November 16, 2018 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd Glen Allen, VA 23060-6711

SUBJECT:

SURRY POWER STATION, UNIT NOS. 1 AND 2, SUBSEQUENT LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL (EPID NOS. L-2018-RNW-0023 AND L-2018-RNW-0024)

Dear Mr. Stoddard,

By letter dated October 15, 2018 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML18291A842), Virginia Electric and Power Company (Dominion Energy Virginia) submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) an application to renew the Renewed Facility Operating License Nos. DPR-32 and DPR-37 for the Surry Power Station (SPS), Unit Nos. 1 and 2.

The NRC staff continues to seek approaches to improve efficiency and support an effective review. One method to increase efficiency of the NRC staffs review of the subsequent license renewal application (SLRA) is the use of an online reference portal that will allow the NRC staff and associated contractors limited, read-only access to the documents and other reference materials cited in and in support of the SLRA. The online reference portal will allow the review of documents referenced in the SLRA. In cases where the NRC staff identifies documents as necessary to support its determination in the safety evaluation report, or its environmental impact statement, the NRC staff will request that those documents be submitted on the docket.

The use of the online reference portal will be in accordance with the following restrictions:

  • The online reference portal will be password-protected, and passwords will be distributed only to NRC staff members and contractors directly involved in the SPS SLRA review on a need-to-know basis.
  • The online reference portal will not support any printing, saving, or downloading functions.
  • The NRC staff members and contractors given password access to the online reference portal will be informed of the conditions related to the use of the online reference portal by NRC project managers.
  • The conditions associated with the online reference portal will be maintained throughout its use during the SPS SLRA review process.

D. Stoddard

  • Documents posted to the online reference portal will be limited to basis and other reference material cited in the SLRA, unless otherwise agreed upon by Dominion Energy Virginia and NRC management.
  • It is requested that the portal be fully populated with plant documents and well organized to facilitate efficient search capability and ease of use no later than 5 days after application acceptance for all NRC staff members and contractors directly involved in the SPS SLRA review, with the exception of Briana Grange, Tam Tran, and Michelle Moser who will need access to the portal no later than November 23, 2018.

If you have any questions on this matter, please contact Mr. Emmanuel Sayoc by telephone at 301-415-4084 or via e-mail at Emmanuel.Sayoc@nrc.gov.

Sincerely,

/RA/

Eric R. Oesterle, Chief License Renewal Projects Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281 cc: Listserv