Letter Sequence Request |
---|
EPID:L-2018-RNW-0023, Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) (Open) EPID:L-2018-RNW-0024, Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement
Results
Other: ML18297A045, ML18319A184, ML18319A252, ML18345A244, ML18351A051, ML19015A243, ML19046A433, ML19098A810, ML19100A254, ML19107A021, ML19128A079, ML19140A449, ML19169A329, ML19198A059, ML19248C228, ML19267A042, ML19270E741, NRC-2018-0247, Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent
|
MONTHYEARML18121A0342018-03-29029 March 2018 Possible Topics for the April 17, 2018 Public Meeting with Dominion on Its Surry SLRA Project stage: Request ML18102A5692018-04-17017 April 2018 Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) Project stage: Request ML18129A3142018-05-16016 May 2018 04/17/2018 Summary of Pre-Application Meeting with Dominion Energy Regarding the Surry, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML18291A8422018-06-30030 June 2018, 15 October 2018 Submittal of Application for Subsequent Renewed Operating Licenses Project stage: Request ML18291A8362018-06-30030 June 2018 Enclosure 4, Attachment 1: ANP-3679NP, Revision 0, Topical Report Project stage: Request ML18291A8352018-10-15015 October 2018 Submittal of Application for Subsequent Renewed Operating Licenses Project stage: Request ML18291A8342018-10-15015 October 2018 Appendix E - Environmental Report Project stage: Request ML18297A0452018-10-26026 October 2018 Receipt and Availability of the Subsequent License Renewal Application for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML18297A0932018-10-26026 October 2018 Receipt and Availability of the Subsequent License Renewal Application (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Request ML18319A2522018-11-16016 November 2018 Subsequent License Renewal Application Online Reference Portal (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML18319A1842018-11-26026 November 2018 Plan for the Operating Experience Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RWN-0023 and L-2018-RNW-0024 Project stage: Other ML18320A2362018-12-0303 December 2018 Acceptance Scheduling and Opportunity for Hearing Letter - v3 Project stage: Acceptance Review ML18320A2352018-12-0303 December 2018 Acceptance Scheduling and Opportunity for Hearing FRN - v2 Project stage: Request NRC-2018-0247, Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent2018-12-12012 December 2018 Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent Lice Project stage: Other ML18345A2442018-12-12012 December 2018 Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent Lice Project stage: Other ML18340A2652018-12-17017 December 2018, 21 December 2018 Notice of Intent to Prepare an Enviromental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML18340A2672018-12-17017 December 2018 Federal Register Notice - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML18351A0512018-12-18018 December 2018 Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent License Renewal Project stage: Other ML18351A2572018-12-20020 December 2018 U.S. Nuclear Regulatory Commission Approval of Virginia Electric and Power Company'S Request for Withholding Information from Public Disclosure, Regarding the Application for Subsequent License Renewal of Surry Power Station, Unit Nos. 1 an Project stage: Withholding Request Acceptance ML19046A0092018-12-20020 December 2018 Comment (10) from Bettina Rayfield on Surry Power Station, Unit Nos. 1 and 2 Relicensing Project stage: Request ML18340A2662018-12-21021 December 2018 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML19024A1992019-01-0808 January 2019 Subsequent License Renewal Scoping Meeting Surry Power Station Units 1 and 2 Project stage: Meeting ML19016A0932019-01-12012 January 2019 Comment (1) of Erica Gray on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1542019-01-13013 January 2019 Comment (9) of W. Frank Adams