Letter Sequence Other |
---|
EPID:L-2018-RNW-0024, Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement
Results
Other: ML18297A045, ML18319A184, ML18319A252, ML18340A266, ML18340A267, ML18345A244, ML18351A051, ML19015A243, ML19044A556, ML19044A659, ML19046A433, ML19098A810, ML19100A254, ML19106A416, ML19107A021, ML19128A079, ML19140A449, ML19157A113, ML19169A329, ML19198A059, ML19206A651, ML19267A042, NRC-2018-0247, Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent
|
MONTHYEARML18121A0342018-03-29029 March 2018 Possible Topics for the April 17, 2018 Public Meeting with Dominion on Its Surry SLRA Project stage: Request ML18102A5692018-04-17017 April 2018 Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) Project stage: Request ML18129A3142018-05-16016 May 2018 04/17/2018 Summary of Pre-Application Meeting with Dominion Energy Regarding the Surry, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML18291A8422018-06-30030 June 2018, 15 October 2018 Submittal of Application for Subsequent Renewed Operating Licenses Project stage: Request ML18291A8362018-06-30030 June 2018 Enclosure 4, Attachment 1: ANP-3679NP, Revision 0, Topical Report Project stage: Request ML18291A8352018-10-15015 October 2018 Submittal of Application for Subsequent Renewed Operating Licenses Project stage: Request ML18291A8342018-10-15015 October 2018 Appendix E - Environmental Report Project stage: Request ML18297A0452018-10-26026 October 2018 Receipt and Availability of the Subsequent License Renewal Application for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML18297A0932018-10-26026 October 2018 Receipt and Availability of the Subsequent License Renewal Application (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Request ML18319A2522018-11-16016 November 2018 Subsequent License Renewal Application Online Reference Portal (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML18319A1842018-11-26026 November 2018 Plan for the Operating Experience Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RWN-0023 and L-2018-RNW-0024 Project stage: Other ML18320A2362018-12-0303 December 2018 Acceptance Scheduling and Opportunity for Hearing Letter - v3 Project stage: Acceptance Review ML18320A2352018-12-0303 December 2018 Acceptance Scheduling and Opportunity for Hearing FRN - v2 Project stage: Request ML18345A2442018-12-12012 December 2018 Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent Lice Project stage: Other NRC-2018-0247, Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent2018-12-12012 December 2018 Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent Lice Project stage: Other ML18340A2672018-12-17017 December 2018 Federal Register Notice - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML18340A2652018-12-17017 December 2018, 21 December 2018 Notice of Intent to Prepare an Enviromental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML18351A0512018-12-18018 December 2018 Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent License Renewal Project stage: Other ML18351A2572018-12-20020 December 2018 U.S. Nuclear Regulatory Commission Approval of Virginia Electric and Power Company'S Request for Withholding Information from Public Disclosure, Regarding the Application for Subsequent License Renewal of Surry Power Station, Unit Nos. 1 an Project stage: Withholding Request Acceptance ML19046A0092018-12-20020 December 2018 Comment (10) from Bettina Rayfield on Surry Power Station, Unit Nos. 1 and 2 Relicensing Project stage: Request ML18340A2662018-12-21021 December 2018 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML19024A1992019-01-0808 January 2019 Subsequent License Renewal Scoping Meeting Surry Power Station Units 1 and 2 Project stage: Meeting ML19016A0932019-01-12012 January 2019 Comment (1) of Erica Gray on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1542019-01-13013 January 2019 Comment (9) of W. Frank Adams on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19016A0962019-01-14014 January 2019 Comment (3) of Kay Patrick on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19016A0942019-01-14014 January 2019 Comment (2) of Scott Burger on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19017A0132019-01-16016 January 2019 Comment (4) of Anonymous Individual on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Units 1 and 2 Project stage: Request ML19025A1462019-01-20020 January 2019 Comment (5) of David Martin on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1492019-01-21021 January 2019 Comment (6) of Glen Besa on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1522019-01-22022 January 2019 Comment (8) of Randal Owen on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1502019-01-22022 January 2019 