Letter Sequence Other |
---|
EPID:L-2018-RNW-0024, Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement
Results
Other: ML18297A045, ML18319A184, ML18319A252, ML18340A266, ML18340A267, ML18345A244, ML18351A051, ML19015A243, ML19044A556, ML19044A659, ML19046A433, ML19098A810, ML19100A254, ML19106A416, ML19107A021, ML19128A079, ML19140A449, ML19157A113, ML19169A329, ML19198A059, ML19206A651, ML19267A042, NRC-2018-0247, Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent
|
MONTHYEARML18121A0342018-03-29029 March 2018 Possible Topics for the April 17, 2018 Public Meeting with Dominion on Its Surry SLRA Project stage: Request ML18102A5692018-04-17017 April 2018 Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) Project stage: Request ML18129A3142018-05-16016 May 2018 04/17/2018 Summary of Pre-Application Meeting with Dominion Energy Regarding the Surry, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML18291A8422018-06-30030 June 2018, 15 October 2018 Submittal of Application for Subsequent Renewed Operating Licenses Project stage: Request ML18291A8362018-06-30030 June 2018 Enclosure 4, Attachment 1: ANP-3679NP, Revision 0, Topical Report Project stage: Request ML18291A8352018-10-15015 October 2018 Submittal of Application for Subsequent Renewed Operating Licenses Project stage: Request ML18291A8342018-10-15015 October 2018 Appendix E - Environmental Report Project stage: Request ML18297A0452018-10-26026 October 2018 Receipt and Availability of the Subsequent License Renewal Application for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML18297A0932018-10-26026 October 2018 Receipt and Availability of the Subsequent License Renewal Application (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Request ML18319A2522018-11-16016 November 2018 Subsequent License Renewal Application Online Reference Portal (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML18319A1842018-11-26026 November 2018 Plan for the Operating Experience Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RWN-0023 and L-2018-RNW-0024 Project stage: Other ML18320A2362018-12-0303 December 2018 Acceptance Scheduling and Opportunity for Hearing Letter - v3 Project stage: Acceptance Review ML18320A2352018-12-0303 December 2018 Acceptance Scheduling and Opportunity for Hearing FRN - v2 Project stage: Request ML18345A2442018-12-12012 December 2018 Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent Lice Project stage: Other NRC-2018-0247, Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent2018-12-12012 December 2018 Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent Lice Project stage: Other ML18340A2672018-12-17017 December 2018 Federal Register Notice - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML18340A2652018-12-17017 December 2018, 21 December 2018 Notice of Intent to Prepare an Enviromental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML18351A0512018-12-18018 December 2018 Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent License Renewal Project stage: Other ML18351A2572018-12-20020 December 2018 U.S. Nuclear Regulatory Commission Approval of Virginia Electric and Power Company'S Request for Withholding Information from Public Disclosure, Regarding the Application for Subsequent License Renewal of Surry Power Station, Unit Nos. 1 an Project stage: Withholding Request Acceptance ML19046A0092018-12-20020 December 2018 Comment (10) from Bettina Rayfield on Surry Power Station, Unit Nos. 1 and 2 Relicensing Project stage: Request ML18340A2662018-12-21021 December 2018 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML19024A1992019-01-0808 January 2019 Subsequent License Renewal Scoping Meeting Surry Power Station Units 1 and 2 Project stage: Meeting ML19016A0932019-01-12012 January 2019 Comment (1) of Erica Gray on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1542019-01-13013 January 2019 Comment (9) of W. Frank Adams on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19016A0962019-01-14014 January 2019 Comment (3) of Kay Patrick on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19016A0942019-01-14014 January 2019 Comment (2) of Scott Burger on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19017A0132019-01-16016 January 2019 Comment (4) of Anonymous Individual