on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19016A0962019-01-14014 January 2019 Comment (3) of Kay Patrick on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19016A0942019-01-14014 January 2019 Comment (2) of Scott Burger on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19017A0132019-01-16016 January 2019 Comment (4) of Anonymous Individual on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Units 1 and 2 Project stage: Request ML19025A1462019-01-20020 January 2019 Comment (5) of David Martin on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1492019-01-21021 January 2019 Comment (6) of Glen Besa on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1502019-01-22022 January 2019 Comment (7) of Scott Price on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1522019-01-22022 January 2019 Comment (8) of Randal Owen on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19015A2432019-01-22022 January 2019 Plan for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML19042A1372019-01-29029 January 2019 Submittal of Supplement to Subsequent License Renewal Operating Licenses Application for Sufficiency Review Change Notice 1 Project stage: Supplement ML19046A4332019-03-0404 March 2019 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review (EPID: Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML19044A6592019-03-0404 March 2019 License Renewal Severe Accident Mitigation Alternatives Audit Plan Regarding the Surry Power Station, Unit Nos. 1 and 2, Subsequent License Renewal Application Project stage: Other ML19044A5562019-03-0404 March 2019 License Renewal Environmental Site Audit Plan Regarding the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Other ML19095A6662019-03-31031 March 2019, 2 April 2019 Submittal of Supplement to Subsequent License Renewal Application Change Notice 2 Project stage: Request ML19095A6022019-04-0202 April 2019 Enclosure 2 - SLRA Mark-Ups Change Notice 2 Project stage: Request ML19095A6002019-04-0202 April 2019 Enclosure 1 - Topics That Require a SLRA Supplement Project stage: Request ML19095A5972019-04-0202 April 2019 Submittal of Supplement to Subsequent License Renewal Application Change Notice 2 Project stage: Supplement ML19087A2662019-04-0303 April 2019, 30 April 2019 Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site Project stage: Request ML19106A3332019-04-0404 April 2019, 5 April 2019 Draft Environmental Rai'S for Surry Power Station Subsequent License Renewal Application Project stage: Request ML19114A4352019-04-11011 April 2019 RAIs 4-4-19 r3 Project stage: RAI ML19114A4232019-04-11011 April 2019 Final Environmental Rai'S for Surry Subsequent License Renewal Application Project stage: Request ML19106A4022019-04-11011 April 2019 Request for Additional Information Set 1 - Surry SLRA Environmental Review Project stage: RAI ML19107A0192019-04-16016 April 2019, 29 April 2019 Summary of the Subsequent License Renewal Environmental Audit Project stage: Request ML19107A0202019-04-16016 April 2019 Audit Need Update Tracking Spreadsheet Project stage: Request ML19098A8102019-04-17017 April 2019 On-Site Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML19106A4162019-04-25025 April 2019 Summary of the Subsequent License Renewal Severe Accident Mitigation Alternatives Audit Project stage: Other ML19100A2542019-04-29029 April 2019 Schedule Revision for the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other 2019-01-14
[Table View] |
Similar Documents at Surry |
---|
Category:Journal Article
MONTHYEARML19235A0802019-08-19019 August 2019 Thermo-Lag Website ML19235A0792019-08-19019 August 2019 Pyrocrete Website ML19235A0782019-08-19019 August 2019 Mineral Wool Website ML19235A0772019-08-19019 August 2019 Micarta Website ML19235A0762019-08-19019 August 2019 Marinite Website ML19235A0752019-08-19019 August 2019 Marinite Slide Plates Products - Piping Tech ML19235A0742019-08-19019 August 2019 Kbs Sealbags Website ML19235A0732019-08-19019 August 2019 Gypsum Website ML19235A0722019-08-19019 August 2019 Duxseal Website ML19235A0712019-08-19019 August 2019 Cerafiber Website ML19235A0702019-08-19019 August 2019 Cera Blanket Website ML19235A0692019-08-19019 August 2019 Bio K-10 Website ML19235A0682019-08-19019 August 2019 3M Interam Website ML19093B1121978-07-14014 July 1978 Response to Concerns Use of a Certain Type Cable Manufactured by the Continental Wire and Cable Company 2019-08-19
