MONTHYEARML20205G8771999-03-26026 March 1999 Forwards Copy of Cover Page from Fort St-Vrain Welding Manual,Which Had Been Listed as Encl on Page 4 of 990325 Reply to EA 98-081.Cover Page Had Been Inadvertently Left Out with Original Reply ML20197H8811998-12-0101 December 1998 Forwards Proposed Change to Fsv ISFSI Physical Protection Plan in Which Commitment Is Made to Provide Feature to Security Posture for Facility ML20236R9191998-07-20020 July 1998 Ltr Contract:Mod 4 to Task Order 27, Task Area No 4 of Basic Contract - Fort St Vrain Insp Under Contract NRC-02-95-003 ML20199H8141997-11-21021 November 1997 Responds to Requesting Clarification as to Whether Increase in Tritium & Iron-55 Contamination Limits That Were Approved for Plant Apply to All Licensees ML20198K1931997-10-10010 October 1997 Provides Supplemental Info in Support of Util Proposed Rev to Physical Security Plan for Plant Plant Isfsi.Plan Withheld,Per 10CFR2.790(d) & 10CFR73.21 ML20198H5601997-09-16016 September 1997 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20141F3521997-05-14014 May 1997 Forwards Proposed Issue 4 of Physical Security Plan for Fort St Vrain ISFSI for Review & Approval.Encl Withheld,Per 10CFR2.790(d) ML20141C8611997-05-0909 May 1997 Informs of Approval of Fsv Final Survey Rept & Effluent Pathway Survey Plan & Supporting Analysis ML20141K9881997-05-0505 May 1997 Forwards Amend 89 to License DPR-34 & Supporting Safety Evaluation.Amend Designates All Elements of Approved Decommissioning Plan as License Termination Plan ML20138G2701997-04-28028 April 1997 Provides Response to NRC Comments Re Proposed Sampling & Survey Plan for Fsv Effluent Pathway.Response Documents Fsv Liquid Effluent Discharge Pathway Areas Are Acceptable for Release for Unrestricted Use IAW Draft NUREG/CR-5849 ML20148D4651997-04-24024 April 1997 Forwards Revised Interim Ltr Rept Which Describes Procedures & Results of Confirmatory Survey of Group E Effluent Discharge Pathway Areas at Fsv Station NUREG/CR-5849, Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-58491997-04-23023 April 1997 Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-5849 ML20138B0511997-04-22022 April 1997 Forwards Copy of Proposed Amend to Fsv NPDES Permit, Wastewater Discharge Permit CO-0001121 Requested to Support Repowering Activities,Iaw Section 3.2.d of Fsv Non-Radiological Ts,App B to License DPR-34 ML20140E1061997-04-10010 April 1997 Forwards Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20137S4481997-04-0808 April 1997 Informs That Decommissioning Activities at Fsv Are Complete & NRC Issued Exemption from Requirements of 10CFR50.54(w) in .Property Damage Insurance Policy Is Maintaned to Protect Fsv balance-of-plant Assets ML20137S0821997-04-0707 April 1997 Forwards Insp Rept 50-267/97-01 on 970310-11.No Violations Noted ML20137S1691997-04-0707 April 1997 Fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App K ML20137S5421997-04-0707 April 1997 Forwards Final Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Fort St Vrain Nuclear Station ML20148D5951997-04-0404 April 1997 Forwards Confirmatory Survey for Fsv Nuclear Station, Psc,Platteville,Co, Final Rept ML20137R6921997-04-0404 April 1997 Informs of Approval for Request for Addl 45 Days to Remedy Deficiencies Identified in NRC Re Financial Assurance Mechanism for Fsv Decommissioning Costs ML20137J8051997-03-31031 March 1997 Third Partial Response to FOIA Request for Documents.Records in App F Encl & Will Be Available in Pdr.App G & H Records Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20148D5811997-03-26026 March 1997 Forwards Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station, Covered in Final Survey Rept,Vol 6 ML20137G7361997-03-25025 March 1997 Requests Addl Time for Util to Respond to NRC Comments in Re Financial Assurance Mechanism for Fort St Vrain Decommissioning Costs ML20137G9521997-03-24024 March 1997 Forwards Quarterly 10CFR50.59 Rept for Period 961201-970228 Re Changes,Tests & Experiments for Fort St Vrain Decommissioning ML20137H1131997-03-24024 