Letter Sequence Withholding Request Acceptance |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance
- Supplement, Supplement
Results
Other: ML19112A318, ML20006E044, ML20024F053, ML20024F063, ML20026A002, ML20091J918, ML20091J919, ML20091L448, ML20092G718, ML20297A321, ML20297A325, ML20297A360, ML20309A853, ML20316A008, ML20318A379, ML21126A008, ML21126A013, ML21147A553
|
MONTHYEARBVY 17-004, Technical Specifications Proposed Change No. 313: Revision to License and Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool2017-07-20020 July 2017 Technical Specifications Proposed Change No. 313: Revision to License and Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool Project stage: Request BVY 17-023, Proposed Revision to the Entergy Vermont Yankee Quality Assurance Program Manual (VY QAPM)2017-09-19019 September 2017 Proposed Revision to the Entergy Vermont Yankee Quality Assurance Program Manual (VY QAPM) Project stage: Request ML18066A7352018-03-0202 March 2018 Settlement Agreement Between Entergy, Northstar, State of Vermont Agencies, and Others Related to the Proposed Purchase and Sale of the Vermont Yankee Nuclear Station (License DPR-28, Docket No. 50-271) Project stage: Request ML18066A0442018-03-0202 March 2018 March 2, 2018 Vermont Yankee Settlement Agreement Project stage: Request ML18099A1662018-05-0101 May 2018 Entergy Vermont Yankee Quality Assurance Program Manual - Review and Acceptance of Changes Project stage: Request 3F0618-02, Site Specific Decommissioning Cost Estimate2018-06-27027 June 2018 Site Specific Decommissioning Cost Estimate Project stage: Request ML18156A1792018-08-15015 August 2018 Issuance of Amendment to Change the Permanently Defueled Project stage: Request BVY 18-033, Vermont Yankee Registration of Spent Fuel Cask Use and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2018-08-16016 August 2018 Vermont Yankee Registration of Spent Fuel Cask Use and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool Project stage: Request ML18242A6392018-10-11011 October 2018 Safety Evaluation of License Transfer Request (License DPR-28, Docket Nos. 50-271 and 72-59 Project stage: Request ML19077A2322019-03-18018 March 2019 Applicants' Answer Opposing the Commonwealth of Massachusetts' Petition for Leave to Intervene and Hearing Request Project stage: Request RA-19-0159, Stations - Biennial Decommissioning Financial Assurance Reports2019-03-28028 March 2019 Stations - Biennial Decommissioning Financial Assurance Reports Project stage: Request ML19091A1892019-04-0101 April 2019 Watch Reply to Applicant'S Answer Opposing Pilgrim Watch Petition for Leave to Intervene and Hearing Request Project stage: Request ML19116A1622019-04-26026 April 2019 Watch Motion to Supplement Its Motion to Intervene and Request for Hearing. New Information Project stage: Request 3F0619-01, Application for Order Consenting to Direct Transfer of Control of Licenses and Approving Conforming License Amendment2019-06-14014 June 2019 Application for Order Consenting to Direct Transfer of Control of Licenses and Approving Conforming License Amendment Project stage: Request ML19112A3182019-06-20020 June 2019 FRN - Exemption for Hdi to Use Oyster Creek Nuclear Decommissioning Trust Fund Re Request for License Transfer from Exelon Project stage: Other ML19177A0802019-06-26026 June 2019 Nuclear Generating Plant (CR-3) - Notification of Revised Post-Shutdown Decommissioning Activities Report (Revised PSDAR) Project stage: Request ML19210E4702019-07-29029 July 2019 Transmittal of Response to NRC Request for Additional Information Regarding Request for Direct and Indirect License Transfers, RAI-PFPB-1 and - 2 Project stage: Response to RAI ML19329C9922019-11-21021 November 2019 LTR-19-0459 Senator Charles Schumer, Et Al., Letter to Holtec Regarding Oversight of the Decommissioning Process and the Potential Transfer of Indian Point'S Nuclear Regulatory Commission License from Entergy Corporation to Holtec Internati Project stage: Request NL-19-084, Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2019-11-21021 November 2019 Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments Project stage: Request ML19329B3242019-11-25025 November 2019 Watch Motion to Supplement Its February 20, 2019 Motion to Intervene and Request for Hearing, Its April 1, 2019 Reply to Petitioners, and Its May 3, 2019 Motion to Supplement Project stage: Request ML19345D3452019-12-0404 December 2019 Site-Specific Decommissioning Cost Estimate Project stage: Request ML19343C6922019-12-0909 December 2019 Applicants' Answer Opposing Pilgrim Watch'S Third Motion to Supplement Its Motion to Intervene and Request for Hearing Project