[Table view] Category:Report
MONTHYEARML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23103A2282023-04-12012 April 2023 Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML23054A1922023-02-22022 February 2023 ASME OM Code Inservice Testing Program Alternative Request V-01, Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Supplemental Information ML22353A6202022-12-19019 December 2022 Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code ML22263A3642022-05-23023 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 1 - 95 ML22263A3692022-05-0101 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 96-190 ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML20091L9852021-05-0404 May 2021 Record of Decision ML20091L9832021-05-0404 May 2021 SLR License ML21042B3212021-02-11011 February 2021 Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML20296A6802020-10-22022 October 2020 ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative S1-I5-ISL-05 and S2-15-ISL-06 ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML20076A5762020-05-28028 May 2020 Staff Assessment of Flood Hazard Focused Evaluation and Integrated Assessment ML19249B7722019-08-29029 August 2019 Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) ML19249B7682019-08-29029 August 2019 Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) ML19249B7742019-08-29029 August 2019 Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) ML19249B7782019-08-29029 August 2019 Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 ML19235A0702019-08-19019 August 2019 Cera Blanket Website ML19235A0802019-08-19019 August 2019 Thermo-Lag Website ML19235A0742019-08-19019 August 2019 Kbs Sealbags Website ML19235A0682019-08-19019 August 2019 3M Interam Website ML19235A0722019-08-19019 August 2019 Duxseal Website ML19235A0782019-08-19019 August 2019 Mineral Wool Website ML19235A0692019-08-19019 August 2019 Bio K-10 Website ML19235A0732019-08-19019 August 2019 Gypsum Website ML19235A0712019-08-19019 August 2019 Cerafiber Website ML19235A0752019-08-19019 August 2019 Marinite Slide Plates Products - Piping Tech ML19235A0762019-08-19019 August 2019 Marinite Website ML19235A0772019-08-19019 August 2019 Micarta Website ML19235A0792019-08-19019 August 2019 Pyrocrete Website ML19204A3582019-06-30030 June 2019 WCAP-18258-NP, Revision 1, Flaw Tolerance Evaluation for Susceptible Reactor Coolant Loop Cast Austenitic Stainless Steel Elbow Components for Surry Units 1 and 2. ML19163A1542019-06-0606 June 2019 SLRA - Attachment 4D Letter - Draft to Dominion ML19140A2762019-05-20020 May 2019 Essential Fish Habitat Mapper Results for Surry Power Station ML19095A6022019-04-0202 April 2019 Enclosure 2 - SLRA Mark-Ups Change Notice 2 ML19011A1722019-01-0404 January 2019 Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) ML19011A1732019-01-0404 January 2019 Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents ML19011A1742019-01-0404 January 2019 Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents ML18218A1712018-07-31031 July 2018 Attachment 5, ANP-3676NP, Revision 0, Surry Fuel-Vendor Independent Small Break LOCA Analysis, Licensing Report ML18108A1232018-04-11011 April 2018 Proposed Alternative Requests S1-15-ISl-04 and S2-15-ISl-04 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography in Accordance with 10 CFR 50.55a(z)(1) ML17325A7792017-11-22022 November 2017 Review of Steam Generator Tube Report for the Fall 2016 Inspections During Refueling Outage 27 (CAC No. MF9683; EPID L-2017-LRO-0009) ML17339A1752017-09-0707 September 2017 