March 1997 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App D.Documents Also Available in Pdr.Documents Listed in App E Withheld in Part (Ref FOIA Exemption 6) ML20137C0181997-03-18018 March 1997 Documents That No Personnel Has Received Radiation Exposure at Fsv in 1997 or at Any Time Subsequent to ML20137C0061997-03-18018 March 1997 Documents That There Have Been No Activities Involving Release of Radioactive Matls from Fsv Nuclear Station That Potentially Could Have Affected Environ,Subsequent to Previous Radiological Envion Operating Rept ML20136G1201997-03-11011 March 1997 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1996 & Jan-Mar 1997. All Effluent Releases Completed as of 960703.Repts on Activities After 960703 Reflect Disposal of Solid Waste ML20136B1331997-02-28028 February 1997 First Partial Response to FOIA Request for Documents. Documents Listed in App a Already Available in Pdr.Forwards App B Documents.App C Documents Being Withheld in Entirety (Ref FOIA Exemption 5) ML20135D7891997-02-27027 February 1997 Forwards Responses to Comments Re Fort St Vrain Final Survey Rept ML20135D9531997-02-27027 February 1997 Forwards Copy of Amend to Util Npdes,Wastewater Discharge Permit CO-0001121,which Clarifies That Monitoring of Farm Pond Outlet Required When Industrial Wastewater Being Discharged Through Upstream Goosequill Ditch ML20135A8711997-02-14014 February 1997 Requests That Encl Deficiencies Identified in Financial Assurance Mechanism for Fort St Vrain Decommissioning Cost Be Addressed within 45 Days ML20134D1551997-01-31031 January 1997 Forwards Util Responses to NRC Comments Provided in NRC Ltr Re Sampling & Survey Plan Used for Final Radiological Survey of Liquid Effluent Pathway at Ft St Vrain ML20134C8481997-01-30030 January 1997 Forwards Draft Confirmatory Survey Rept for Fsv Nuclear Station,Psc,Platteville,Co Providing Info on Essap Activities on 960930-1003 ML20133L4961997-01-0707 January 1997 Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program ML20133E0481997-01-0202 January 1997 Forwards Comments to Fsv Nuclear Station, Decommissioning Project Final Survey Rept (Volumes 4-11), for Consideration ML20132G0421996-12-23023 December 1996 Forwards Insp Rept 50-267/96-05 on 961203-05.No Violations Noted ML20132F2841996-12-19019 December 1996 Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 960901-1130 ML20133A8591996-12-16016 December 1996 Forwards Original & Copy Transcripts of Public Hearing,Held on 961203 in Platteville,Co Re Decommissioning & License Termination of Util Ft Saint Vrain Nuclear Generating Station ML20133N0011996-12-0404 December 1996 Recommends That NRC Require License to Modify Submission of Unexecuted Draft Trust Agreement Remaining Decommissioning Costs for Ft St Vrain Nuclear Generating Station in Listed Ways ML20135B3861996-11-25025 November 1996 Informs That NRC Reviewed Util 961114 Submittal (P-96096) Entitled, Fort St Vrain Final Emergency Response Plan, & Meets Requirements of 10CFR50.54(q) ML20135A5861996-11-25025 November 1996 Submits Suppl Info Re Annual Environ Rept for 1995 Operation of Fsv ISFSI ML20135A6361996-11-20020 November 1996 Submits Copy of Describing Discharge Practices for Groundwater Seeping Into Fsv'S Reactor Building Sump ML20134L4721996-11-14014 November 1996 Notifies NRC That Util Adopted Fsv ISFSI Emergency Response Plan to Direct Emergency Response for Radiological Accidents Occuring at Site,Until 10CFR50 License Is Terminated ML20134F4351996-10-30030 October 1996 Forwards Sections 1,2,6 & 8 from Survey Packages F0015, F0039 & F0126 & Sections 1,2 & 6 from Survey Package F0115 to Support on-site NRC Insp ML20134G5991996-10-30030 October 1996 Forwards Volumes 1-12 to Final Survey Rept for Groups A,B,C Rev 1,D Rev 1,E,F Rev 1 & G-J for NRC Approval in Support of Forthcoming Request for Termination of Fsv 10CFR50 License ML20133D7691996-10-22022 October 1996 Forwards Preliminary Rept Re Orise Support of NRC License Insp at Fsv on 960930-1003 ML20136B1411996-10-15015 October 1996 FOIA Request for Documents Re NOV Addressed to Scientific Ecology Group Re NRC Insp Rept 50-267/94-03 & OI Investigation Repts 4-94-010 & 4-95-015 ML20128M6181996-10-0404 October 1996 Forwards Ltr from PSC to Co Dept of Public Health & Environ Describing Monitoring Practices at Plant ML20128G8041996-10-0101 October 1996 Forwards Fsv Decommissioning Fire Protection Plan Update 1999-03-26
