Proposed Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate
ML20026A002
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 02/10/2020
From: Richard Guzman
NRC/NRR/DORL/LPL1
To: Sterdis A
Holtec Decommissioning International
Guzman R
References
EPID L-2019-LLM-0003
Download: ML20026A002 (3)


Text

February 10, 2020 Ms. Andrea L. Sterdis Vice President, Regulatory & Environmental Affairs Holtec Decommissioning International, LLC Krishna P. Singh Technology Campus 1 Holtec Blvd.

Camden, NJ 08104

SUBJECT:

INDIAN POINT NUCLEAR GENERATING UNIT NOS. 1, 2, AND 3 - HOLTEC PROPOSED POST-SHUTDOWN DECOMMISSIONING ACTIVITIES REPORT WITH SITE-SPECIFIC DECOMMISSIONING COST ESTIMATE (EPID L-2019-LLM-0003)

Dear Ms. Sterdis:

By letter dated November 21, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19326B953), Entergy Nuclear Operations, Inc. (ENOI), on behalf of itself and Entergy Nuclear Indian Point 2, LLC (ENIP2); Entergy Nuclear Indian Point 3, LLC (ENIP3); Holtec International (Holtec); and Holtec Decommissioning International, LLC (HDI)

(collectively, the applicants), requested that the U.S. Nuclear Regulatory Commission (NRC) consent to: (1) the transfer of control of the Operating Licenses for Indian Point Nuclear Generating Unit Nos. 1, 2, and 3 (referred to individually as IP1, IP2, or IP3, and collectively as the Indian Point Energy Center or IPEC), as well as the general license for the IPEC Independent Spent Fuel Storage Installation (ISFSI) (collectively, the licenses), to Holtec subsidiaries to be known as Holtec Indian Point 2, LLC (Holtec IP2) and Holtec Indian Point 3, LLC (Holtec IP3), and (2) the transfer of ENOIs operating authority (i.e., its authority to conduct licensed activities at Indian Point) to HDI. In addition, the applicants requested that the NRC approve conforming administrative amendments to the licenses to reflect the proposed transfer and the deletion of certain license conditions to reflect satisfaction and termination of certain obligations after the license transfer.

By letter dated December 19, 2019 (ADAMS Accession No. ML19354A698), HDI submitted a Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate for Indian Point Nuclear Generating Units 1, 2, and 3.

The regulation under Section 50.82(a)(4)(i) of Title 10 of the Code of Federal Regulations states:

Prior to or within 2 years following permanent cessation of operations, the licensee [emphasis added] shall submit a post-shutdown decommissioning activities report (PSDAR) to the NRC, and a copy to the affected State(s). The PSDAR must contain a description of the planned decommissioning activities along with a schedule for their accomplishment, a discussion that provides the reasons for concluding that the environmental impacts associated with site-specific decommissioning activities will be bounded by appropriate previously issued environmental impact statements, and a site-specific DCE

[decommissioning cost estimate], including the projected cost of managing irradiated fuel.

In its letter dated December 19, 2019, HDI stated, in part:

In accordance with the requirements of Title 10 of the Code of Federal Regulations (CFR) 50.82, Termination of license, paragraph (a)(4)(i), this DECON PSDAR is being submitted to notify the NRC of HDIs decommissioning plans based on an accelerated decommissioning schedule for the prompt decommissioning of IP1, 2 & 3 and unrestricted release of all portions of the site other than the ISFSI, if the license transfers are approved by the NRC and the transaction closes.

The DECON PSDAR is contingent upon NRC approval of the transfer of the IP1, 2 and 3 licenses.

The purpose of this letter is to inform you that, consistent with the above regulatory requirements and HDI statements, the NRC staff will not consider the HDI PSDAR submittal dated December 19, 2019, under the provisions of 10 CFR 50.82(a)(4) because HDI is not the licensee for IPEC. However, the NRC staff is treating the HDI PSDAR submittal as a supplement to the IPEC license transfer application dated November 21, 2019, until such time as the NRC makes a regulatory decision regarding the IPEC license transfer application.

If you have any questions, please contact me at 301-415-1030 or by e-mail to Richard.Guzman@nrc.gov.

Sincerely,

/RA/

Richard V. Guzman, Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.50-003, 50-247, 50-286, and 72-051 cc: Listserv

SUBJECT:

INDIAN POINT NUCLEAR GENERATING UNIT NOS. 1, 2, AND 3 - HOLTEC PROPOSED POST-SHUTDOWN DECOMMISSIONING ACTIVITIES REPORT WITH SITE-SPECIFIC DECOMMISSIONING COST ESTIMATE (EPID L-2019-LLM-0003) DATED FEBRUARY 10, 2020 DISTRIBUTION:

PUBLIC PM File Copy RidsACRS_MailCTR RidsNrrDorlLpl1 RidsNrrLALRonewicz RidsNrrPMIndian Point RidsRgn1MailCenter RidsNMSSDuwpRDB ADAMS Accession No.: ML20026A002

  • by e-mail OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA OGC - NLO*

NAME RGuzman LRonewicz JWachutka DATE 02/03/2020 01/31/2020 02/06/2020 OFFICE NMSS/DUWP/RDB/BC*

NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME BWatson JDanna RGuzman DATE 01/31/2020 02/10/2020 02/10/2020 OFICIAL RECORD COPY