stage: Request ML19347D4152019-12-13013 December 2019 Motion of the Commonwealth of Massachusetts to Amend Its Petition with New Information Project stage: Request ML19354A6982019-12-19019 December 2019 Post Shutdown Decommissioning Activities Report Including Site-Specific Decommissioning Cost Estimate for Indian Point Nuclear Generating Units 1, 2, and 3 Project stage: Request ML20003E1522020-01-0303 January 2020 Acceptance Review Determination (E-mail Dated 1/3/19) Entergy-Holtec License Transfer Application Project stage: Acceptance Review ML20007E9182020-01-0707 January 2020 Applicants' Answer Opposing the Commonwealth of Massachusetts' Second Motion to Supplement Its Petition with New Information Project stage: Request ML20006E0442020-01-14014 January 2020 Notice of Consideration of Approval of Transfers of Renewed Facility Operating Licenses and Conforming Amendments, and Opportunity for a Hearing Project stage: Other ML20006E1222020-01-15015 January 2020 Individual Federal Register Notice for Consideration of Approval of Transfer of Licenses and Conforming Amendments Project stage: Request ML20017A2902020-01-17017 January 2020 Supplement to Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments Project stage: Supplement ML20023B3292020-01-21021 January 2020 LTR-20-0019 Senator Charles Schumer, Et Al., Letter Request for NRC to Extend the Public Comment Period for the License Transfer for Indian Point Project stage: Request ML20043E1232020-02-0505 February 2020 Declaration of George W. Heitzman in Support of New York Petition Project stage: Request ML20043F2732020-02-0505 February 2020, 10 February 2020, 12 February 2020 New York State Petition for Leave to Intervene and for Hearing with Supporting Declarations Project stage: Request ML20026A0022020-02-10010 February 2020 Holtec Proposed Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate Project stage: Other ML20043E1252020-02-10010 February 2020 Declaration of Alyse L. Peterson in Support of New York Petition Project stage: Request ML20024F0632020-02-11011 February 2020 Extension of Comment Period for Notice of Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments and Opportunity for a Hearing Project stage: Other ML20026A0012020-02-11011 February 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20043F5302020-02-12012 February 2020 Petition of Riverkeeper, Inc. to Intervene and for a Hearing Project stage: Request ML20043F0542020-02-12012 February 2020 Petition by the Town of Cortlandt, Village of Buchanan, and Hendrick Hudson School District'S for Leave to Intervene and Hearing Request Project stage: Request ML20043E1212020-02-12012 February 2020 Declaration of Warren K. Brewer in Support of New York Petition Project stage: Request ML20043E1222020-02-12012 February 2020 Declaration of Daniel J. Evans in Support of New York Petition Project stage: Request ML20043E1262020-02-12012 February 2020 Declaration of Timothy B. Rice in Support of New York Petition Project stage: Request ML20043E1282020-02-12012 February 2020 Declaration of Chiara Trabucchi in Support of New York Petition Project stage: Request ML20024F0532020-02-13013 February 2020 Extension of Comment Period Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments Project stage: Other ML20056F0952020-02-13013 February 2020 Concerns Pertaining to Gas Transmission Lines at the Indian Point Nuclear Power Plant Project stage: Request ML20057F7012020-02-23023 February 2020 Comment from Noah Kimerling on the Indian Point Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments (NRC-2020-0021) Project stage: Request ML20055G1192020-02-23023 February 2020 Comment from Janelle Peotter on the Indian Point Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments (NRC-2020-0021) Project stage: Request ML20057F7102020-02-23023 February 2020 Comment from Daniel Levy on the Indian Point Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments (NRC-2020-0021) Project stage: Request ML20057F7072020-02-23023 February 2020 Comment from Caryl Kottmann on the Indian Point Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments (NRC-2020-0021) Project stage: Request ML20066H3522020-02-23023 February 2020 Comment from Paula Zimmerman-Taylor on the Indian Point Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments (NRC-2020-0021) Project stage: Request ML20066H3532020-02-23023 February 2020 Comment from Robert Powell on the Indian Point Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments (NRC-2020-0021) Project stage: Request 2019-04-01