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20205G8771999-03-26026 March 1999 Forwards Copy of Cover Page from Fort St-Vrain Welding Manual,Which Had Been Listed as Encl on Page 4 of 990325 Reply to EA 98-081.Cover Page Had Been Inadvertently Left Out with Original Reply ML20197H8811998-12-0101 December 1998 Forwards Proposed Change to Fsv ISFSI Physical Protection Plan in Which Commitment Is Made to Provide Feature to Security Posture for Facility ML20198K1931997-10-10010 October 1997 Provides Supplemental Info in Support of Util Proposed Rev to Physical Security Plan for Plant Plant Isfsi.Plan Withheld,Per 10CFR2.790(d) & 10CFR73.21 ML20141F3521997-05-14014 May 1997 Forwards Proposed Issue 4 of Physical Security Plan for Fort St Vrain ISFSI for Review & Approval.Encl Withheld,Per 10CFR2.790(d) ML20138G2701997-04-28028 April 1997 Provides Response to NRC Comments Re Proposed Sampling & Survey Plan for Fsv Effluent Pathway.Response Documents Fsv Liquid Effluent Discharge Pathway Areas Are Acceptable for Release for Unrestricted Use IAW Draft NUREG/CR-5849 ML20148D4651997-04-24024 April 1997 Forwards Revised Interim Ltr Rept Which Describes Procedures & Results of Confirmatory Survey of Group E Effluent Discharge Pathway Areas at Fsv Station ML20138B0511997-04-22022 April 1997 Forwards Copy of Proposed Amend to Fsv NPDES Permit, Wastewater Discharge Permit CO-0001121 Requested to Support Repowering Activities,Iaw Section 3.2.d of Fsv Non-Radiological Ts,App B to License DPR-34 ML20140E1061997-04-10010 April 1997 Forwards Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20137S4481997-04-0808 April 1997 Informs That Decommissioning Activities at Fsv Are Complete & NRC Issued Exemption from Requirements of 10CFR50.54(w) in .Property Damage Insurance Policy Is Maintaned to Protect Fsv balance-of-plant Assets ML20137S5421997-04-0707 April 1997 Forwards Final Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Fort St Vrain Nuclear Station ML20148D5951997-04-0404 April 1997 Forwards Confirmatory Survey for Fsv Nuclear Station, Psc,Platteville,Co, Final Rept ML20148D5811997-03-26026 March 1997 Forwards Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station, Covered in Final Survey Rept,Vol 6 ML20137G7361997-03-25025 March 1997 Requests Addl Time for Util to Respond to NRC Comments in Re Financial Assurance Mechanism for Fort St Vrain Decommissioning Costs ML20137G9521997-03-24024 March 1997 Forwards Quarterly 10CFR50.59 Rept for Period 961201-970228 Re Changes,Tests & Experiments for Fort St Vrain Decommissioning ML20137C0061997-03-18018 March 1997 Documents That There Have Been No Activities Involving Release of Radioactive Matls from Fsv Nuclear Station That Potentially Could Have Affected Environ,Subsequent to Previous Radiological Envion Operating Rept ML20137C0181997-03-18018 March 1997 Documents That No Personnel Has Received Radiation Exposure at Fsv in 1997 or at Any Time Subsequent to ML20136G1201997-03-11011 March 1997 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1996 & Jan-Mar 1997. All Effluent Releases Completed as of 960703.Repts on Activities After 960703 Reflect Disposal of Solid Waste ML20135D7891997-02-27027 February 1997 Forwards Responses to Comments Re Fort St Vrain Final Survey Rept ML20135D9531997-02-27027 February 1997 Forwards Copy of Amend to Util Npdes,Wastewater Discharge Permit CO-0001121,which Clarifies That Monitoring of Farm Pond Outlet Required When Industrial Wastewater Being Discharged Through Upstream Goosequill Ditch ML20134D1551997-01-31031 January 1997 Forwards Util Responses to NRC Comments Provided in NRC Ltr Re Sampling & Survey Plan Used for Final