on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Units 1 and 2 Project stage: Request ML19025A1462019-01-20020 January 2019 Comment (5) of David Martin on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1492019-01-21021 January 2019 Comment (6) of Glen Besa on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1522019-01-22022 January 2019 Comment (8) of Randal Owen on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1502019-01-22022 January 2019 Comment (7) of Scott Price on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19015A2432019-01-22022 January 2019 Plan for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML19042A1372019-01-29029 January 2019 Submittal of Supplement to Subsequent License Renewal Operating Licenses Application for Sufficiency Review Change Notice 1 Project stage: Supplement ML19044A5562019-03-0404 March 2019 License Renewal Environmental Site Audit Plan Regarding the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Other ML19046A4332019-03-0404 March 2019 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review (EPID: Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML19044A6592019-03-0404 March 2019 License Renewal Severe Accident Mitigation Alternatives Audit Plan Regarding the Surry Power Station, Unit Nos. 1 and 2, Subsequent License Renewal Application Project stage: Other ML19095A6662019-03-31031 March 2019, 2 April 2019 Submittal of Supplement to Subsequent License Renewal Application Change Notice 2 Project stage: Request ML19095A5972019-04-0202 April 2019 Submittal of Supplement to Subsequent License Renewal Application Change Notice 2 Project stage: Supplement ML19095A6022019-04-0202 April 2019 Enclosure 2 - SLRA Mark-Ups Change Notice 2 Project stage: Request ML19095A6002019-04-0202 April 2019 Enclosure 1 - Topics That Require a SLRA Supplement Project stage: Request ML19087A2662019-04-0303 April 2019, 30 April 2019 Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site Project stage: Request ML19106A3332019-04-0404 April 2019, 5 April 2019 Draft Environmental Rai'S for Surry Power Station Subsequent License Renewal Application Project stage: Request ML19114A4352019-04-11011 April 2019 RAIs 4-4-19 r3 Project stage: RAI ML19106A4022019-04-11011 April 2019 Request for Additional Information Set 1 - Surry SLRA Environmental Review Project stage: RAI ML19114A4232019-04-11011 April 2019 Final Environmental Rai'S for Surry Subsequent License Renewal Application Project stage: Request ML19107A0192019-04-16016 April 2019, 29 April 2019 Summary of the Subsequent License Renewal Environmental Audit Project stage: Request ML19107A0202019-04-16016 April 2019 Audit Need Update Tracking Spreadsheet Project stage: Request ML19098A8102019-04-17017 April 2019 On-Site Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML19106A4162019-04-25025 April 2019 Summary of the Subsequent License Renewal Severe Accident Mitigation Alternatives Audit Project stage: Other ML19127A2932019-04-29029 April 2019 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report Project stage: Request 2019-01-14
[Table View] |
Similar Documents at Surry |
---|
Category:Audit Plan
MONTHYEARML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML22255A1862022-10-0303 October 2022 Tornado Classification of the Fuel Handling Trolley Support Structure License Amendment Request Audit Plan ML22250A4672022-09-15015 September 2022 Turbine Building Wind Loading Basis Change Audit Plan ML22004A2872022-01-14014 January 2022 Technical Specification Section 3.4.A.4 Change of Post Loss-of-Coolant Accident Chemical Buffer Audit Plan ML20099F8732020-04-17017 April 2020 Audit Proposed License Amendment Request for the Addition of Westinghouse Topical Report WCAP-16996-P-A, Revision 1 (EPID L-2019-LLA-0243 and EPID L-2019-LLA-0236 ML19338C6902019-12-10010 December 2019 Audit Plan License Amendment Request for Small Break Loss of Coolant Accident Methodology (Epids L-2018-LLA-0195 and L-2018-LLA-0215) ML19220A5552019-08-13013 August 2019 Audit Proposed License Amendment Request for the Addition of 24-Hour Associated with the Technical Specification Completion Time for an Inoperable Reactor Trip (EPID-L-2019-LLA-0110) ML19098A8102019-04-17017 April 2019 On-Site Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) ML19044A5562019-03-0404 