Correction to Summary of August 13, 2019 Category 2 Public Meeting Related to the Safety Review of the Surry Power Station Units 1 and 2 SLRA
ML19304C146
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/20/2019
From: Angela Wu
NRC/NRR/DNRL/NLRP
To: Eric Oesterle
NRC/NRR/DNRL/NLRP
Wu A, NRR-DNRL 415-2995
Shared Package
ML19304C145 List:
References
CAC 000951, EPID L-2018-RNW-0023, L-2018-RNW-0023/000951
Download: ML19304C146 (4)


Text

November 20, 2019 MEMORANDUM TO: Eric R. Oesterle, Chief License Renewal Projects Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation FROM: Angela Wu, Project Manager /RA/

License Renewal Projects Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation

SUBJECT:

CORRECTION TO

SUMMARY

OF AUGUST 13, 2019, CATEGORY 2 PUBLIC MEETING RELATED TO THE SAFETY REVIEW OF THE SURRY POWER STATION, UNITS 1 AND 2, SUBSEQUENT LICENSE RENEWAL APPLICATION By letter dated October 15, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18291A842), as supplemented by letters dated January 29, 2019 (ADAMS Accession No. ML19042A137), April 2, 2019 (ADAMS Accession No. ML19095A666),

June 10, 2019 (ADAMS Accession No. ML19168A028), October 14, 2019 (ADAMS Accession No. ML19294A044), and October 31, 2019 (ADAMS Accession No. ML19310E716), Virginia Electric and Power Company (Dominion Energy Virginia or Dominion) submitted to the U.S.

Nuclear Regulatory Commission (NRC or staff) an application to renew the Renewed Facility Operating License Nos. DPR-32 and DPR-37 for the Surry Power Station, Units 1 and 2 (SPS). Dominion submitted the application pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, for subsequent license renewal.

On September 24, 2019, the NRC issued a summary of the Category 2 public meeting held on August 13, 2019, related to the safety review of the SPS subsequent license renewal application (SLRA) (ADAMS Accession No. ML19262F338). This summary included two typographic errors, listed below.

CONTACT: Angela Wu, NRR/DNRL/NLRP 301-415-2995

E. Oesterle Error #1:

The cover of the meeting summary states the following:

By letter dated August 5, 2019 (ADAMS Accession No. ML19217A358), the U.S.

Nuclear Regulatory Commission (NRC) issued second round requests for additional information (RAIs), Set 3, to Dominion regarding the SPS subsequent license renewal application (SLRA). On August 13, 2019, the NRC staff held a public meeting to discuss technical matters of the second round RAIs of Set 3, and draft RAIs of Set 4.

Subsequently, on August 14, 2019 (ADAMS Accession No. ML19231A153), the U.S.

Nuclear Regulatory Commission (NRC) issued requests for additional information (RAIs), Set 4, to Dominion regarding the SPS subsequent license renewal application (SLRA). The public meeting agenda is available at ADAMS Accession No. ML19212A660.

With the corrected information in italicized, the paragraph should read:

By letter dated August 2, 2019 (ADAMS Accession No. ML19217A358), and August 5, 2019 (ADAMS Accession No. ML19304C206), the U.S. Nuclear Regulatory Commission (NRC) issued second round requests for additional information (RAIs), Set 3, to Dominion regarding the SPS subsequent license renewal application (SLRA). On August 13, 2019, the NRC staff held a public meeting to discuss technical matters of the second round RAIs of Set 3, and draft RAIs of Set 4. Subsequently, on August 14, 2019 (ADAMS Accession No. ML19231A153), the U.S. Nuclear Regulatory Commission (NRC) issued requests for additional information (RAIs), Set 4, to Dominion regarding the SPS subsequent license renewal application (SLRA). The public meeting agenda is available at ADAMS Accession No. ML19212A660.

Error #2:

In the enclosure of the meeting summary, Summary of Discussions, the table, Second Round RAIs, states the following:

Second Round RAIs RAI Outcome Set 3 RAI B2.1.28-7a, Internal Coatings Issued August 5, 2019 (Component Cooling Heat Exchangers)

Set 3 RAI B2.1.21-1, Selective Leaching Issued August 5, 2019 Set 3 B2.1.27-1a (Request 1) and B2.1.27-2a Issued August 5, 2019 (Request 2), Buried Components (Cementitious Piping Aging Management)

Draft Set 4 RAI B2.1.28-5a, Internal Coatings Issue RAI.

(Security Diesel Fuel Oil Tank Coatings)

Draft Set 4 RAI B2.1.34-1a, Structures Monitoring Issue RAI.

(Wood Pole Aging Management)

Draft Set 4 RAI B2.1.8-1a, Flow Accelerated Issue RAI.

Corrosion Draft Set 4 RAI B2.1.8-3a, Flow Accelerated Modify and issue RAI Corrosion

With the corrected information in italicized, the table should read:

Second Round RAIs RAI Outcome Set 3 RAI B2.1.28-7a, Internal Coatings Issued August 2, 2019 (Component Cooling Heat Exchangers)

Set 3 RAI B2.1.21-1, Selective Leaching Issued August 2, 2019 Set 3 B2.1.27-1a (Request 1) and B2.1.27-2a Issued August 2, 2019 (Request 2), Buried Components (Cementitious Piping Aging Management)

Draft Set 4 RAI B2.1.28-5a, Internal Coatings Issue RAI.

(Security Diesel Fuel Oil Tank Coatings)

Draft Set 4 RAI B2.1.34-1a, Structures Monitoring Issue RAI.

(Wood Pole Aging Management)

Draft Set 4 RAI B2.1.8-1a, Flow Accelerated Issue RAI.

Corrosion Draft Set 4 RAI B2.1.8-3a, Flow Accelerated Modify and issue RAI Corrosion Docket Nos: 50-280 and 50-281

ML19304C145 (Package)

ML19304C146 (Memo)

ML19304C206 (Email) *via e-mail OFFICE PM:NLRP:DNRL LA: NLRP:DNRL BC: NLRP:DNRL PM: NLRP:DNRL NAME AWu YEdmonds(ltr only) EOesterle AWu DATE 10/31/2019 11/7/2019 11/13/2019 11/20/2019