Radiological Survey of Liquid Effluent Pathway at Ft St Vrain ML20134C8481997-01-30030 January 1997 Forwards Draft Confirmatory Survey Rept for Fsv Nuclear Station,Psc,Platteville,Co Providing Info on Essap Activities on 960930-1003 ML20133E0481997-01-0202 January 1997 Forwards Comments to Fsv Nuclear Station, Decommissioning Project Final Survey Rept (Volumes 4-11), for Consideration ML20132F2841996-12-19019 December 1996 Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 960901-1130 ML20133A8591996-12-16016 December 1996 Forwards Original & Copy Transcripts of Public Hearing,Held on 961203 in Platteville,Co Re Decommissioning & License Termination of Util Ft Saint Vrain Nuclear Generating Station ML20133N0011996-12-0404 December 1996 Recommends That NRC Require License to Modify Submission of Unexecuted Draft Trust Agreement Remaining Decommissioning Costs for Ft St Vrain Nuclear Generating Station in Listed Ways ML20135A5861996-11-25025 November 1996 Submits Suppl Info Re Annual Environ Rept for 1995 Operation of Fsv ISFSI ML20135A6361996-11-20020 November 1996 Submits Copy of Describing Discharge Practices for Groundwater Seeping Into Fsv'S Reactor Building Sump ML20134L4721996-11-14014 November 1996 Notifies NRC That Util Adopted Fsv ISFSI Emergency Response Plan to Direct Emergency Response for Radiological Accidents Occuring at Site,Until 10CFR50 License Is Terminated ML20134F4351996-10-30030 October 1996 Forwards Sections 1,2,6 & 8 from Survey Packages F0015, F0039 & F0126 & Sections 1,2 & 6 from Survey Package F0115 to Support on-site NRC Insp ML20134G5991996-10-30030 October 1996 Forwards Volumes 1-12 to Final Survey Rept for Groups A,B,C Rev 1,D Rev 1,E,F Rev 1 & G-J for NRC Approval in Support of Forthcoming Request for Termination of Fsv 10CFR50 License ML20133D7691996-10-22022 October 1996 Forwards Preliminary Rept Re Orise Support of NRC License Insp at Fsv on 960930-1003 ML20136B1411996-10-15015 October 1996 FOIA Request for Documents Re NOV Addressed to Scientific Ecology Group Re NRC Insp Rept 50-267/94-03 & OI Investigation Repts 4-94-010 & 4-95-015 ML20128M6181996-10-0404 October 1996 Forwards Ltr from PSC to Co Dept of Public Health & Environ Describing Monitoring Practices at Plant ML20128G8041996-10-0101 October 1996 Forwards Fsv Decommissioning Fire Protection Plan Update ML20128G0481996-09-30030 September 1996 Submits Rev to Psco Definitions of Contents of Documentation Packages Re Fsv Final Survey Project ML20129C0421996-09-20020 September 1996 Forwards Quarterly Submittal of 10CFR50.59 Rept of Changes, Tests & Experiments for Facility Decommissioning,Covering Period of 960601-0831 ML20133D7601996-09-16016 September 1996 Forwards Confirmatory Survey Plan for Fsv Nuclear Station Decommissioning Project,First Final Survey Rept Submittal- Vols 1-5.NRC Comments Incorporated.Spending Plan Attached ML20117P0711996-09-13013 September 1996 Describes Util Plans to Remove Bldg 28 from Plant Facility ML20129A4431996-09-11011 September 1996 Describes Util Plans for Demonstrating That Liquid Effluent Pathway & Surrounding Open Land Areas Satisfy 10 Mrem/Yr Criteria Provided in Plant Final Survey Plan ML20117K5291996-09-0404 September 1996 Provides Notification That Util Will Be Revising Financial Assurance Mechanism That Will Be Used to Cover Remaining Costs of Decommissioning Plant ML20117C7281996-08-22022 August 1996 Discusses Impact of Final Decommissioning Rule & Requests NRC Concurrence That Requirements to Submit & Obtain Approval of License Termination Plan Have Been Satisfied ML20116P3431996-08-16016 August 1996 Describes Actions to Remove Structures & Equipment Items from Fort St Vrain Facility for NRC Info.Requests That NRC Advise Util of Wishes to Perform Confirmatory Survey of Any Parts of New Fuel Storage Building Before 960903 ML20133D7551996-08-14014 August 1996 Provides Environ Survey & Site Assessment Program'S (Essap) Comments Re Review of Fsv Nuclear Station Decommissioning Project Final Survey Rept ML20116M0771996-08-14014 August 1996 Provides Suppl