Comment (7) of Scott Price on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19015A2432019-01-22022 January 2019 Plan for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML19042A1372019-01-29029 January 2019 Submittal of Supplement to Subsequent License Renewal Operating Licenses Application for Sufficiency Review Change Notice 1 Project stage: Supplement ML19044A5562019-03-0404 March 2019 License Renewal Environmental Site Audit Plan Regarding the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Other ML19046A4332019-03-0404 March 2019 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review (EPID: Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML19044A6592019-03-0404 March 2019 License Renewal Severe Accident Mitigation Alternatives Audit Plan Regarding the Surry Power Station, Unit Nos. 1 and 2, Subsequent License Renewal Application Project stage: Other ML19095A6662019-03-31031 March 2019, 2 April 2019 Submittal of Supplement to Subsequent License Renewal Application Change Notice 2 Project stage: Request ML19095A5972019-04-0202 April 2019 Submittal of Supplement to Subsequent License Renewal Application Change Notice 2 Project stage: Supplement ML19095A6022019-04-0202 April 2019 Enclosure 2 - SLRA Mark-Ups Change Notice 2 Project stage: Request ML19095A6002019-04-0202 April 2019 Enclosure 1 - Topics That Require a SLRA Supplement Project stage: Request ML19087A2662019-04-0303 April 2019, 30 April 2019 Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site Project stage: Request ML19106A3332019-04-0404 April 2019, 5 April 2019 Draft Environmental Rai'S for Surry Power Station Subsequent License Renewal Application Project stage: Request ML19114A4352019-04-11011 April 2019 RAIs 4-4-19 r3 Project stage: RAI ML19106A4022019-04-11011 April 2019 Request for Additional Information Set 1 - Surry SLRA Environmental Review Project stage: RAI ML19114A4232019-04-11011 April 2019 Final Environmental Rai'S for Surry Subsequent License Renewal Application Project stage: Request ML19107A0192019-04-16016 April 2019, 29 April 2019 Summary of the Subsequent License Renewal Environmental Audit Project stage: Request ML19107A0202019-04-16016 April 2019 Audit Need Update Tracking Spreadsheet Project stage: Request ML19098A8102019-04-17017 April 2019 On-Site Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML19106A4162019-04-25025 April 2019 Summary of the Subsequent License Renewal Severe Accident Mitigation Alternatives Audit Project stage: Other ML19127A2932019-04-29029 April 2019 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report Project stage: Request 2019-01-14
[Table View] |
Similar Documents at Surry |
---|
Category:Federal Register Notice
MONTHYEARML24114A3102024-05-0303 May 2024 Monthly (28-Day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 14, 2024 ML24086A4312024-04-0505 April 2024 Monthly (28-day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: April 16, 2024 ML24067A0372024-03-20020 March 2024 Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - February 2024 ML20091L9792021-05-0404 May 2021 Federal Register Notice ML20271A0002020-10-13013 October 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for September 2020 ML20099E4212020-04-21021 April 2020 Federal Register Notice for Part 73 Exemption ML20105A4652020-04-16016 April 2020 Virginia Electric and Power Company; Surry Power Station, Unit 2 - Federal Register Notice ML20071D3662020-04-0606 April 2020 Federal Register Notice - Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 ML19220A0652019-10-17017 October 2019 Federal Register Notice - Surry Power Station Unit Nos 1 and 2 Notice of Availability of Surry SLR Draft SEIS ML19168A0842019-06-26026 June 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 07/02/2019 ML18340A2672018-12-17017 December 2018 Federal Register Notice - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 ML18345A2442018-12-12012 December 2018 Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent Lice NRC-2018-0247, Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent2018-12-12012 December 2018 Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent Lice ML18320A2352018-12-0303 December 2018 Acceptance Scheduling and Opportunity for Hearing FRN - v2 ML18297A0942018-10-26026 October 2018 Federal Register Notice - Receipt and Availability of the Subsequent License Renewal Application for the Surry Power Station, Unit Nos 1 and 2 ML18278A2802018-10-10010 October 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 10/23/2018 ML18173A1792018-08-0707 August 2018 OEDO-17-00070 - Notice of Issuance of Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan C NRC-2018-0096, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 20182018-05-14014 