UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 3, 2013 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR CLINTON POWER STATION (REPORT 05000461/2013006)

Dear Mr. Pacilio:

On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Clinton Power Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs assessment of your facility performance during this period and its plans for future inspections at your facility.

The NRC determined that the performance at Clinton Power Station during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014, including the non-baseline Inspection Procedures (IPs) associated with your plans to construct an Independent Spent Fuel Storage Installation, such as IP 60853, Onsite Fabrication of Components and Construction of an Independent Spent Fuel Storage Installation and IPs 60856/60856.1, Review of 10 CFR 72.212(b) Evaluations. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss any changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (630) 829-9703 with any questions you have regarding this letter.

Sincerely,

/RA/

Christine A. Lipa, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

Clinton Power Station Inspection Plan/Activity Plan cc w/encl: Distribuiton via ListServTM

Please contact me at (630) 829-9703 with any questions you have regarding this letter.

Sincerely,

/RA/

Christine A. Lipa, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

Clinton Power Station Inspection Plan/Activity Plan cc w/encl: Distribuiton via ListServTM DISTRIBUTION:

See next page DOCUMENT NAME: Clinton Power Station MOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-DRP E RIII-DRP RIII RIII NAME CLipa:r/mvtj DATE 09/03/13 OFFICIAL RECORD COPY

Letter to M. Pacilio from C. Lipa dated September 3, 2013

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR CLINTON POWER STATION (REPORT 05000461/2013006)

DISTRIBUTION:

Vivian Campbell RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov

Page 1 of 2 08/28/2013 10:32:45 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Clinton Inspection / Activity Plan 09/01/2013 - 12/31/2014 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

1 IP Radiation Monitoring Instrumentation 71124.05 09/16/2013 09/20/2013 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/07/2013 10/18/2013 1

IP Occupational ALARA Planning and Controls 71124.02 10/07/2013 10/18/2013 1

IP Reactor Coolant System Activity 71151-BI01 10/07/2013 10/18/2013 1

IP Occupational Exposure Control Effectiveness 71151-OR01 10/07/2013 10/18/2013 1

IP RETS/ODCM Radiological Effluent 71151-PR01 10/07/2013 10/18/2013 BI ISI

- ISI BASELINE INSPECTION 1

1 IP Inservice Inspection Activities - BWR 7111108G 10/07/2013 10/25/2013 BI FIRE

- FIRE PROTECTION INSPECTION AND BAG TRIP 5

1 IP Fire Protection [Triennial]

7111105T 01/13/2014 02/14/2014 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/03/2014 03/07/2014 1

IP Occupational Dose Assessment 71124.04 03/03/2014 03/07/2014 BI EPR

- EP ROUTINE INSPECTION / PI VERIFICATION 1

1 IP Alert and Notification System Testing 7111402 03/24/2014 03/28/2014 1

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/24/2014 03/28/2014 1

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/24/2014 03/28/2014 1

IP Performance Indicator Verification 71151 03/24/2014 03/28/2014 ISFSI

- ISFISI INSPECTION 1

1 IP On-Site Fabrication Of Components And Construction On An ISFSI 60853 05/01/2014 11/29/2014 1

IP Review of 10 CFR 72.212(b) Evaluations 60856 05/01/2014 11/29/2014 ISFSI

- REVIEW OF 10 CFR 72.212 EVALUATIONS 1

1 IP Review of 10 CFR 72.212(b) Evaluations at Operating Plants 60856.1 05/01/2014 11/30/2014 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

1 IP Radiation Monitoring Instrumentation 71124.05 04/14/2014 04/18/2014 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

1 IP Radiological Environmental Monitoring Program 71124.07 07/21/2014 07/25/2014 1

IP Performance Indicator Verification 71151 07/21/2014 07/25/2014 BI ENG

- TRIENNIAL HEAT SINK INSPECTION 1

1 IP Heat Sink Performance 7111107T 09/08/2014 09/12/2014 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/28/2013 10:32:45 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Clinton Inspection / Activity Plan 09/01/2013 - 12/31/2014 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/06/2014 10/10/2014 STRIKE

- STRIKE PREP - OPS/MAINT/RP/CLERKS 3

1 IP Licensee Strike Contingency Plans 92709 11/03/2014 12/16/2014 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.