Letter Sequence Other |
---|
EPID:L-2018-RNW-0023, Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) (Open) EPID:L-2018-RNW-0024, Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement
Results
Other: ML18297A045, ML18319A184, ML18319A252, ML18345A244, ML18351A051, ML19015A243, ML19046A433, ML19098A810, ML19100A254, ML19128A079, ML19169A329, ML19198A059, ML19248C228, ML19267A042, ML19270E741, NRC-2018-0247, Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent
|
MONTHYEARML18121A0342018-03-29029 March 2018 Possible Topics for the April 17, 2018 Public Meeting with Dominion on Its Surry SLRA Project stage: Request ML18102A5692018-04-17017 April 2018 Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) Project stage: Request ML18129A3142018-05-16016 May 2018 04/17/2018 Summary of Pre-Application Meeting with Dominion Energy Regarding the Surry, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML18291A8422018-06-30030 June 2018, 15 October 2018 Submittal of Application for Subsequent Renewed Operating Licenses Project stage: Request ML18291A8362018-06-30030 June 2018 Enclosure 4, Attachment 1: ANP-3679NP, Revision 0, Topical Report Project stage: Request ML18291A8352018-10-15015 October 2018 Submittal of Application for Subsequent Renewed Operating Licenses Project stage: Request ML18291A8342018-10-15015 October 2018 Appendix E - Environmental Report Project stage: Request ML18297A0452018-10-26026 October 2018 Receipt and Availability of the Subsequent License Renewal Application for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML18297A0932018-10-26026 October 2018 Receipt and Availability of the Subsequent License Renewal Application (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Request ML18319A2522018-11-16016 November 2018 Subsequent License Renewal Application Online Reference Portal (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML18319A1842018-11-26026 November 2018 Plan for the Operating Experience Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RWN-0023 and L-2018-RNW-0024 Project stage: Other ML18320A2362018-12-0303 December 2018 Acceptance Scheduling and Opportunity for Hearing Letter - v3 Project stage: Acceptance Review ML18320A2352018-12-0303 December 2018 Acceptance Scheduling and Opportunity for Hearing FRN - v2 Project stage: Request NRC-2018-0247, Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent2018-12-12012 December 2018 Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent Lice Project stage: Other ML18345A2442018-12-12012 December 2018 Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent Lice Project stage: Other ML18340A2672018-12-17017 December 2018 Federal Register Notice - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML18340A2652018-12-17017 December 2018, 21 December 2018 Notice of Intent to Prepare an Enviromental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML18351A0512018-12-18018 December 2018 Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent License Renewal Project stage: Other ML18351A2572018-12-20020 December 2018 U.S. Nuclear Regulatory Commission Approval of Virginia Electric and Power Company'S Request for Withholding Information from Public Disclosure, Regarding the Application for Subsequent License Renewal of Surry Power Station, Unit Nos. 1 an Project stage: Withholding Request Acceptance ML19046A0092018-12-20020 December 2018 Comment (10) from Bettina Rayfield on Surry Power Station, Unit Nos. 1 and 2 Relicensing Project stage: Request ML18340A2662018-12-21021 December 2018 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML19024A1992019-01-0808 January 2019 Subsequent License Renewal Scoping Meeting Surry Power Station Units 1 and 2 Project stage: Meeting ML19016A0932019-01-12012 January 2019 Comment (1) of Erica Gray on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1542019-01-13013 January 2019 Comment (9) of W. Frank Adams on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19016A0962019-01-14014 January 2019 Comment (3) of Kay Patrick on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19016A0942019-01-14014 January 2019 Comment (2) of Scott Burger on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19017A0132019-01-16016 January 2019 Comment (4) of Anonymous Individual on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Units 1 and 2 Project stage: Request ML19025A1462019-01-20020 January 2019 Comment (5) of David Martin on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1492019-01-21021 January 2019 Comment (6) of Glen Besa on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19015A2432019-01-22022 January 2019 Plan for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML19025A1522019-01-22022 January 2019 Comment (8) of Randal Owen on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1502019-01-22022 January 2019 Comment (7) of Scott Price on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19042A1372019-01-29029 