Structural Integrity Associates Report No. 1601007.401, September 2017, Flaw Tolerance Evaluation of the Hot Leg Surge Line Nozzles Using ASME Code Section XI, Appendix L. ML17241A0462017-08-24024 August 2017 Submittal of Cycle 28 Startup Physics Tests Report ML17251A9002017-06-0505 June 2017 Enclosure 2, Attachment E to 17-296, WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17 ML16355A1722016-12-20020 December 2016 Storm Surge Technical Evaluation Report Surry Power Station Hazard Reevaluation Review ML15335A0932015-12-15015 December 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation2.1 of the Near-Term Task Force Review ML15244B2052015-08-24024 August 2015 Virginia Electric and Power Company (Dominion) Surry Power Station Unit 1, Cycle 27 Startup Physics Tests Report ML15097A0782015-04-0707 April 2015 Soarca Surry 2005 Site File ML15072A2992015-03-16016 March 2015 Review of the Fall 2013 Steam Generator Tube Inservice Inspection Report Regarding Surry Power Station, Unit 1 Refueling Outage 25 ML15078A2882015-03-12012 March 2015 Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-115 Through 2-218 2023-05-31
[Table view] Category:Technical
MONTHYEARML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23103A2282023-04-12012 April 2023 Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML22263A3642022-05-23023 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 1 - 95 ML22263A3692022-05-0101 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 96-190 ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML21042B3212021-02-11011 February 2021 Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML20296A6802020-10-22022 October 2020 ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative S1-I5-ISL-05 and S2-15-ISL-06 ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML19249B7742019-08-29029 August 2019 Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) ML19249B7782019-08-29029 August 2019 Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 ML19249B7682019-08-29029 August 2019 Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) ML19249B7722019-08-29029 August 2019 Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) ML19235A0802019-08-19019 August 2019 Thermo-Lag Website ML19235A0682019-08-19019 August 2019 3M Interam Website ML19235A0692019-08-19019 August 2019 Bio K-10 Website ML19235A0702019-08-19019 August 2019 Cera Blanket Website ML19235A0792019-08-19019 August 2019 Pyrocrete Website ML19235A0712019-08-19019 August 2019 Cerafiber Website ML19235A0722019-08-19019 August 2019 Duxseal Website ML19235A0732019-08-19019 August 2019 Gypsum Website ML19235A0742019-08-19019 August 2019 Kbs Sealbags Website ML19235A0752019-08-19019 August 2019 Marinite Slide Plates Products - Piping Tech ML19235A0762019-08-19019 August 2019 Marinite Website ML19235A0772019-08-19019 August 2019 Micarta Website ML19235A0782019-08-19019 August 2019 Mineral Wool Website ML19204A3582019-06-30030 June 2019 WCAP-18258-NP, Revision 1, Flaw Tolerance Evaluation for Susceptible Reactor Coolant Loop Cast Austenitic Stainless Steel Elbow Components for Surry Units 1 and 2. ML19095A6022019-04-0202 April 2019 Enclosure 2 - SLRA Mark-Ups Change Notice 2 ML19011A1742019-01-0404 January 2019 Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents ML19011A1732019-01-0404 January 2019 Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents ML19011A1722019-01-0404 January 2019 Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) ML18218A1712018-07-31031 July 2018 Attachment 5, ANP-3676NP, Revision 0, Surry Fuel-Vendor Independent Small Break LOCA Analysis, Licensing Report ML17339A1752017-09-0707 September 2017 Structural Integrity Associates Report No. 1601007.401, September 2017, Flaw Tolerance Evaluation of the Hot Leg Surge Line Nozzles Using ASME Code Section XI, Appendix L. ML17241A0462017-08-24024 August 2017 Submittal of Cycle 28 Startup Physics Tests Report ML17251A9002017-06-0505 June 2017 Enclosure 