March 2019 License Renewal Environmental Site Audit Plan Regarding the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application ML19044A6592019-03-0404 March 2019 License Renewal Severe Accident Mitigation Alternatives Audit Plan Regarding the Surry Power Station, Unit Nos. 1 and 2, Subsequent License Renewal Application ML19015A2432019-01-22022 January 2019 Plan for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) ML18319A1842018-11-26026 November 2018 Plan for the Operating Experience Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RWN-0023 and L-2018-RNW-0024 ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML15153A1602015-06-15015 June 2015 Nuclear Regulatory Commission Plan for the Audit of Virginia Electric and Power Company'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1 - Flooding for Surry Power Station, Units 1 and 2 ML14343A1412014-12-11011 December 2014 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML14189A3202014-07-0808 July 2014 Plan to Audit the Regional Response Center Proof of Concept Demonstration with Surry Power Station Regarding Implementation of Phase 3 Related to Order EA-12-049 (Mitigating Strategies) 2024-03-21
[Table view] Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 2024-09-03
[Table view] |
Text
March 4, 2019 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, VA 23060
SUBJECT:
LICENSE RENEWAL SEVERE ACCIDENT MITIGATION ALTERNATIVES AUDIT PLAN REGARDING THE SURRY POWER STATION, UNIT NOS. 1 AND 2, SUBSEQUENT LICENSE RENEWAL APPLICATION (EPID NO. L-2018-RNW-0024)
Dear Mr. Stoddard:
The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing the Virginia Electric and Power Companys subsequent license renewal application for Surry Power Station, Unit Nos. 1 and 2 (Surry). The NRC staff plans to conduct an in-office audit of new and significant information related to the severe accident mitigation alternatives, beginning March 25, 2019, by teleconference and virtual portal. The audit activities will be conducted in accordance with the audit plan provided at Enclosure 1. The list of audit questions is provided at Enclosure 2.
If you have any questions, please contact me by e-mail at tam.tran@nrc.gov.
Sincerely,
/RA/
Tam Tran, Project Manager License Renewal Project Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281
Enclosures:
As stated cc w/encls: Listserv
ML19044A659 OFFICE PM:MRPB:DMLR LA:MRPB:DMLR* BC:MENB:DMLR PM:MRPB:DMLR NAME TTran SLent BBeasley TTran DATE 2/27/2019 2/14/2019 3/4/2019 3/4/2019
LICENSE RENEWAL AUDIT PLAN FOR NEW AND SIGNIFICANT INFORMATION RELATED TO THE SEVERE ACCIDENT MITIGATION ALTERNATIVES SURRY POWER STATION, UNITS 1 AND 2
1. Background
By letter dated October 15, 2018, Virginia Electric and Power Company (Dominion Energy or the applicant), submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) an application to renew the Surry Power Station, Unit Nos. 1 and 2 (Surry), renewed facility operating licenses DPR-32 and DPR-37. The staff is reviewing the information contained in the environmental report (ER) of the subsequent license renewal application (SLRA) per Title 10 of the Code of Federal Regulations Part 51 (10 CFR Part 51).
As part of the staffs review, a severe accident mitigation alternatives (SAMA) audit will be conducted for Surrys SLRA. This audit is conducted with the intent to gain understanding, to verify information, and to identify information that will require docketing to support the basis of the licensing or regulatory decision. Specifically, the NRC staff will identify pertinent SAMA information and data, and obtain clarifications regarding information provided in the ER.
Per NRC guidance, the NRC staff prepares a regulatory audit plan that provides a clear overview of audit activities and scope, team assignments, and schedule.
- 2. Audit Bases License renewal requirements are specified in 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants. Licensees are required by 10 CFR 54.23 to submit an ER that complies with the requirements in 10 CFR Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, as part of the LRA.
Review guidance for the staff is provided in NUREG-1555, Standard Review Plans for Environmental Reviews for Nuclear Power Plants: Supplement 1 - Operating License Renewal.