January 2019 Submittal of Supplement to Subsequent License Renewal Operating Licenses Application for Sufficiency Review Change Notice 1 Project stage: Supplement ML19046A4332019-03-0404 March 2019 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review (EPID: Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML19044A5562019-03-0404 March 2019 License Renewal Environmental Site Audit Plan Regarding the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Other ML19044A6592019-03-0404 March 2019 License Renewal Severe Accident Mitigation Alternatives Audit Plan Regarding the Surry Power Station, Unit Nos. 1 and 2, Subsequent License Renewal Application Project stage: Other ML19095A6662019-03-31031 March 2019, 2 April 2019 Submittal of Supplement to Subsequent License Renewal Application Change Notice 2 Project stage: Request ML19095A5972019-04-0202 April 2019 Submittal of Supplement to Subsequent License Renewal Application Change Notice 2 Project stage: Supplement ML19095A6002019-04-0202 April 2019 Enclosure 1 - Topics That Require a SLRA Supplement Project stage: Request ML19095A6022019-04-0202 April 2019 Enclosure 2 - SLRA Mark-Ups Change Notice 2 Project stage: Request ML19087A2662019-04-0303 April 2019, 30 April 2019 Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site Project stage: Request ML19106A3332019-04-0404 April 2019, 5 April 2019 Draft Environmental Rai'S for Surry Power Station Subsequent License Renewal Application Project stage: Request ML19106A4022019-04-11011 April 2019 Request for Additional Information Set 1 - Surry SLRA Environmental Review Project stage: RAI ML19114A4232019-04-11011 April 2019 Final Environmental Rai'S for Surry Subsequent License Renewal Application Project stage: Request ML19114A4352019-04-11011 April 2019 RAIs 4-4-19 r3 Project stage: RAI ML19107A0192019-04-16016 April 2019, 29 April 2019 Summary of the Subsequent License Renewal Environmental Audit Project stage: Request ML19107A0202019-04-16016 April 2019 Audit Need Update Tracking Spreadsheet Project stage: Request ML19098A8102019-04-17017 April 2019 On-Site Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML19106A4162019-04-25025 April 2019 Summary of the Subsequent License Renewal Severe Accident Mitigation Alternatives Audit Project stage: Other ML19100A2542019-04-29029 April 2019 Schedule Revision for the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other 2019-01-14
[Table View] |
Similar Documents at Surry |
---|
Category:Audit Plan
MONTHYEARML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML22255A1862022-10-0303 October 2022 Tornado Classification of the Fuel Handling Trolley Support Structure License Amendment Request Audit Plan ML22250A4672022-09-15015 September 2022 Turbine Building Wind Loading Basis Change Audit Plan ML22004A2872022-01-14014 January 2022 Technical Specification Section 3.4.A.4 Change of Post Loss-of-Coolant Accident Chemical Buffer Audit Plan ML20099F8732020-04-17017 April 2020 Audit Proposed License Amendment Request for the Addition of Westinghouse Topical Report WCAP-16996-P-A, Revision 1 (EPID L-2019-LLA-0243 and EPID L-2019-LLA-0236 ML19338C6902019-12-10010 December 2019 Audit Plan License Amendment Request for Small Break Loss of Coolant Accident Methodology (Epids L-2018-LLA-0195 and L-2018-LLA-0215) ML19220A5552019-08-13013 August 2019 Audit Proposed License Amendment Request for the Addition of 24-Hour Associated with the Technical Specification Completion Time for an Inoperable Reactor Trip (EPID-L-2019-LLA-0110) ML19098A8102019-04-17017 April 2019 On-Site Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) ML19044A5562019-03-0404 March 2019 License Renewal Environmental Site Audit Plan Regarding the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application ML19044A6592019-03-0404 March 2019 License Renewal Severe Accident Mitigation Alternatives Audit Plan Regarding the Surry Power Station, Unit Nos. 1 and 2, Subsequent License Renewal Application ML19015A2432019-01-22022 January 2019 Plan for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) ML18319A1842018-11-26026 November 2018 Plan for the Operating Experience Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RWN-0023 and L-2018-RNW-0024 ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML15153A1602015-06-15015 June 2015 Nuclear Regulatory Commission Plan for the Audit of Virginia Electric and Power Company'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1 - Flooding for Surry Power Station, Units 1 and 2 ML14343A1412014-12-11011 December 2014 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML14189A3202014-07-0808 July 2014 Plan to Audit the Regional Response Center Proof of Concept Demonstration with Surry Power Station Regarding Implementation of Phase 3 Related to Order EA-12-049 (Mitigating Strategies) 2024-03-21
[Table view] Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 2024-09-03
[Table view] |
Text
.