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 and 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23194A0442023-07-11011 July 2023 Clarification for Indian Point Energy Center License Amendment Request, Independent Spent Fuel Storage Installation Physical Security Plan ML23192A1002023-07-11011 July 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme ML23171B0432023-06-23023 June 2023 Letter - Indian Point Energy Center - Request for Additional Information for Independent Spent Fuel Storage Installation Facility-Only Emergency Plan License Amendment 2024-08-06
[Table view] Category:Proprietary Information Review
MONTHYEARML21060B6022021-03-11011 March 2021 Request for Withholding Information from Public Disclosure ML20184A0012020-07-0606 July 2020 Request for Withholding Information from Public Disclosure ML20026A0012020-02-11011 February 2020 Request for Withholding Information from Public Disclosure ML20012H1732020-01-13013 January 2020 Request for Withholding Information from Public Disclosure ML18171A0462018-06-29029 June 2018 Request for Withholding Information from Public Disclosure (Westinghouse) ML18171A0342018-06-29029 June 2018 Request for Withholding Information from Public Disclosure (Holtec) ML17316A0022017-11-27027 November 2017 Request for Withholding Information from Public Disclosure (CAC Nos. MF8991 and MF8992; EPID: L-2016-LLA-0039) ML17316A0012017-11-27027 November 2017 Request for Withholding Information from Public Disclosure (CAC Nos. MF8991 and MF8992; EPID: L-2016-LLA-0039) ML17316A0002017-11-27027 November 2017 Request for Withholding Information from Public Disclosure (CAC Nos. MF8991 and MF8992; EPID: L-2016-LLA-0039) ML16211A0592016-10-21021 October 2016 Request for Withholding Information from Public Disclosure ML16020A2192016-02-17017 February 2016 Request for Withholding Information from Public Disclosure for Indian Point Unit Nos. 2 and 3 ML15288A1402015-12-0404 December 2015 Request for Withholding Information from Public Disclosure ML15288A4022015-12-0404 December 2015 Request for Withholding Information from Public Disclosure ML15288A2122015-12-0404 December 2015 Request for Withholding Information from Public Disclosure ML15230A4102015-09-19019 September 2015 Request for Withholding Information from Public Disclosure ML15083A0792015-04-17017 April 2015 Request for Withholding Information from Public Disclosure for Shutdown Margin Confirmation ML14217A2062014-08-14014 August 2014 Respect for Withholding Information from Public Disclosure ML14119A0732014-06-18018 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14139A3592014-06-17017 June 2014 Issuance of Amendments Request for Withholding Information from Public Disclosure ML14139A3962014-06-17017 June 2014 Request for Withholding Information from Public Disclosure ML13298A7082013-11-13013 November 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request Concerning Pressure-Temperature Limits and Low Temperature Over-Pressure Protection Requirements for Indian Point Nuclear Generating Unit No. 2 ( ML12150A3832012-06-25025 June 2012 Request for Withholding Information from Public Disclosure (TAC Nos. ME1671, ME1672, and L24299) ML12153A1962012-06-25025 June 2012 Request for Withholding Information from Public Disclosure ML1134001842012-01-13013 January 2012 Request for Withholding Information from Public Disclosure ML1130703802011-12-0505 December 2011 Request for Withholding Information from Public Disclosure (TAC Nos. ME1671, ME1672, and L24299) ML1127701542011-10-31031 October 2011 Request for Withholding Information from Public Disclosure (TAC ME1671, ME1672, and L24299) ML1001908342010-01-22022 January 2010 Entergy Nuclear Operations, Inc. - Request for Withholding Information from Public Disclosure for Extension of Orders Approving Indirect Transfer of Control of Licenses (TAC Nos. ME2515 Through ME2522) ML0930206032009-11-12012 November 2009 Request for Withholding Information from Public Disclosure ML0736500192008-01-0707 January 2008 Entergy Nuclear Operations, Inc.-Request for Withholding Information from Public Disclosure for Indirect Transfer of Control of Licenses (TAC Nos. MD6178 Through MC6185) ML0727500322007-10-11011 October 2007 Entergy Nuclear Operations, Inc. - Request for Withholding Information from Public Disclosure for Indirect Transfer of Control of Licenses (TAC Nos. MD6178 Through MD6185) ML0610703002006-04-20020 April 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Indian Point Nuclear Generating Unit No. 2 ML0508101892005-03-23023 March 2005 (IP3), Withholding from Public Disclosure, Polestar-prepared Calculation, Psat 3056CT.QA.04, Calculation of Indian Point 3 Engineered Safety Feature Component Leakage Iodine Release with Boundary Layer Effect, Rev. 1 ML0426703652004-09-23023 September 2004 