Schedule Revision for the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024)
ML19100A254
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/29/2019
From: Eric Oesterle
Division of Materials and License Renewal
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
Wu A, NRR-DMLR 415-2995
References
EPID L-2018-RNW-0023, EPID L-2018-RNW-0024
Download: ML19100A254 (5)


Text

April 29, 2019 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd Glen Allen, VA 29060

SUBJECT:

SURRY POWER STATION, UNIT NOS. 1 AND 2 - SCHEDULE REVISION FOR THE SUBSEQUENT LICENSE RENEWAL APPLICATION REVIEW (EPID NOS.

L-2018-RNW-0023 AND L-2018-RNW-0024)

Dear Mr. Stoddard:

By letter dated October 15, 2018 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML18291A842), as supplemented by letters dated January 29, 2019 (ADAMS Accession No. ML19042A137), and April 2, 2019 (ADAMS Accession No. ML19095A666), the Virginia Electric and Power Company (Dominion Energy Virginia or Dominion) submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) an application to renew the Renewed Facility Operating License Nos. DPR-32 and DPR-37 for the Surry Power Station (SPS), Unit Nos. 1 and 2. Dominion submitted the application pursuant to Title 10 of the Code of Federal Regulations Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, for subsequent license renewal.

By letter dated December 3, 2018 (ADAMS Accession No. ML18320A236), the NRC concluded that the application was acceptable for docketing and included the staffs projected review schedule for the SPS subsequent license renewal application (Enclosure 1).

The purpose of this letter is to inform you of three changes in the schedule for the SPS subsequent license renewal application.

For the safety review, the scheduled due date for ACRS Full Committee Meeting was revised from March 2020 to April 2020. This change was made due to finalization of the Advisory Committee on Reactor Safeguards (ACRS) Full Committee Meeting which is now expected to be in the first week of April 2020.

For the environmental review, the scheduled due dates for Issue Final SEIS [Supplemental Environmental Impact Statement] and U.S. Environmental Protection Agency FRN Published

- Availaiblity of Final SEIS were both revised from March 2020 to April 2020 to support workload priorization. The overall schedule for issuance of the renewed license is not impacted. of this letter is the staffs revised projected review schedule for the SPS subsequent license renewal application.

D. Goddard If you have any questions related to this review schedule, please contact Emmanual Sayoc at 301-415-4084 or Emmanuel.Sayoc@nrc.gov for the safety review or Tam Tran at 301-415-3617 or Tam.Tran@nrc.gov.

Sincerely,

/RA/

Eric. R. Oesterle, Chief License Renewal Project Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281

Enclosures:

1. Review Schedule from NRC Letter dated December 3, 2018
2. Revised Review Schedule cc w/encls: Listserv

ML19100A254 *concurred by email OFFICE PM:MRPB:DMLR PM:MRPB:DMLR LA:MRPB:DMLR PM:MRPB:DMLR NAME AWu ESayoc* SLent TTran DATE 4/5/19 4/8/19 4/10/19 4/10/19 OFFICE BC:MRPB:DMLR BC:MENB:DMLR (A) D:DMLR NAME EOesterle KErwin JDonoghue DATE 4/29/19 4/29/19 4/29/19

SURRY POWER STATION, UNIT NOS. 1 AND 2 Subsequent License Renewal Application Review Schedule from NRC Letter Dated December 3, 2018 Milestone Scheduled Actual Receive Subsequent License Renewal Application (SLRA) 10/2018 10/15/2018 Publish Federal Register Notice (FRN) - LRA Availability 11/2018 11/1/2018 Publish FRN - Docketing Acceptance/Rejection and Opportunity for 12/2018 Hearing Publish FRN - Notice of Intent to Prepare an Environmental 12/2018 Impact Statement and Conduct Scoping Public Meeting - Overview of Subsequent License Renewal 1/2019 Process and Environmental Scoping Environmental Scoping Period Ends 2/2019 Deadline for Filing Hearing Requests and Petitions for Intervention 2/2019 Issue Draft Supplemental Environmental Impact Statement (DSEIS) 9/2019 Public Meeting - Draft SEIS Meeting, If Needed 10/2019 End of DSEIS Comment Period 11/2019 Issue Safety Evaluation Report (SER) 11/2019 Advisory Committee on Reactor Safeguards (ACRS) 2/2020 Subcommittee Meeting Issue Final SEIS 3/2020 U.S. Environmental Protection Agency FRN Published 3/2020

- Availability of Final SEIS ACRS Full Committee Meeting 3/2020 Decision - Director, NRR 6/2020 Enclosure 1

SURRY POWER STATION, UNIT NOS. 1 AND 2 Revised Subsequent License Renewal Application Review Schedule Milestone Scheduled Actual Receive Subsequent License Renewal Application (SLRA) 10/2018 10/15/2018 Publish Federal Register Notice (FRN) - LRA Availability 11/2018 11/01/2018 Publish FRN - Docketing Acceptance/Rejection and Opportunity for Hearing 12/2018 12/10/2018 Publish FRN - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping 12/2018 12/20/2018 Public Meeting - Overview of Subsequent License Renewal Process and Environmental Scoping 1/2019 1/8/2019 Environmental Scoping Period Ends 2/2019 1/22/2019 Deadline for Filing Hearing Requests and Petitions for Intervention 2/2019 2/15/2019 Issue Draft Supplemental Environmental Impact Statement (DSEIS) 9/2019 Public Meeting - Draft SEIS Meeting, If Needed 10/2019 End of DSEIS Comment Period 11/2019 Issue Safety Evaluation Report (SER) 11/2019 Advisory Committee on Reactor Safeguards (ACRS)

Subcommittee Meeting 2/2020 Issue Final SEIS 4/2020 U.S. Environmental Protection Agency FRN Published

- Availability of Final SEIS 4/2020 ACRS Full Committee Meeting 4/2020 Decision - Director, NRR 6/2020 Enclosure 2