May 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 2018 ML18127B7232018-05-14014 May 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 2018 ML17198A3292017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement Letter, Paul Gunter, Beyond Nuclear, Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Jap ML17200A0652017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement FRN, Paul Gunter, Beyond Nuclear, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and ML17213A1842017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 NRC-2017-0175, Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 20172017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 ML16271A0922016-09-28028 September 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: October 11, 2016 NRC-2016-0105, Federal Register Notice Correction Use of Areva'S M5 Alloy Fuel Rod Clodding Material2016-08-16016 August 2016 Federal Register Notice Correction Use of Areva'S M5 Alloy Fuel Rod Clodding Material ML16228A3192016-08-16016 August 2016 Federal Register Notice Correction Use of Areva'S M5 Alloy Fuel Rod Clodding Material ML16195A5252016-07-27027 July 2016 Exemption Notice for Fr - Surry Power Station, Unit Nos. 1 and 2, Use of M5 Advanced Zirconium Fuel Cladding ML16195A5162016-07-27027 July 2016 Exemption for Use of M5 Advanced Zirconium Fuel Cladding from the Requirements of 10 CFR Part 50, Section 50.46 ML16124B1542016-05-23023 May 2016 Draft Environmental Assessment Fr Notice ML15120A2272015-05-0101 May 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 12, 2015 ML14233A2082014-08-22022 August 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 2, 2014 NRC-2014-0193, Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 2, 20142014-08-22022 August 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 2, 2014 ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13205A2192013-07-24024 July 2013 Environmental Assessment and Finding of No Significant Impact ML13205A2232013-07-24024 July 2013 FRN - Environmental Assessment and Finding of No Significant Impact NRC-2013-0172, Units 1 and 2 - FRN - Environmental Assessment and Finding of No Significant Impact (TAC Nos. ME9753, ME9754, ME9755, and ME9756)2013-07-24024 July 2013 Units 1 and 2 - FRN - Environmental Assessment and Finding of No Significant Impact (TAC Nos. ME9753, ME9754, ME9755, and ME9756) ML12277A3732012-10-10010 October 2012 Federal Register Notice - Withdrawal of Amendment ML12277A3662012-10-10010 October 2012 Withdrawal of Amendment NRC-2012-0241, Units 1 and 2 - Federal Register Notice - Withdrawal of Amendment (TAC Nos. ME7814, ME7815, ME7816, and ME7817)2012-10-10010 October 2012 Units 1 and 2 - Federal Register Notice - Withdrawal of Amendment (TAC Nos. ME7814, ME7815, ME7816, and ME7817) ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML11264A0972011-10-24024 October 2011 Letter, Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed Nshcd, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI ML11264A0982011-10-19019 October 2011 Federal Register Notice - Notice of Consideration NRC-2011-0242, Federal Register Notice - Notice of Consideration2011-10-19019 October 2011 Federal Register Notice - Notice of Consideration NRC-2011-0230, FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations2011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations ML1126504892011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations NRC-2011-0185, Federal Register Notice, Exemption2011-09-13013 September 2011 Federal Register Notice, Exemption ML11235A8522011-09-13013 September 2011 Letter, Request for Exemption from Certain Requirements of 10 CFR 26.205(C) and (D) Work Hour Controls During Periods Immediately Prior and Subsequent to Severe Wind Conditions ML11235A8532011-09-13013 September 2011 Federal Register Notice, Exemption 2024-05-03
[Table view] |
Text
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-280 and 50-281; NRC-2018-0280]
Virginia Electric and Power Company; Dominion Energy Virginia:
Surry Power Station, Unit Nos. 1 and 2 AGENCY: Nuclear Regulatory Commission.
ACTION: Intent to conduct scoping process and prepare environmental impact statement; public meeting and request for comment.
SUMMARY
- The U.S. Nuclear Regulatory Commission will conduct a scoping process to gather information necessary to prepare an environmental impact statement (EIS) to evaluate the environmental impacts for the subsequent license renewal of the operating licenses for Surry Power Station, Unit Nos. 1 and 2 (Surry). The NRC is seeking stakeholder input on this action and has scheduled a public meeting.
DATES: Submit comments by January 22, 2019. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date.
