ML21333A083

From kanterella
Jump to navigation Jump to search
Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Teams), Inspection Report Report 05000461/202201
ML21333A083
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/29/2021
From: Jorge Corujo-Sandin
NRC/RGN-III/DRS/EB2
To: Rhoads D
Exelon Generation Co LLC, Exelon Nuclear
References
IR 2022010
Download: ML21333A083 (10)


See also: IR 05000461/2022001

Text

November 29, 2021

Mr. David Rhoades

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: CLINTON POWER STATION - REQUEST FOR INFORMATION FOR AN NRC

TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION (TEAM):

INSPECTION REPORT 05000461/2022010

Dear Mr. Rhoades:

On February 14, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial

baseline Design Bases Assurance Inspection (Team) at Clinton Power Station. This inspection

will be performed in accordance with NRC Baseline Inspection Procedure 71111.21M.

The Design Bases Assurance Inspection focuses on the design, maintenance, and operation of

risk significant components with low margin, or associated with an accident scenario, or a

specific system. The inspection also monitors the implementation of modifications to structures,

systems, and components as modifications to one system may also affect the design bases and

functioning of interfacing systems as well as introduce the potential for common cause failures.

The components and modifications to be reviewed during this baseline inspection will be

identified as part of the preparation for the inspection and finalized during the in-office

preparation week that occurs prior to the first onsite inspection week. In addition, operating

experience issues, associated with the component samples, will also be selected for review.

The inspection team may request scenarios to be performed on the simulator. This request

would require support from your simulator staff to validate scenarios, simulator time, and a crew

to perform the actions which would most likely occur during the second onsite week. The team

will work closely with your staff early on during the inspection process to ensure this activity can

be accomplished with minimal impact.

The inspection will include two weeks onsite. The inspection team will consist of six NRC

inspectors who will focus on engineering/maintenance/operations of the selected components

and modifications. The current inspection schedule is as follows:

Preparation week: February 7 - 11, 2022

Onsite weeks: February 14 - 18, 2022, and February 28 - March 4, 2022

Experience with previous baseline design/modification inspections of similar depth and length

has shown that this type of inspection is extremely resource intensive, both for the NRC

inspectors and the licensee staff. In order to minimize the inspection impact on the site and to

ensure a productive inspection for both parties, we have enclosed a request for information

needed for the inspection.

D. Rhoades -2-

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into four groups:

The first group lists information necessary for our initial inspection scoping

activities. This information should be provided to the lead inspector no later than

December 27, 2021. The lead inspector will communicate the initial selected set

of samples no later than January 7, 2022.

The second group of documents requested is those items needed to support our

in-office preparation activities. This set of documents should be provided to the

lead inspector no later than January 31, 2022. During the in-office preparation

activities, the team may identify additional information needed to support the

inspection.

The third group includes the additional information above as well as plant specific

reference material. This information should be available to the team onsite on

February 14, 2022.

The last group includes supporting information to be provided throughout the

inspection. Specifically, corrective action documents and questions developed

during the inspection are requested to be provided as the documents are

generated.

In addition, the enclosure includes information and requests addressing inspection logistics.

The lead inspector for this inspection is Jorge Corujo-Sandin. We understand that our licensing

contact for this inspection is Chelsie Miller of your organization. If there are any questions about

the inspection or the material requested in the enclosure, please contact the lead inspector at

630-829-9741 or via e-mail at Jorge.Corujo-Sandin@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

D. Rhoades -3-

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

Signed by Corujo-Sandin, Jorge

on 11/29/21

Jorge Corujo-Sandin

Senior Reactor Inspector

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-461

License No. NPF-62

Enclosure:

Design Bases Assurance Inspection

Document Request

cc: Distribution via LISTSERV

D. Rhoades -4-

Letter to David Rhoades from Jorge Corujo-Sandin dated November 29, 2021.

SUBJECT: CLINTON POWER STATION - REQUEST FOR INFORMATION FOR AN NRC

TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION (TEAM):

INSPECTION REPORT 05000461/2022010

DISTRIBUTION:

Jessie Quichocho

Robert Williams

RidsNrrDorlLpl3

RidsNrrPMClinton Resource

RidsNrrDroIrib Resource

John Giessner

Mohammed Shuaibi

Jamnes Cameron

Shelbie Lewman

Allan Barker

DRSIII

DRPIII

ADAMS Accession Number: ML21333A083

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

OFFICE RIII

NAME JCorujo-Sandin:mb

DATE 11/29/2021

OFFICIAL RECORD COPY

DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST

DESIGN BASES ASSURANCE INSPECTION (TEAMS)