January 22, 2019 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd Glen Allen, VA 23060-6711
SUBJECT:
SURRY POWER STATION, UNIT NOS. 1 AND 2, PLAN FOR THE IN-OFFICE REGULATORY AUDIT REGARDING THE SUBSEQUENT LICENSE RENEWAL APPLICATION REVIEW (EPID NOS. L-2018-RNW-0023 AND L-2018-RNW-0024)
Dear Mr. Stoddard,
By letter dated October 15, 2018, (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML18291A842), the Virginia Electric and Power Company (Dominion Energy Virginia or Dominion) submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) an application to renew the Renewed Facility Operating License Nos. DPR-32 and DPR-37 for the Surry Power Station, Unit Nos. 1 and 2 (SPS). Dominion requested renewal of the SPS operating licenses for an additional 20 years beyond the current renewed 60-year current license terms, which expire on May 25, 2032, for Unit 1 and January 29, 2033, for Unit 2. The staff is reviewing this application in accordance with the guidance in NUREG-2192, Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants.
The NRC plans to conduct an in-office regulatory audit at NRC headquarters offices from February 4 - March 1, 2019, in accordance with the enclosed regulatory audit plan. If you have any questions, please contact me at 301-415-4084 or by e-mail at Emmanuel.Sayoc@nrc.gov.
Sincerely,
/RA/
Emmanuel Sayoc, Project Manager License Renewal Project Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281
Enclosure:
- 1. Regulatory Audit Plan
- 2. Audit Schedule
ML19015A243
- Concurred via email OFFICE PM:MRPB:DMLR LA:MRPB:DMLR PM:MRPB:DMLR BC:MRPB:DLR NAME ESayoc* YEdmonds* AWu* EOesterle*
DATE 1/14/2019 1/17/2019 1/15/2019 1/16/2019 OFFICE PM:MRPB:DMLR NAME ESayoc*
DATE 1/22/2019
Audit Plan In-Office Regulatory Audit Surry Power Station, Units. 1 and 2 Subsequent License Renewal Application February 4 - March 1, 2019 Division of Materials and License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Enclosure
Audit Plan In-Office Regulatory Audit Surry Power Station, Units. 1 and 2 Subsequent License Renewal Application
- 1. Background By letter dated October 15, 2018, (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML18291A842), the Virginia Electric and Power Company (Dominion Energy Virginia or Dominion) submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) an application to renew the Renewed Facility Operating License Nos. DPR-32 and DPR-37 for the Surry Power Station, Units. 1 and 2 (SPS). Dominion requested renewal of the SPS operating licenses for an additional 20 years beyond the current renewed 60-year current license terms, which expire on May 25, 2032, for Unit 1 and January 29, 2033, for Unit 2. The staff is reviewing this application in accordance with the guidance in NUREG-2192, Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants.
In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR)
Part 54, the NRC will perform an in-office regulatory audit to gain a better understanding of (1)
Dominions methodology to identify the systems, structures, and components (SSCs) to be included within the scope of license renewal and subject to an aging management review (AMR), and (2) Dominions aging management programs (AMPs), AMR items, Time-Limited Aging Analyses (TLAAs) and associated bases and documentation as applicable.
- 2. Regulatory Audit Bases License renewal requirements are specified in 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants. Guidance is provided in NUREG-2192, Rev. 0, Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants (SRP-SLR), dated July 2017, and NUREG-2191, Rev. 0, Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, dated July 2017.
- 3. Regulatory Audit Scope Scoping and Screening Review The range of scoping and screening review of this regulatory audit is to review the applicants scoping and screening methodology used to identify SSCs within the scope of license renewal and subject to AMR. The review is performed to evaluate the scoping and screening process as documented in the license renewal application, implementing procedures, reports and drawings, such that the NRC staff:
- Obtains an understanding of the process used to identify the SSCs within the scope of license renewal and to identify the structures and components subject to an AMR.
- Has sufficient docketed information to allow the NRC staff to reach a conclusion on the adequacy of the scoping and screening methodology as documented and applied.
Enclosure 1
AMP, AMR, and TLAA Review The scope of the AMP, AMR, and TLAA review of this regulatory audit is to: (a) examine Dominions AMPs, AMR items, and TLAAs for SPS; (b) verify Dominions claims of consistency with the corresponding GALL-SLR Report AMPs, and AMR items, and (c) assess the adequacy of the TLAAs. Enhancements and exceptions will be evaluated on a case-by-case basis. The NRC staffs review of enhancements and exceptions will be documented in the safety evaluation report.
