From: Ring M
NRC/RGN-III/DRP/B1
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
Download: ML12249A446 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 4, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE ASSESSMENT LETTER - CLINTON POWER STATION, UNIT 1

Dear Mr. Pacilio:

On August 8, 2012, the NRC completed its mid-cycle performance review of Clinton Power Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012.

This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The assessment reflects the integration of the Security Cornerstone into Inspection Manual Chapter 0305, Operating Reactor Assessment Program.

The NRC determined the performance at Clinton, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2013.

Inspections planned include Post-Fukushima Temporary Instructions (TI) 2515/187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns, and TI 2515/188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. In addition, team inspections involving Inspection Procedure (IP) 71152B, Biennial Problem Identification and Resolution, and IP 71111.21, Component Desgin Basis Inspection, are scheduled in 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

M. Pacilio In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (630) 829-9703 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark Ring, Chief Branch 1 Division of Reactor Project Docket No. 50-461 License No. NPF-62

Enclosure:

Inspection Plan cc w/encl: Distribution via ListServ

M. Pacilio In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (630) 829-9703 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark Ring, Chief Branch 1 Division of Reactor Project Docket No. 50-461 License No. NPF-62

Enclosure:

Inspection Plan cc w/encl: Distribution via ListServ DISTRIBUTION:

See next page DOCUMENT NAME: Clinton MOC 2012 Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII RIII RIII NAME MRing:rj DATE 08/27/12 OFFICIAL RECORD COPY

Letter to M. Pacilio from M. Ring dated September 4, 2012

SUBJECT:

MID-CYCLE ASSESSMENT LETTER - CLINTON POWER STATION, UNIT 1 DISTRIBUTION:

Silas Kennedy RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Christine Lipa Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov

Page 1 of 2 Clinton Inspection / Activity Plan 09/01/2012 - 12/31/2013 Planned Dates No. of Staff Start End Inspection Activity Title on Site TI-187 - TI-187 FLOODING WALKDOWN 2 07/01/2012 12/31/2012 IP 2515/187 Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns TI-188 - TI-188 SEISMIC WALKDOWN 2 07/02/2012 12/31/2012 IP 2515/187 Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns BI EPR - EP ROUTINE INSPECTION / PI VERIFICATION 1 09/17/2012 09/21/2012 IP 7111402 Alert and Notification System Testing 09/17/2012 09/21/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 09/17/2012 09/21/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 09/17/2012 09/21/2012 IP 71151 Performance Indicator Verification BI OLRQ - REQUALIFICATION PROGRAM INSPECTION 1 09/24/2012 09/28/2012 IP 7111111A Licensed Operator Requalification Program - Annual Review TI-182 - TI-2515/182 PHASE I - BURIED PIPING 1 10/09/2012 10/11/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 10/22/2012 10/26/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 10/22/2012 10/26/2012 IP 71151-BI01 Reactor Coolant System Activity 10/22/2012 10/26/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness 10/22/2012 10/26/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 11/26/2012 11/30/2012 IP 71124.05 Radiation Monitoring Instrumentation STRIKE - STRIKE CONTINGENCY - SECURITY 2 01/28/2013 02/28/2013 IP 92709 Licensee Strike Contingency Plans TI INSP - TI 182 BURIED PIPING PHASE 2 1 02/11/2013 02/15/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping BI EPX - EP EXERCISE INSPECTION / PI VERIFICATION 2 03/25/2013 03/29/2013 IP 7111401 Exercise Evaluation 03/25/2013 03/29/2013 IP 71151 Performance Indicator Verification BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 03/11/2013 03/15/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 03/11/2013 03/15/2013 IP 71124.04 Occupational Dose Assessment BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 05/13/2013 05/17/2013 IP 71124.02 Occupational ALARA Planning and Controls

Page 2 of 2 Clinton Inspection / Activity Plan 09/01/2012 - 12/31/2013 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI PI&R - BIENNIAL PI&R INSPECTION 4 05/13/2013 05/31/2013 IP 71152B Problem Identification and Resolution BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 06/03/2013 06/07/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation BI OLRQ - BIENNIAL REQUAL PROGRAM INSPECTION 2 06/03/2013 06/07/2013 IP 7111111B Licensed Operator Requalification Program BI CDBI - COMPONENT DESIGN BASIS INSPECTION 6 09/23/2013 10/25/2013 IP 7111121 Component Design Bases Inspection OL PREP - CLINTON INIT PREP - 07/2013 3 07/29/2013 08/02/2013 W90283 OL - INITIAL EXAM - 2013 JUL-AUG - CLINTON OL EXAM - CLINTON INIT EXAM - 08/2013 3 08/19/2013 08/30/2013 W90283 OL - INITIAL EXAM - 2013 JUL-AUG - CLINTON ISFSI - ISFISI INSPECITON 1 09/01/2013 11/30/2013 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI 09/01/2013 11/30/2013 IP 60856.1 Review of 10 CFR 72.212(b) Evaluations at Operating Plants BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 09/16/2013 09/20/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 09/16/2013 09/20/2013 IP 71124.07 Radiological Environmental Monitoring Program 09/16/2013 09/20/2013 IP 71151-BI01 Reactor Coolant System Activity 09/16/2013 09/20/2013 IP 71151-OR01 Occupational Exposure Control Effectiveness 09/16/2013 09/20/2013 IP 71151-PR01 RETS/ODCM Radiological Effluent BI ISI - ISI BASELINE INSPECTION 1 12/02/2013 12/20/2013 IP 7111108G Inservice Inspection Activities - BWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 12/09/2013 12/13/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 12/09/2013 12/13/2013 IP 71124.02 Occupational ALARA Planning and Controls