Response to Re Insp Rept 50-267/96-01 in Jan 1996 Re NRC Concerns About Fsv Final Survey Program.Specifically,Bias in Instrumentation Response Overestimating Amount of Contamination Present ML20116M1841996-08-13013 August 1996 Forwards Util Responses to NRC Comments in Re Use of in-situ Gamma Spectroscopy to Measure Exposure Rates During Plant Final Survey.Approval to Use in-situ Gamma Spectroscopic instrument,Microspec-2,requested ML20116K0061996-08-0909 August 1996 Submits Fort St Vrain Nuclear Station Decommissioning Project Final Survey Rept ML20116M1241996-08-0808 August 1996 Responds to NRC Bulletin 96-004, Chemical,Galvanic,Or Other Reactions in Spent Fuel Storage & Transportation. Informs That Modular Vault Dry Storage Sys Is Not Susceptible to Problems Addressed in Bulletin ML20116F3611996-08-0202 August 1996 Submits Revised Documentation for Fort St Vrain Final Survey Program ML20116F8141996-08-0202 August 1996 Informs of Util Intent to Modify Fort St Vrain Control Room,Which Will Make Certain Final Survey Locations Unavailable for Further Review.Final Survey Efforts Are Complete ML20116A4511996-07-19019 July 1996 Requests NRC Approval of Proposed Method to Fsv Final Survey Plan to Determine Exposure Rates in Prestressed Concrete Reactor Vessel 1999-03-26
[Table view] |
Text
1 O eubiic service' 16805 WCR 191/2; Platteville, Colorado 80651
==.-
August 16,1996 Fort St. Vrain P-96069 U.S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, D.C. 20555 ATTN: Mr. Michael F. Weber, Chief Decommissioning and Regulatory Issues Branch Docket No. 50-267
SUBJECT:
Removal of Equipment Items and New Fuel Storage Building That Are Included in the Final Survey Program
REFERENCES:
- 1. PSCo Letter, Borst to Weber, dated August 2,1996 (P-96065) i i
- 2. PSCo Ixtter, Borst to Weber, dated May 31,1996 l (P-96041)
I
Dear Mr. Weber:
l This letter describes for your information, Public Service Company of Colorado's (PSCo) actions to remove structures and equipment items from the Fort St. Vrain facility. These items are identified in the final survey program and their removal will make certain final survey measurement locations unavailable for further review. The items described in this letter include asbestos insulation from certain piping sections located in the turbine building, a temporary construction office and mobile rest room facility that had been installed for decommissioning workers, and the New Fuel Storage Building. These items and the impact on the final survey program are described as follows:
D h
Asbestos Insu'ation Removal In Reference 1, PSCo described activities to remove portions of the control room as part of the Fort St. Vrain repowering project. The repowering project also involves connections to existing secondary piping systems, which requires the removal of asbestos 9608230259 960816 PDR ADOCK 05000267 P PDR
i 4
l P-96069 i August 16,1996 j Page 2 l
! containing thermal insulation from certain pipe sections. This insulation is being l removed as part of the same aMa* abatement effort currently in progress for the )
control room modifications, and its removal also removes certain final survey l i measurement locations.
j Four final survey areas are involved with insulation removal. Final survey efforts in j
! these survey areas are complete and the results were reported to the NRC in Reference j
- 2. A brief overview of the impact of insulation removal efforts is as follows:
l Survey Area C0007 Turbine Building I2 vel 5 - North General Area, structures and
- equipment. This area was classified as unaffected, no remediation
! was performed, and the measurements were well below release
! criteria guideline values. Approximately 21 of the 90 measurement location labels are being removed with the insulation.
l
- Survey Area C0021 Turbine Building Level 6 - Northwest General Area, structures and 1 equipment. This area was unaffected and all measurements were l well below release criteria guideline values. Some of the insulation in this area had been removed as contaminated.