REQUEST FOR INFORMATION

I. ADMINISTRATIVE INSPECTION INFORMATION

Inspection Report Number: 05000461/2022010

Onsite Inspection Dates: February 14 - 18, 2022; and February 28 - March 4, 2022

Inspection Procedure: IP 71111.21M, Design Bases Assurance Inspection (Team)

Jorge Corujo-Sandin, Senior Reactor Inspector, DRS

Lead Inspector: 630-829-9741

Jorge.Corujo-Sandin@nrc.gov

Elba Sanchez Santiago, Senior Reactor Inspector, RIII/DRS

Robert Daley, Senior Reactor Inspector, RIII/DRS

Teammates: Matthew Domke, Reactor Inspector, RIII/DRS

Ijaz Hafeez, Reactor Inspector, RIII/DRS

Michael Jones, Reactor Inspector, RIII/DRS

II. LOGISTICS

Email the following inspection logistics to the lead inspector by January 7, 2022, or

sooner:

1. Entrance meeting time and location.

2. Current management and engineering organizational chart.

3. Response team contact information (names and phone numbers) and team roles

(e.g., management sponsor, lead, inspector counterpart).

4. Any potential resource conflicts during the inspection (e.g., emergency drills and

all-staff meetings).

Due to the ongoing COVID-19 situation, additional logistics related with inspector

presence onsite will be coordinated closer to the actual start of the inspection. Reach

out to the Team Lead for questions or comments.

III. INFORMATION REQUEST

Contact the lead inspector as soon as possible if you have any questions regarding this

information request. Provide the information electronically in pdf files, Excel, or other

searchable formats, preferably via an electronic sharing service (CERTREC, ShareFile,

Box, etc.). Specific Excel formats for various Enclosure items may be requested to

assist in Inspection Sample Selection. If you do not have access to any of these

services or similar, we can provide you access to Box, which can be used to

upload/download and share documents. The files should contain descriptive names and

Enclosure

DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST

be indexed and hyperlinked to facilitate ease of use. Information in lists should contain

enough information to be easily understood by someone who has knowledge of light

water reactor technology.

1. Information Requested for Selection of Components/Modifications.

The following information is requested by December 27, 2021, or sooner, to facilitate

the initial sample selection.

Note: If you are unable to provide items 1.1. through 1.6.2. as requested, please

reach out to the Team Lead as soon as possible.

1.1. Risk-ranking of the top 500 components from your site-specific probabilistic

safety analysis (PSA) sorted by Birnbaum Worth. Include values for Risk

Achievement Worth, Risk-Reduction Worth, and Fussell-Veseley. Please

provide the ranking in an excel spreadsheet that contains the importance

measures and the description of the basic event (e.g., not just the basic event

designator).

1.2. Risk-ranking of the top 500 components (i.e., Large Early Release Frequency

(LERF)) from your site-specific PSA similar to the request in item 1.1. (Provide

in Excel format.)

1.3. Provide a list of the top 500 cut-sets from your PSA. Provide the descriptions

of the basic events in the list of cut-sets. (Provide in Excel format.)

1.4. Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that

contributes more than 5 percent to the baseline plant core damage frequency.

(Provide in Excel format.)

1.5. Copies of PSA system notebooks, Human Error Reliability Analysis Notebook,

Internal Flood scenario notebook and latest internal event PSA summary

document.

1.6. For Fire PSA Model:

1.6.1 Provide the fire PRA quantification notebook.

1.6.2 Provide importance measures ranked preferably by Birnbaum but if not

available by RAW for the top 500 basic events for the fire PRA.

(Provide in Excel format.)

1.7. Provide copies of the emergency operating procedures and abnormal operating

procedures.

1.8. Provide the in-service testing program (IST) document identifying the in-scope

valves and pumps, and the associated IST program requirements for each

component (e.g., IST valve table identifying category, active/passive function).

2

DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST

1.9. List of high-risk Maintenance Rule systems/components based on engineering

or expert panel judgment (i.e., those systems/components not identified high risk

in the PSA).

1.10. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1)

category for the last 3 years.

1.11. A list of operating experience evaluations for the last 3 years.

1.12. Information of any common cause failure of components experienced in the

last 5 years at your facility.

1.13. List of Root Cause Evaluations associated with component failures or design

issues initiated/completed in the last 5 years.

1.14. List of open operability evaluations.

1.15. List of permanent plant modifications to SSCs that are field work complete.

For the purpose of this inspection, permanent plant modifications include

permanent:

1.15.1 Plant changes, design changes, set point changes, completed in the last

5 years;

1.15.2 Equivalency evaluations, suitability analyses, and commercial grade

dedications completed in the last 3 years;

1.15.3 Procedure changes for Emergency Operating Procedures (EOPs),

Abnormal Operating Procedures (AOPs), surveillances, and test

procedures in the last 3 years; and

1.15.4 Calculation changes that have been issued for use in the last 3 years.

Note: Items 1.16.1. through 1.16.4. should be provided as separate, individual lists

and each list should contain the number of each document, title, revision/date, and

the affected system.

