UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 3, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

ANNUAL ASSESSMENT LETTER - CLINTON POWER STATION, UNIT 1 (05000461/2010001)

Dear Mr. Pardee:

On February 11, 2010, the NRC staff completed its performance review of Clinton Power Station, Unit 1. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information.

A separate letter designated and marked as "Official Use Only -- Security Information" will include the Security Cornerstone review and resultant inspection plan.

Overall, Clinton Power Station Unit 1 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

Additional inspections scheduled include: component design basis, triennial fire protection, and biennial problem identification and resolution. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.

C. Pardee In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

Clinton Inspection/Activity Plan cc w/encl: Distribution via ListServe

C. Pardee In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

Clinton Inspection/Activity Plan cc w/encl: Distribution via ListServe DOCUMENT NAME: G:\1-SECY\1-WORK IN PROGRESS\2009 EOC LETTERS\CLINTON 2009 EOC LETTER.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII RIII RIII NAME MRing:cms DATE 03/03/10 OFFICIAL RECORD COPY

Letter to C. Pardee from M. Ring dated March 3, 2010

SUBJECT:

ANNUAL ASSESSMENT LETTER - CLINTON POWER STATION, UNIT 1 (05000461/2010001)

DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak ROPreports Resource

Clinton Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 2 04/12/2010 04/16/2010 IP 7111402 Radiological Environmental Monitoring Program 04/12/2010 04/16/2010 IP 7111403 Emergency Response Organization Augmentation Testing 04/12/2010 04/16/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/12/2010 04/16/2010 IP 71151-EP01 Drill/Exercise Performance 04/12/2010 04/16/2010 IP 71151-EP02 ERO Drill Participation 04/12/2010 04/16/2010 IP 71151-EP03 Alert & Notification System BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 05/03/2010 05/07/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 05/03/2010 05/07/2010 IP 71124.02 Occupational ALARA Planning and Controls 05/03/2010 05/07/2010 IP 71151-BI01 Reactor Coolant System Activity 05/03/2010 05/07/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness 05/03/2010 05/07/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent BI ENG - COMPONENT DESIGN BASIS INSPECTION 5 05/24/2010 06/25/2010 IP 7111121 Component Design Bases Inspection BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 06/07/2010 06/11/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 06/07/2010 06/11/2010 IP 71124.07 Public Radiation Safety BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 09/20/2010 09/24/2010 IP 71124.05 Radiation Monitoring Instrumentation FY 2011 - CLINTON INITIAL PREP - 10/2010 2 10/18/2010 10/22/2018 W90257 OL - INITIAL EXAM - JULY 2010/MARCH 2011 - CLINTON OL EXAM - CLINTON INITIAL EXAM - 11/2010 2 11/01/2010 11/05/2010 W90257 OL - INITIAL EXAM - JULY 2010/MARCH 2011 - CLINTON STRIKE - STRIKE CONTINGENCY - OPS/MAINT/RP/CLERKS 2 11/16/2010 12/15/2010 IP 92709 Licensee Strike Contingency Plans BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 01/31/2011 02/04/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 01/31/2011 02/04/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 01/31/2011 02/04/2011 IP 71124.02 Occupational ALARA Planning and Controls BI ENG - TRIENNIAL FIRE PROTECTION INSPECTION 3 02/14/2011 03/18/2011 IP 7111105T Fire Protection [Triennial]

BI ENG - TRIENNIAL HEAT SINK INSPECTION 1 04/18/2011 04/22/2011 IP 7111107T Heat Sink Performance

Clinton Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 5/09/2011 05/13/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 5/09/2011 05/13/2011 IP 71124.04 Occupational Dose Assessment BI PI&R - BIENNIAL PI&R INSPECTION 3 5/16/2011 06/03/2011 IP 71152B Identification and Resolution of Problems