Approximately 44 of the 127 measurement location labels are being removed with the insulation.
Survey Area C0023 Turbine Building Ixvel 6 - Northeast General Area, structures and equipment. This area was classified as unaffected, no remediation was performed, and the measurements were well below release criteria guideline values. Only 1 of the 31 measurement location labels is being removed with the insulation.
Survey Area C0060 Turbine Building levels 6 through 12 - Pipe Chase, structures and equipment. This area was classified as unaffected, no remediation was performed, and the measurements were well below release criteria guideline values. Three of the 95 measurement location labels are being removed with the insulation.
Construction Office and Mobile Rest Room Facility Removal In the early stages of decommissioning activities, PSCo's decommissioning contractor, the Westinghouse Team, installed a temporary construction office and a mobile rest. room facility on the turbine deck, to support their work force. These temporary structures were surveyed as part of the final survey effort and are included in Survey Area C0032.
The final survey report for this survey area will be provided for NRC approval with the last report submittal, currently scheduled for the end of September 1996.
1 4
~
- P-96069 l l August 16,1996 l
- l. Page 3 Survey Area C0032 was classified as affected, survey measurements were found to be l l well below release criteria guideline values, and no remedial actions were required.
A brief overview of these removal activities is as follows:
(
l
- The mobile rest room facility consisted of a trailer with wheels, and the entire trailer will be removed. All interior and exterior surfaces were surveyed and approximately 276 survey measurement location labels will be removed when the trailer is removed.
- The temporary construction office consisted of four plywood walls and a wooden framework, and has already been disassembled and removed from the turbine i deck. The turbine deck was the floor and there was no ceiling. All interior and exterior surfaces of the walls were surveyed and approximately 72 survey measurement location labels were removed with the temporary office.
!
- Survey measurement results for these locations will remain as part of the final data set and will be used for reporting purposes.
l New Fuel Storage Building i
The New Fuel Storage Building is a concrete building located east of the Reactor Building and just north of the repowering area. This building must be removed to allow excavation and installation of foundations for the heat recovery steam generator which is the second phase of the Fort St. Vrain repowering project. PSCo's contractor for repowering plans to install the foundation before the onset of harsh winter weather, and is planning to initiate demolition activities the week of September 3,1996.
The New Fuel Storage Building was used to store new unirradiated nuclear fuel during plant operations. During decommissioning, this building was used for storage of certain low level radioactive wastes and for various waste processing activities. The New Fuel Storage Building is included in final Survey Area 10012 which is classified as an affected structure, and adjacent open land areas will also be involved. Survey measurements are nearing completion and one area of elevated activity required remediation. An
- independent survey of the area is being performed for PSCo by GPU Nuclear, and PSCo
- will verify that all building surfaces are well below release criteria guideline values prior j to our authorization to procede with demolition. The demolished materials from the
{ building will be stored on-site; however, they will likely be located in a pile of rubble and may not be available for confirmatory urveys.
1 i
I P-96069 l
August 16,1996 :
Page 4
{
PSCo requests that the NRC advise us before September 3,1996, if you wish to perform l a confirmatory survey of any parts of the New Fuel Storage Building or surrounding areas, or if you wish to see specific final survey measurement results for this area.
1 Conclusion PSCo considers that the Release Records for the survey areas identified above will serve ;
as complete documentation of the acceptable radiological condition of these areas. As j other significant configuration changes arise in the future in areas covered by the Fort -
St. Vrain Final Survey Program, we will submit written notification to you, for information.
If you have any questions regarding this information, please contact Mr. M. H. Holmes at (303) 620-1701.
Sincerely,
. i hdlSc Q-Frederic J. Borst Decommissioning Program Director 1
I FJB/SWC j i
cc: Regional Administrator, Region IV Mr. Robert M. Quillin, Director )