Receipt and Availability of the Subsequent License Renewal Application for Surry Power Station, Unit Nos. 1 and 2
ML18297A045
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/26/2018
From: George Wilson
Division of Materials and License Renewal
To: Stoddard D
Dominion Energy Co, Virginia Electric & Power Co (VEPCO)
Sayoc E, NRR/DMLR 415-4084
Shared Package
ML18297A093 List:
References
EPID L-2018-RNW-0023, EPID L-2018-RNW-0024
Download: ML18297A045 (3)


Text

October 26, 2018

.

Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd Glen Allen, VA 23060-6711

SUBJECT:

RECEIPT AND AVAILABILITY OF THE SUBSEQUENT LICENSE RENEWAL APPLICATION FOR THE SURRY POWER STATION, UNIT NOS. 1 AND 2 (EPID NOS. L-2018-RNW-0023 AND L-2018-RNW-0024)

Dear Mr. Stoddard:

By letter dated October 16, 2018, (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML18291A842), Virginia Electric and Power Company (Dominion Energy Virginia) submitted an application for subsequent license renewal of Renewed Facility Operating License Nos. DPR-32 and DPR-37 for the Surry Power Station (SPS), Unit Nos. 1 and 2 to the U.S. Nuclear Regulatory Commission (NRC or staff). We are currently performing an acceptance review for docketing in accordance with the requirements of Title 10 of the Code of Federal Regulations Section 2.101(2) (10 CFR 2.101(2)), and will notify you of the results of our review. Should the NRC staff determine that the application is acceptable for docketing, the NRC staff will issue a schedule for the review, in accordance with 10 CFR 2.102(a).

We have enclosed for your information a copy of the notice relating to your application that is being sent to the Office of the Federal Register for publication.

I am pleased to announce the appointment of Mr. Emmanuel Sayoc as the project manager for the safety review, and Mr. Tam Tran as the project manager for the environmental review of your license renewal application. Please forward copies of all license renewal correspondence to Mr. Sayoc and Mr. Tran. Ms. Karen Cotton continues to remain responsible for the project management of all issues other than license renewal for Surry.

D. G. Stoddard If you have any questions on this matter, please contact Mr. Sayoc by telephone at 301-415-4084 or via e-mail at Emmanuel.Sayoc@nrc.gov, or Mr. Tran by telephone at 301-415-3617 or via e-mail at Tam.Tran@nrc.gov.

Sincerely,

/RA/

George A. Wilson Jr., Director Division of Materials and License Renewal Office of Nuclear Reactor Regulation Docket Nos: 50-280 and 50-281

Enclosure:

Federal Register Notice cc w/encl: Listserv

ML18297A093 (Package)

ML18297A045 (Letter)