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure ML0411400692004-04-23023 April 2004 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure ML0320200092003-07-21021 July 2003 Withholding from Public Disclosure, Wcobra/Trac Computer Code and Related Material ML0316209792003-06-11011 June 2003 Caldon, Inc., Request for Withholding Information from Public Disclosure. ML0304501082003-02-13013 February 2003 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Indian Point, Unit No. 2 ML0303101292003-01-31031 January 2003 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure ML0232905142002-11-25025 November 2002 Westinghouse Electric Company, Request for Additional Information for Withholding from Public Disclosure for Indian Point Nuclear Generating Unit 3 ML0232904732002-11-25025 November 2002 Caldon, Inc., Request for Withholding Information from Public Disclosure for Indian Point Nuclear Generating Unit No. 3 ML0220507412002-08-15015 August 2002 Request for Withholding Information in Westinghouse WCAP-15902-P, Rev. 0 from Public Disclosure 2021-03-11
[Table view] |
Text
February 11, 2020 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 1, 2 AND 3 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (EPID L-2019-LLM-0003)
Dear Sir or Madam:
By letter dated November 21, 2019, to the U.S. Nuclear Regulatory Commission (NRC), Entergy Nuclear Operations, Inc. (Entergy), submitted an affidavit dated November 21, 2019, executed by A. Christopher Bakken, III, President and Chief Executive Officer, Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC, and an affidavit also dated November 21, 2019, executed by Pamela B. Cowan, Senior Vice President and Chief Operating Officer, Holtec Decommissioning International, LLC, requesting that information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:
Enclosure 1P - Membership Interest Purchase and Sale Agreement by and Among Nuclear Asset Management Company, LLC, Holtec International, Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Indian Point 3, LLC, dated as of April 15, 2019 (Proprietary)
The letter with the nonproprietary version of Enclosure 1P, provided as Attachment B, Membership Interest Purchase and Sale Agreement (Non-Proprietary) (without exhibits), has been placed in the NRCs Public Document Room and added to the NRC Library at Agencywide Documents Access and Management System Accession No. ML19326B953.
Mr. Bakkens affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- i. Enclosure 1P contains confidential commercial information, the disclosure of which would adversely affect Entergy.
ii. This information has been held in confidence by Entergy.
iii. Entergy customarily keeps such information in confidence, and there is a rational basis for holding such information in confidence. The information is not available from public sources and could not be gathered readily from other publicly available information.
iv. Public disclosure of this information would cause substantial harm to Entergys business interests because such information has significant commercial value to Entergy and its disclosure could adversely affect other Entergy transactions.
Ms. Cowans affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- i. Enclosure 1P contains confidential commercial information, the disclosure of which would adversely affect Holtec.
ii. This information has been held in confidence by Holtec.
iii. Holtec customarily keeps such information in confidence, and there is a rational basis for holding such information in confidence. The information is not available from public sources and could not be gathered readily from other publicly available information.
iv. Public disclosure of this information would cause substantial harm to Holtecs business interests because such information has significant commercial value to Holtec and its disclosure could adversely affect other Holtec transactions.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1030 or by e-mail to Richard.Guzman@nrc.gov.
Sincerely,
/RA/
Richard V. Guzman, Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.50-003, 50-247, 50-286, and 72-051 cc: Mr. A. Christopher Bakken, III, President and Chief Executive Officer, Entergy Nuclear Operations, Inc.
1340 Echelon Pkwy Jackson, MS 39213 cc: Ms. Pamela B. Cowan, Senior Vice President and Chief Operating Officer, Holtec Decommissioning International, LLC 1 Holtec Boulevard Camden, NJ 08104 Listserv
ML20026A001 *by e-mail OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NMSS/REFS/FAB/BC*
NAME RGuzman LRonewicz FMiller DATE 02/03/2020 01/31/2020 02/04/2020 OFFICE NRR/DORL/LPL1/BC NRR/DORL/LSPB/PM NAME JDanna RGuzman DATE 02/11/2020 02/11/2020