During this portion of the audit, the NRC staff will audit Program Elements 1 - 10 (scope, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, corrective actions for general recommendations such as compliance with Appendix B, confirmation process, administrative controls, and operating experience) of the applicants AMPs against the elements of the associated AMP described in the GALL-SLR Report. In addition, the NRC staff will verify that the conditions at the plant are bounded by the conditions for which the GALL-SLR Report program was evaluated.
The NRC staff will also examine the applicants program bases documents and related references for AMPs, AMR items, and TLAAs, and interview applicant representatives to obtain additional clarification. Walk downs, if necessary will be performed in a subsequent audit to be performed onsite.
The NRC staff will use risk insights to inform the prioritization of its review of documentation associated with AMPs, AMR items, and TLAAs. The NRC staff will use risk insights to focus the breadth and depth of its review of plant specific operating procedures and operating experience.
However, the NRC staffs review is not limited to risk-significant systems and components because 10 CFR Part 54 is a deterministic rule and the NRC staff must conclude that there is reasonable assurance that activities will continue to be conducted in accordance with the current licensing basis and the effects of aging will be managed during the period of extended operation for all structures and components within the scope of Part 54.
The NRC staff has reviewed the list of risk-significant systems and components provided by Dominion for setting priorities for application of their scoping and screening methodology.
- 4. Information and Other Material Necessary for the Regulatory Audit For the in-office audit February 4 - March 1, 2019, the project team will review the license renewal application, as supplemented and revised, the AMP basis documents and other Dominion supporting documents as appropriate and requested
- The project team would like continued Dominion document review capability via the document portal. Document requests for upload to the portal shall be made as needed via the NRC safety project manager to the appropriate Dominion licensing manager.
- The NRC staff would like to hold break-out sessions, via telephone conference calls and/or official internet-based desktop sharing means, with Dominion and Surry subject matter experts to discuss various basis documents, references, condition/corrective action reports, and to interview Dominion representatives to obtain additional clarification related to the license renewal review. Break-out sessions for various technical review areas will occur at predesignated time slots during the audit, with preassigned NRC and Dominion representatives, see general schedule provided in Enclosure 2. NRC staff will
provide discussion topics and technical requests and questions to the NRC safety project manager, who will then relay the information to the Dominion licensing manager at least a week before the break-out session. All break-out sessions will be coordinated via the NRC safety project manager and the Dominion licensing manager.
- 5. Team Assignments Team Member Assignment Alan Huynh Reviewer - Mechanical Alexander Chereskin Reviewer - Chemical Andrew Johnson Reviewer - Mechanical Angela Buford Reviewer - Structural Angela Wu Project Manager Austin Young Reviewer - Mechanical Bart Fu Reviewer - Mechanical Brian Allik Reviewer - Mechanical Bryce Lehman Reviewer - Structural Dan Hoang Reviewer - Structural Reviewer - Vessel David Dijamco Internals Reviewer - Scoping and David Nold Screening Demetrius Murray Reviewer - Electrical Duc Nguyen Reviewer - Electrical Emmanuel Sayoc Project Manager Ganesh Cheruvenki Reviewer - Mechanical George Thomas Reviewer - Structural George Wang Reviewer - Structural James Gavula Reviewer - Mechanical Reviewer - Vessel James Medoff Internals Juan Lopez Reviewer - Structural Keith Hoffman Reviewer - Mechanical Reviewer - Vessel Mark Yoo Internals Mo Sadollah Reviewer - Electrical Reviewer - Fire Naeem Iqbal Protection Robert Davis Reviewer - Mechanical
Team Assignments (continued)
Roger Kalikian Reviewer - Mechanical Sam Cuadrado Reviewer - Structural Seung Min Reviewer - Mechanical Sheila Ray Reviewer - Electrical Shie-Jeng Peng Reviewer - Scoping and Screening Stephen Cumblidge Reviewer - Mechanical William Gardner Reviewer - General Science William Gardner Reviewer - Mechanical William Holston Reviewer - Mechanical
- 6. Logistics The regulatory audit will be conducted as an in-office (at NRC HQ) audit from February 4, 2019, to March 1, 2019. Entrance and exit briefings will be held at the beginning and end of the in-office audit via conference calls. Status calls during the in-office (at NRC HQ) audit will occur at least weekly, more if deemed necessary.
- 7. Special Requests The NRC staff requests the applicant to make available the license renewal application program basis documentation and license renewal drawings, and other documents as requested for independent searches by the regulatory audit team via the portal.
- 8. Deliverables An audit report should be issued to Dominion within 90 days from the end of the audit.
In-Office Audit Schedule Enclosure 2