2, Attachment E to 17-296, WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17 ML16355A1722016-12-20020 December 2016 Storm Surge Technical Evaluation Report Surry Power Station Hazard Reevaluation Review ML15244B2052015-08-24024 August 2015 Virginia Electric and Power Company (Dominion) Surry Power Station Unit 1, Cycle 27 Startup Physics Tests Report ML14086A1732014-04-0909 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14079A0182014-02-27027 February 2014 30-Day Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML14002A1452014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14043A4442014-02-12012 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Surry Power Station, Units 1 and 2, TAC Nos.: MF1002 and MF1003 (Revision 2) ML13179A0152013-05-31031 May 2013 Units I and 2, Qualification of the ABB-NV and Wlop CHF Correlations in the Dominion VIPRE-D Computer Code ML11215A0592011-06-30030 June 2011 WCAP-17345-NP, Rev 2, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (3-Loop Model 44F/ Model 51F), Attachment 5 to 11-403 ML1023904192010-08-31031 August 2010 DOM-NAF-2, Rev. 0.2-A, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code. ML1026002162010-05-13013 May 2010 Engineering Transmittal, ET-CEP-10-0006, Revision 0, Evaluation of Aluminum Conduit Seal Penetration Fire Tests, Dated May 13, 2010, North Anna and Surry Power Stations Units 1 and 2 (Redacted Version), Enclosure 2 ML0930701642009-10-15015 October 2009 Technical Report No. EE-0116, Revision 5 ML0926606162009-08-27027 August 2009 LTR-SGMP-09-108 NP-Attachment, Response to NRC Request for, Additional Information on H*; Model 44Fand Model 51F Steam Generators. ML0921504622009-06-30030 June 2009 WCAP-17092-NP, Revision 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 51F), Attachment 6 ML0921202022009-05-0606 May 2009 LTR-SGMP-09-64 Rev. 2 Np, Surry, Unit 1, Support for Emergency Technical Specification Amendment to Address Permeability Variation Signals at the Tube Ends. ML0826107152008-09-17017 September 2008 Final Precursor Analysis - Surry 2 (LER 281/06-002) ML0823200152008-08-18018 August 2008 Cycle 22 Startup Physics Tests Report 2023-05-31
[Table view] |
Text
KBS Sealbags Expanding pillows for penetration seals
KBS Sealbags Expanding pillows for penetration seals General Information KBS Sealbags are installed in cable penetration seals,
^OLYLMYLX\LU[YL[YV((PUNVMUL^JHISLZPZL_WLJ[LK
VY^OLYLK\Z[MYLLWLUL[YH[PVUZLHSZHYLYLX\LZ[LKLN
[LSLWOVULL_JOHUNLZWPSV[WSHU[ZJVTW\[LYYVVTZL[J
KBS SealbagsHYLWPSSV^ZJVUZPZ[PUNVM[PNO[S`^V]LU
K\YHISLIYLNSHZZJSV[OSSLK^P[OHJVTIPUH[PVUVMTP
ULYHSIYLZPUJVTI\Z[PISLJVTWVULU[Z^H[LYPUZVS\ISL
L_WHUZPVUHNLU[ZHUKZWLJPHSYLYL[HYKHU[HKKP[P]LZ
KBS SealbagsHYL[V[HSS`^H[LYHUK^LH[OLYYLZPZ[HU[
HUKYL[HPU[OLPYWYVWLY[PLZHUKLMMLJ[P]LULZZ\UKLYHSS
^LH[OLY[LTWLYH[\YLHUKH[TVZWOLYPJJVUKP[PVUZ
KBS SealbagsJVU[HPUUVHZILZ[VZVYHU`V[OLY[V_PJ
substances.
KBS SealbagsTHPU[HPU[OLPY]VS\TLJVUZ[HUJ`
,]LUTHU``LHYZVMPUK\Z[YPHS]PIYH[PVUZKVUV[PUK\JL
ZHNNPUNVM[OLIHNZ^OPJOYLZ\S[ZPUHUHIZVS\[LS`[PNO[
WLUL[YH[PVUZLHSVMJPHSYLWVY[MVY`LHYZ]PIYH[PVU[LZ[
H]HPSHISL
KBS Sealbags are dustproof for use in telephone L_JOHUNLZJVTW\[LYYVVTZL[J
KBS SealbagsOH]LHOPNOLSLJ[YPJYLZPZ[HUJLHUKHYL
UV[J\YYLU[JVUK\J[P]LPMRLW[PUKY`JVUKP[PVUZ
KBS SealbagsHYLLHZPS`PUZ[HSSLKHUKQ\Z[HZLHZPS`
YLTV]LKMVYYL[YV((PUN
KBS SealbagsHYL[LZ[LKPU[LYUH[PVUHSS`ZLLSPZ[VM
[LZ[YLWVY[ZHUKHWWYV]HSZ^P[OJTHUKJT
ZLHSPUN[OPJRULZZWYV]PKPUN\W[VOV\YZYLYLZPZ[HUJL
- OL`HYL-4HUK<3SPZ[LK
Special Features / Types How they react in fire: Used of KBS Sealbags:
- At approx. 130°C the various components of the KBS Sealbags are used to provide permanent or bags start gluing up and sticking together, preventing temporary fire stops for electrical cables. They are the fillers from running out, even if the wrapping is especially suited where frequent cable changes are damaged by mechanical impact. expected and are also ideally suited to provide fire protection during the construction phase of a project.