Section 51.53(c)(3)(ii)(L) of 10 CFR states that If the staff has not previously considered severe accident mitigation alternatives for the applicant's plant in an environmental impact statement or related supplement or in an environmental assessment, a consideration of alternatives to mitigate severe accidents must be provided. Surry provided a SAMA analysis in the 2001 ER for initial license renewal. The ER was reviewed by the NRC in 2003. Thus, the applicants ER must contain any new and significant information of which the applicant is aware (10 CFR 51.53(c)(iv)) and the NRC staff must consider whether such information affects prior generic environmental determinations, reflected in the Category 1 issues in Table B-1.
- 3. Audit Scope The scope of the SAMA audit is to review the new and significant evaluation as it relates to the SAMA analysis and results as documented in the Surry SLRA ER and supporting documents.
- 4. Information and Other Material Necessary for the Audit As described in the list of audit questions (Enclosure 2).
Enclosure 1
- 5. Team Assignments Name Responsibility J. Dozier Senior Reliability and Risk Analyst E. Dickson Physical Scientist T. Tran Project Manager
- 6. Logistics The regulatory audit will begin as an in-office audit (at NRC HQ using skype and/or Surry online reference portal (Agencywide Documents Access and Management Systems (ADAMS)
Accession No. ML18319A252)) on March 25, 2019. Discussions between NRC staff and Dominion Energy staff will be held regarding topics and questions identified in Enclosure 2, list of audit questions. Entrance and exit briefings will be held at the beginning and end of the in-office audit via conference calls. Status calls during the in-office audit will occur at least weekly, more often if deemed necessary. An exit for this audit will be scheduled at a mutually agreed time for NRC staff and Dominion Energy.
- 7. Special Requests The NRC staff requests the applicant to make available the license renewal application program basis documentation and other documents as requested for independent searches by the NRCs audit team via the electronic document portal.
- 8. Deliverables An audit summary report is scheduled to be issued by NRC staff within 90 days from the end of the audit.
LIST OF AUDIT QUESTIONS SURRY POWER STATION UNITS 1 AND 2 (SURRY)
SUBSEQUENT LICENSE RENEWAL APPLICATION REVIEW IN-OFFICE SEVERE ACCIDENT MITIGATION ALTERNATIVES (SAMA) AUDIT Specific questions to be discussed during the audit:
- 1. In the Environmental Report (ER), Dominion indicated that it is following the guidance in Nuclear Energy Institute (NEI) 17-04, Model SLR New and Significant Assessment Approach for SAMA, Revision 0, for providing SAMA new and significant information.
NEI 17-04 specifies, Further documentation of the new and significant information review is listed in Section 3.5.2. Furthermore NEI 17-04 indicates, Such documentation should be available to the NRC [U.S. Nuclear Regulatory Commission]
either in the SLR [Subsequent License Renewal] ER (at the SLR applicant's discretion),
or in supplemental information for review via E-document reading room, audit, and RAIs
[requests for additional information].
Specific additional documentation the staff needs to complete the review relating to SAMA new and significant information include:
- a. List of probabilistic risk assessment (PRA) revisions and the description of changes to the risk models since the 40-to-60-year license renewal application (LRA) (Include a discussion of the changes made at the plant that have reduced or increased risk).
- b. Description of current risk models (at a level of detail consistent with what was expected for the 40-to 60-year LRA).
- c. The comprehensive list and disposition of the Surry candidate SAMAs and industry SAMAs.
- d. The pre-screening criterion used to exclude any of the SAMA candidates from further consideration, including the rationale for any deviations from the screening criteria provided in NEI 17-04. Specifically, in Section E4.15.4.1 of the ER, Stage 1 Assessment: Step 1 - Identification and Qualitative Screening of SAMAs Dominion states:
The list of SAMAs collected was evaluated qualitatively to screen from further evaluation any that are not applicable to SPS [Surry Power Station], or that already have been implemented at SPS. In addition, two other screening criteria were applied to eliminate SAMAs that have excessive implementation costs.