ADDRESSES: You may submit comments by any of the following methods (unless this document describes a different method for submitting comments on a specific subject):
- Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2018-0280. Address questions about regulations.gov docket IDs to Krupskaya Castellon; telephone: 301-287-9221; e-mail:
Krupskaya.Castellon@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
- Mail comments to: May Ma, Office of Administration, Mail Stop TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
For additional direction on obtaining information and submitting comments, see Obtaining Information and Submitting Comments in the SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Tam Tran, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-3617, e-mail: tam.tran@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC-2018-0280 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document by any of the following methods:
- NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced. Dominion Energy Virginias application for 2
subsequent renewal of the Surry licenses can be found in ADAMS under Package Accession No. ML18291A842.
- NRCs PDR: You may examine and purchase copies of public documents at the NRCs PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments Please include Docket ID NRC-2018-0280 in the subject line of your comment submission in order to ensure that the NRC is able to make your comment submission available to the public in this docket.
The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at http://www.regulations.gov as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information.
If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment submissions into ADAMS.
II. Discussion By letter dated October 15, 2018 (ADAMS Package Accession No. ML18291A842), Dominion Energy Virginia submitted to the NRC an application for subsequent license renewal of Facility Operating License Nos. DPR-32 and DPR-37 for an additional 20 years of operation at Surry Power Station, Unit Nos. 1 and 2. The Surry 3
units are pressurized water reactors designed by Westinghouse and are located in Surry County, Virginia (17 miles NW of Newport News, VA). The current renewed operating license for Unit 1 expires at midnight on May 25, 2032, and the current renewed operating license for Unit 2 expires at midnight on January 29, 2033. The application for subsequent license renewal was submitted pursuant to part 54 of title 10 of the Code of Federal Regulations (10 CFR) and included an environmental report (ER). A notice of receipt and availability of the application was published in the Federal Register on November 1, 2018 (83 FR 54948). A notice of acceptance for docketing of the application and opportunity for hearing regarding subsequent license renewal of the facility operating license was published in the Federal Register on December 10, 2018 (83 FR 63541), corrected on December 17, 2018 (83 FR 64606), and is available in Regulations.gov by searching for docket ID NRC-2018-0247.
III. Request for Comments This notice informs the public of the NRCs intention to conduct scoping and prepare an EIS related to the subsequent license renewal application, and to provide the public an opportunity to participate in the environmental scoping process, as defined in 10 CFR 51.29.
The regulations in 36 CFR 800.8, Coordination with the National Environmental Policy Act, allow agencies to use their National Environmental Policy Act of 1969 (NEPA) process to fulfill the requirements of Section 106 of the National Historic Preservation Act (NHPA). Therefore, pursuant to 36 CFR 800.8(c), the NRC intends to use its process and documentation for the preparation of the EIS on the proposed action to comply with Section 106 of the NHPA in lieu of the procedures set forth at 36 CFR 800.3 through 800.6.
4
In accordance with 10 CFR 51.53(c) and 10 CFR 54.23, Dominion Energy Virginia submitted the ER as part of the subsequent license renewal application. The ER was prepared pursuant to 10 CFR part 51 and is publicly available in ADAMS under Accession No. ML18291A842. The ER may also be viewed on the Internet at https://www.nrc.gov/reactors/operating/licensing/renewal/subsequent-license-renewal.html. In addition, a paper copy of the SLR application including the ER are available for public review near the site at the Williamsburg Regional Library, 515 Scotland St., Williamsburg, VA 23185.
The NRC intends to gather the information necessary to prepare a plant-specific supplement to the NRCs Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants (NUREG-1437), related to the application for subsequent license renewal of the Surry operating licenses for an additional 20 years beyond the period specified in each of the current renewed licenses.
Possible alternatives to the proposed action include the no action alternative and reasonable alternative energy sources. The NRC is required by 10 CFR 51.95 to prepare a supplement to the GEIS in connection with the renewal of an operating license. This notice is being published in accordance with NEPA and the NRCs regulations found at 10 CFR part 51.