- At approx. 280°C the content begins to expand up to 45%, so that even the smallest remaining spaces KBS Sealbags are used as well for sealing small PVC between cables, trays and masonry are tightly closed. or steel pipes, ducts or cable conduits.
KBS Sealbags provide smoke gas-tight penetration seals where cold smoke from a distant fire will not pass through and in case of a nearby fire any gaseous extin-guishing agents (used in computer rooms etc.) will keep their extinguishing concentration.
KBS Sealbags are ideal for the protection of cables in double floors of processing centres.
KBS Sealbags may also be used to cover cables in trays against fire from sources such as welding.
KBS Sealbags come in various sizes so as to allow the sealing of even the smallest openings.
- At approx. 800°C a ceramic reaction causes the content to harden and form a solid block. The seal becomes mechanically so strong that it will withstand mechanical damage caused by falling debris etc. or a hose stream from fire fighters.
Available sizes Standard types Total weight Size in mm (approx.) Packaging in g (approx.) Length x width x height Number of Bags (not patted) per carton KBS Sealbag 250 250 340 x 180 x 13 20 KBS Sealbag 400 400 340 x 180 x 18 35 KBS Sealbag 720 720 340 x 180 x 35 20 KBS Sealbag 1500 1500 340 x 330 x 35 10
Installation Wall penetration KBS SealbagsZOV\SKILWH((LKI`OHUK
ZV[OH[[OLJVU[LU[PZKPZ[YPI\[LKL]LUS`ILMVYL
PUZLY[PUN[OLTPU[V[OLVWLUPUN
KBS Sealbags should be placed into the ope
UPUNI`Z[HNNLYPUN[OLQVPU[Z
<ZLHZTVV[O^VVKLUZ[PJR[VOLSWW\ZO:LHS
IHNZPUWSHJL
Floor and ceiling openings
(^PYLZJYLLUT\Z[ILPUZ[HSSLK[V[OL\UKLYZPKL
VM[OLVWLUPUN;OLZJYLLUZOV\SKILMHZ[LULK
[V[OLJLPSPUN\ZPUNZ[LLSKV^LSZHUK^HZOLYZ
7SHJLKBS SealbagsSLUN[O^PZLHUKÅH[VU[V
[OL^PYLTLZOSH`LYHM[LYSH`LY;OLSSPUNVM[PNO[
ZWHJLZPZHJJVTWSPZOLKHZKLZJYPILKHIV]L
0M^HSRPUNVU[OLÅVVYWLUL[YH[PVUZLHSILJVTLZ
ULJLZZHY`\ZLHU`Z\P[HISLJV]LY
-VYTVYLKL[HPSZZLLV\YPUZ[HSSH[PVUYLJVTTLU
dations in each carton.
- OLHIV]LKH[HWHY[PJ\SHYS`[OLYLJVTTLUKH[PVUZMVY[OLHWWSPJH[PVUHUK
\ZLVMV\YWYVK\J[ZHYLIHZLKVUV\YRUV^SLKNLHUKL_WLYPLUJL+\L
[VKPMMLYLU[TH[LYPHSZHUKJVUKP[PVUZVMHWWSPJH[PVU^OPJOHYLIL`VUKV\Y
JVU[YVS^LYLJVTTLUKPUHU`JHZL[VJHYY`V\[Z\MJPLU[[LZ[ZPUVYKLY[V
ensure that our products are suitable for the intended processes and appli
JH[PVUZ;OLYLMVYLHU`SPHIPSP[`MVYZ\JOYLJVTTLUKH[PVUZVYHU`VYHS
HK]PJLPZL_WYLZZS`L_JS\KLK\USLZZ^LOH]LHJ[LK^PSM\SS`VYI`
NYVZZULNSPNLUJL
Selection of International Test Results and Approvals Country Testing Ceiling Sealbag Size Hose- Official Fire Standard Ref. No.
