to McGuire L Evaluation of NRC Bulletin 96-01, Control Rod Insertion Problems The purpose of the drag test is to address an industry issue of some control rods not fully inserting into the dashpot region during a reactor scram. The dashpot is the lower l one and a half feet of a fuel assembly guide thimbles. A control rod is connected to a drive rod which is then lifted, lowered, or released by a CRDM (Control Rod Drive Mechanism). !
l The control rod drag test took place April 11- 12, 1996.
During a control rod drag test, the weight will gradually increase or decrease as the control rod is raised or lowered.
The reference weight of 923 pounds is the average load cell reading with the control rod raised six (6) inches and at rest.
Because of buoyancy effects, the gradual weight change during a normal drag test is from 923 pounds to 965 pounds after 10 feet of travel.
The control rod drag test arrangement consists.of a digital load cell attached to the manipulator crane auxiliary hoist. The l load cell is attached to the. lifting bail of the unlatching tool. The unlatching tool is then attached to each drive rod.
The recorded weights in Tables 1 and 2 are from visual observations of a digital load cell. Table 3 is a summary of the dashpot drag loads during withdrawal and insertion.
During control rod withdrawal drag tests, all control rods were within the Westinghouse F-Spec No. 7.1 tolerance of plus or minus 100 pounds (Table 1). The greatest weight delta of 71 I pounds occurred on core locations H-8 and N-9 followed by H-10 l l at 69 pounds and C-9 at 59 pounds. Three of these locations !
l correspond to those locations with the longest drop times noted j in Attachment #1. Both the rod drop times and the drag test data were within acceptable criteria.
l 1
i
. e
= .
4 McGuire Nuclear Station NRC 13ulletin 96-01 Attachment 2 Page 2/4 Table 1 - Maximum Dash Pot Withdrawal Weights During Control Rod Drag Test Reference weight: 923 pounds Control Maximum Control Maximum Control Maximum Rod Core Dashpot Rod Core Dashpot Rod Core Dashpot Location Weight Location Weight Location Weight Reading Reading Reading (Pounds) (Pounds) (Pounds)
B-4 932 F-8 962 K-14 930 B-6 922 F-10 974 L-3 944 B-8 930 F-14 944 L-13 932 B-10 930 G-3 966 M-2 936 B-12 960 G-13 962 M-4 934 C-5 942 H-2 938 M-8 940 C-7 944 H-4 960 M-12 935 C-9 982 H-6 958 M14 935 C-11 956 H-8 994 N-5 934 D-2 930 H-10 992 N-7 944 D-4 948 H-2 950 N-9 994 D-8 938 H-14 924 N-11 950 D-12 972 J-3 956 P-4 946 D-14 936 J-13 936 P-6 930 E-3 946 K-2 938 P-8 942 E-13 970 K-6 964 P-10 934 F-2 930 K-8 948 P-12 942 F-6 962 K-10 974 Average 948 Wt.
i I
l
. e McGuire Nuclear Station NRC Bulletin 96-01 Attachment 2 Page 3/4 Table 2 - Minimum Dash Pot Insertion Weight During Control Rod Drag Test Reference Weight: 923 pounds Control Minimum Control Minimum Control Minimum Rod Core Dashpot Rod Core Dashpot Rod Core Dashpot Location Weight Location Weight Location Weight Reading Reading Reading (Pounds) (Pounds) (Pounds)
B-4 900 F-8 874 K-14 900 B-6 904 F-10 858 L-3 886 B-8 902 F-14 882 L-13 900 B-10 894 G-3
- M-2 894 B-12 868 G-13 870 M-4 892 C-5 892 H-2 850 M-8 890 C-7 886 H-4 882 M-12 900 C-9 850 H-6 874 M14 886 C-11 874 H-8 844 N-5 898 D-2 900 H-10 842 N-7 894 D-4 888 H-12 842 N-9 840 D-8 896 H-14 884 N-11 884 D-12 864 J-3 890 P-4 898 D-14 896 J-13 896 P-6 898 ,
E-3 880 K-2 884 P-8 888 l E-13 862 K-6 886 P-10 888 I F-2 856 K-8 886 P-12 890 F-6 872 K-10 862 Average 880 Wt. i
- Invalid data was obtained for position G-3 due to a recording l error. Location G-3 showed no drop time anomaly.
l l
l l
McGuire Nuclear Station
Page 4/4 Table 3 - Withdrawal and Insertion rashpot Weight Differences from the Reference Weight I
Control Withdra Insertion Control lWithdra Insertion Control Withdra Insertion Rod Core wal Weight Rod Core ;;al Weight Rod Core wal Weight Location Weight Delta Location Weight Delta Location Weight Delta Delta (Pounds) Delta (Pounds) Delta (Pounds)
(Pounds (Pounds (Pounds
) ) )
B-4 9 23 P-8 39 49 K-14 7 23 B-6 0 19 F-10 51 65 L-3 21 37 B-8 7 21 F-14 21 41 L-13 9 23 B-10 7 25 G-3 43
- M-2 13 29 B-12 37 55 G-13 39 53 M-4 11 31 C-5 19 31 H-2 15 73 M-8 17 33 C-7 21 37 H-4 37 41 M-12 12 23 C-9 59 73 H-6 35 49 M14 12 37 C-11 33 49 H-8 71 79 N-5 11 25 D-2 7 23 H-10 69 81 N-7 21 29 D-4 25 35 H-12 27 81 N-9 71 83 D-8 15 27 H-14 1 39 N-ll 27 39 D-12 49 59 J-3 33 33 P-4 23 25 D-14 13 27 J-13 13 27 P-6 7 25 E-3 23 43 K-2 15 39 P-8 19 35 E-13 47 61 K-6 41 37 P-10 11 35 F-2 7 67 K-8 25 37 P-12 19 33 F-6 39 51 K-10 51 61
- Invalid data was obtained for position G-3 due to a recording error. Location G-3 showed no drop time anomaly.
- _ _ _ -