The NRC will first conduct scoping for the supplement to the GEIS and, as soon as practicable thereafter, will prepare a draft supplement to the GEIS for public comment. Participation in the scoping process by members of the public and local, State, Tribal, and Federal government agencies is encouraged. The scoping process for the supplement to the GEIS will be used to accomplish the following:
- a. Define the proposed action, which is to be the subject of the supplement to the GEIS; 5
- b. Determine the scope of the supplement to the GEIS and identify the significant issues to be analyzed in depth;
- c. Identify and eliminate from detailed study those issues that are peripheral or are not significant; or were covered by a prior environmental review;
- d. Identify any environmental assessments and other ElSs that are being or will be prepared that are related to, but are not part of, the scope of the supplement to the GEIS being considered;
- e. Identify other environmental review and consultation requirements related to the proposed action;
- f. Indicate the relationship between the timing of the preparation of the environmental analyses and the Commission's tentative planning and decision-making schedule;
- g. Identify any cooperating agencies and, as appropriate, allocate assignments for preparation and schedules for completing the supplement to the GEIS to the NRC and any cooperating agencies; and
- h. Describe how the supplement to the GEIS will be prepared, including any contractor assistance to be used.
The NRC invites the following entities to participate in scoping:
- a. The applicant, Dominion Energy Virginia;
- b. Any Federal agency that has jurisdiction by law or special expertise with respect to any environmental impact involved or that is authorized to develop and enforce relevant environmental standards;
- c. Affected State and local government agencies, including those authorized to develop and enforce relevant environmental standards;
- d. Any affected Indian tribe; 6
- e. Any person who requests or has requested an opportunity to participate in the scoping process; and
- f. Any person who has petitioned or intends to petition for leave to intervene under 10 CFR 2.309.
IV. Public Scoping Meeting In accordance with 10 CFR 51.26, the scoping process for an EIS may include a public scoping meeting to help identify significant issues related to a proposed activity and to determine the scope of issues to be addressed in an EIS. The NRC will hold a public meeting for the Surry subsequent license renewal supplement to the GEIS. The scoping meeting will be held on January 8, 2019. The meeting will be held from 6:00 p.m. to 8:00 p.m. at the Surry Administrators Office at the Surry Government Center, 45 School Street, Surry VA 23883. There will be an open house 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> before the meeting for members of the public to meet with NRC staff and sign in to speak at the meeting. Should the public scoping meeting of January 8, 2019, be canceled due to inclement weather, it will be rescheduled for the same hour and location on January 15, 2019.
The meeting will be transcribed and will include: 1) an overview by the NRC staff of the NEPA environmental and Safety review process, the proposed scope of the supplement to the GEIS, and the proposed review schedule; and 2) the opportunity for interested government agencies, organizations, and individuals to submit comments or suggestions on the environmental issues or the proposed scope of the Surry subsequent license renewal supplement to the GEIS. To be considered, comments must be provided either at the transcribed public meeting or in writing, as discussed in the ADDRESSES section of this notice.
7
Persons may register to attend or present oral comments at the meeting on the scope of the NEPA review by contacting the NRC Project Manager, Mr. Tam Tran, by telephone at 301-415-3617, or by e-mail at tam.tran@nrc.gov no later than January 3, 2019. Members of the public may also register to speak during the registration period prior to the start of the meeting. Individual oral comments may be limited by the time available, depending on the number of persons who register. Members of the public who have not registered may also have an opportunity to speak if time permits. Public comments will be considered in the scoping process for the Surry subsequent license renewal supplement to the GEIS. Please contact Mr. Tam Tran no later than January 3, 2019, if accommodations or special equipment is needed to attend or present information at the public meeting, so that the NRC staff can determine whether the request can be accommodated.
Participation in the scoping process for the Surry subsequent license renewal supplement to the GEIS does not entitle participants to become parties to the proceeding to which the supplement to the GEIS relates. Matters related to participation in any hearing are outside the scope of matters to be discussed at this public meeting.
Dated at Rockville, Maryland, this 17th day of December, 2018.
For the Nuclear Regulatory Commission
/RA/
Eric R. Oesterle, Chief, License Renewal Projects Branch, Division of Materials and License Renewal, Office of Nuclear Reactor Regulation.