Institute/ or Seal of stream Resistance Approval Wall Thickness Opening Test Rating Body Test (mm) (mm) (minutes)
Europe CSI wall 340 1200 x 800 not required up to EI 180 EN-1366-3 DC 02/017/F13 floor 340 1200 x 800 not required up to EI 180 EN-1366-3 AFITI wall 180 800 x 600 not required EI 120/E 180 EN-1366-3 7994/09-23 LICCF Belgium University of Gent floor 250 600 x 300 not required 130 NBN 713020 312 University of Lige wall a) 150 400 x 400 not required 90 NBN 713020 308 b) 330 400 x 400 90 wall B2) 150 400 x 400 not required 149 NBN 713020 310 wall C2) 330 400 x 300 149 wall 340 300 x 300 not required 180 NBN 713020 309 France C.S.T.B wall 340 500 x 300 not required 180 Arté 21.4.83 613 wall 180 450 x 250 120 630 Germany DIBt, Berlin wall 340 1500 x 1100 not required S90 DIN 4102 161 floor 340 800 x Italy CSI wall 340 600 x 500 not required REI 180 CM 91 1003 wall 190 300 x 400 not required REI 120 CM 91 1010 wall 340 400 x 300 not required REI 180 CM 91 1011 floor 340 300 x 200 not required REI 180 CM 91 1012 South Africa S.A.B.S wall 330 600 x 650 not required 120 SABS 0177: Part II 4005 Spain I.N.I.A. floor 240 460 x 300 not required 180 UNE 23.802 1201 floor 150 450 x 400 Sweden Statens Provnings- wall or 300 400 x 1000 not required EI90 SBN-PFS 818 anstalten SITAC floor 210 400 x 1000 EI120 1983-2 Switzerland VKF wall 340 1,3 m2 not required S90 DIN 4102 161 floor 0,6 m2 UK LPC (FIRTO) wall 340 505 x 510 not required 180 BS 476, Part 8 (72) 903 floor 180 500 x 500 not required 180 906 floor 1) 340 ø 100 passed F180 T180 UL 1479 912
- 2) 340 ø 180 passed F180 T151 ISO 834
- 3) 340 ø 120 passed F180 T180
- 4) 340 ø 120 passed F180 T180
- 5) 340 ø 280 passed F180 T180 wall 180 750 x 750 not required 248 BS 476, p. 20 913 USA UL floor (floor) 330 (13) 810 x 1020 passed F240 T240 UL 1479 2010 (a) (32x 40) ASTM E-814 (b) 330 (13) 810 x 1020 passed F180 T - rating (32x 40) depending on cable type FM floor (floor) 330 (13) 810 x 1020 passed T180 ASTM E-814 2011 (a) (32x 40)
(b) 330 (13) 810 x 1020 passed F180 T 120-180 (32x 40) depending on cable type All test reports on request.
BASF SE
3\K^PNZOHMLU.LYTHU`
- LS!
-H_!
[All products in the text marked with an are trademarks of the BASF Group.]
This document, or any answers or information provided herein by BASF, does not constitute a legally binding obligation of BASF. While the de-scriptions, designs, data and information contained herein are presented in good faith and believed to be accurate, it is provided for your guidance only. Because many factors may affect processing or application/use, we re-commend that you make tests to determine the suitability of a product for your particular purpose prior to use. It does not relieve our customers from the obligation to perform a full inspection of the products upon delivery or any other obligation. The claims and supporting data provided in this publi-cation have not been evaluated for compliance with any jurisdictions regu-latory requirements and the results reported may not be generally true un-der other conditions or in other matrices. Users must evaluate what claims and information are appropriate and comply with a jurisdictions regulatory requirements. NO WARRANTIES OF ANY KIND, EITHER EXPRESS OR IM-PLIED, INCLUDING WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, ARE MADE REGARDING PRODUCTS DESCRIBED OR DESIGNS, DATA OR INFORMATION SET FORTH, OR THAT THE PRODUCTS, DESIGNS, DATA OR INFORMATION MAY BE USED WITHOUT INFRINGING THE INTELLECTUAL PROPERTY RIGHTS OF OTHERS. IN NO CASE SHALL THE DESCRIPTIONS, INFORMATION, DATA OR DESIGNS PROVIDED BE CONSI-DERED A PART OF OUR TERMS AND CONDITIONS OF SALE.