First, SAMAs were screened from further consideration if they were found to reduce the SPS MB by greater than 50% in the initial SPS license renewal, but also found not to be cost effective due to high estimated costs of implementation in the initial license renewal process. Second, one SAMA (filtered containment vent) was screened due to its excessive implementation cost, because this plant modification has been evaluated by the nuclear industry and explicitly found to not be cost effective in Westinghouse large/dry containments.
Enclosure 2
Please be prepared to discuss the justification for using these 2 additional screening criteria.
- e. The most recent Probabilistic Safety Analysis (PSA) Peer Review and/or self-assessment reports for all hazards or a summary.
- f. Documentation associated with more recent Surry PSA review, if any.
- g. Any specific Surry references regarding Cost-Benefit Analysis, if available.
- h. NEI 17-04 Section 3.1 Data Collection specifies:
Use the latest risk models that are available for Internal events (including internal flooding) and for each of the external events contributors identified for evaluation in NEI 05-01 [Severe Accident Mitigation Alternatives (SAMA) Analysis Guidance Document, Revision A, November 2005].
NEI 05-01 specifies:
The IPEEE [Individual Plant Examination of External Events] identified the highest risk externally initiated accident sequences and potential means of reducing the risk posed by those sequences. Typically, the following external events were evaluated:
- 1. Internal fires
- 2. Seismic events
- 3. Other external events such as high wind events, external flooding, transportation and nearby facility accidents Explain how Other external events such as high wind events, external flooding, transportation and nearby facility accidents were considered in the Surry SAMA New and Significant Evaluation? Discuss recommendations to reduce risk due to each of these external events.
Therefore, if external events were included, the absolute value reduction in MB of some SAMAs would be larger; however, there is confidence that the methodology of percentage reduction in MB due to internal events results in a conservative analysis.
Please be prepared to discuss this further at the audit.
- 4. Was there any Surry or other facility external event SAMAs evaluated? If so, briefly describe. If not, indicate the reason why not.
- 5. NEI 17-04 Section 3.1 Data Collection specifies that information elements that should be collected and identified as new information
for the Stage 1 assessment include plant changes not yet incorporated into plant risk models. Are there any forthcoming model revisions and/or updated modeling techniques that may significantly impact the results of the SAMA evaluation?
- 6. Describe any Surry power uprates and impacts on risk at Surry.
What was the change in CDF and LERF as a result of any power uprate? Was the changes to CDF and LERF less than 30% as a result of power uprate?
- 7. As provided in the updated 2013 GEIS, peak fuel burnup was considered new information. What is the anticipated peak fuel burnup at Surry?
- 8. Did Dominion evaluate all of the items in the 2013 GEIS SAMA summary table (including low power, uncertainties, Beir VII)?
- 9. Page E-4-84 of the ER states:
As noted above [in the ER], the criterion established for new information being potentially significant is if the new information would cause the MB, as defined in Section 4.5 of NEI 05-01 [Rev. A] and calculated for any previously unimplemented, potentially cost beneficial SAMA for SPS to be reduced by a factor of two or more if the SAMA were implemented. If it can be shown that a particular SAMA would not reduce the core damage frequency (CDF) or any of the Level 2 release category frequencies in the model of record by more than a factor of two, then that particular SAMA could not reduce the MB by a factor of more than two. Therefore, that SAMA would not be considered evidence that new and potentially significant information exists, and would not be evaluated further in assessing the significance of new information. This criterion was applied to the SAMA screening evaluation presented in Section E4.15.4.
Please confirm this statement is equivalent to the NEI 17-04 criteria of demonstrating that SAMA implementation would not reduce the CDF or any of the Level 2 release category frequencies by 50 percent or more. The staff believes that it is the same. No discussion is needed if you confirm that it is the same.
- 10. TableE4.15-2 of the ER provides the Reduction in Maximum Benefit of Screened-In SAMAs. Please be prepared to discuss these results.
- 11. Section E4.15.4.3.3 of the ER provides the Economic Inputs for the MACCS codes. Please be prepared to discuss the values obtained specifically for decontamination costs.