1.16. List of all time critical and/or risk significant operator actions. Identify those

actions that do not have job performance measures.

1.17. Copies of procedures addressing the following: modifications, design changes,

set point changes, equivalency evaluations or suitability analyses, commercial

grade dedications, and post-modification testing.

1.18. A list of corrective action documents (open and closed) in the last 3 years that

address permanent plant modifications issues, concerns, or processes. These

documents should also include the corrective action documents associated

with the modification implementation.

3

DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST

1.19. Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

1.20. Electronic copies of simplified plant drawings (if available). Note: these may

be uncontrolled documents such as big notes, training diagrams, etc.

2. Information Requested (for the approximate seven selected components and

seven selected modifications) to Be Available by January 31, 2022, (will be

reviewed by the team in the Regional office during the week of February 7,

2022).

This information should be separated for each selected component or modification,

especially if provided electronically (e.g., folder with component or modification name

that includes calculations, condition reports, maintenance history, etc.).

Items 2.1-2.16 are associated with the selected components and item 2.17 for the

selected modifications.

2.1. List of condition reports (corrective action documents) associated with each of

the selected components for the last 6 years.

2.2. The maintenance history (corrective, preventive, and elective) associated with

each of the selected components for the last 10 years. Identify frequency of

preventive maintenance activities.

2.3. Aging Management Program documents applicable to each selected

component.

2.4. Copies of calculations associated with each of the selected components,

excluding data files. [Pipe stress calculations excluded from this request].

2.5. Provide an all-inclusive list of calculation revisions in effect associated with

each of the selected components. Include document number, title, and revision

number.

2.6. Electronic copies of electrical drawings (ac and dc) and key diagrams.

2.7. Electronic copy of Piping and Instrumentation Drawings (P&IDs) (if available).

2.8. System Health Reports, System Descriptions, Design Basis Documents, and/or

Training Lesson Plans associated with each of the selected components.

2.9. A list of modifications, including equivalency evaluations and setpoint changes,

associated with each of the selected components. This list should include a

descriptive paragraph on the purpose of the modification. Please ensure this

list only includes design completed (not canceled) modifications.

2.10. Copies of operability evaluations (open/closed for last 3 years) associated with

each of the selected components and plans for restoring operability, if

applicable.

4

DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST

2.11. Copies of selected operator work-around evaluations associated with each of

the selected components and plans for resolution, if applicable.

2.12. Copies of any open temporary modifications associated with each of the

selected components, if applicable.

2.13. Trend data on the selected electrical/mechanical components performance for

last 3 years (For example, pumps performance including IST, other vibration

monitoring, oil sample results, etc., for valves: stroke time and leak rate results,

diagnostic trend data, etc.).

2.14. Provide copies of the normal and alarm response procedures associated with

the selected components and selected scenarios.

2.15. Procedures addressing time critical and/or risk significant operator actions.

2.16. Completed tests and surveillances for each selected component performed

during the last 3 years. For those tests and surveillances performed at a

periodicity of greater than 3 years, provide the latest two performed. Include

the associated acceptance criteria basis calculations.

2.17. For each of the selected modifications, copies of associated documents such

as modification package, engineering changes, 50.59 screening or evaluation,

calculations, post-modification test packages, corrective action documents,

design drawings, preventive maintenance requirements and procedures, etc.

2.18. Corrective Action Program procedures, including the operability/functionality

determination procedure.

2.19. Quality Assurance Program document/procedure.

2.20. A copy of any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

2.21. A copy of engineering/operations related audits completed in the last 2 years.

3. Additional Information to Be Provided on February 14, 2022, Onsite (for final

selected components and modifications).

3.1. During the in-office preparation activities, the team will be making final

selections and may identify additional information needed to support the

inspection.

3.2. Schedule of any testing/maintenance activities to be conducted on the selected

components during the two onsite inspection weeks.

4. Information Requested to be Provided Throughout the Inspection.

4.1. Any corrective action documents generated as a result of the teams questions

during this inspection as the documents are generated.

5

DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST

4.2. List of questions and/or document requests submitted by the team and their

status (e.g., open, closed) sorted by inspector. Provide daily by 1:30 p.m. CT

to each inspector. It is recommended to provide the team leader with a master

list sorted by inspector and each inspector with a list containing only the items

originated by that inspector.

4.3. If available in hardcopy form, one complete set of P&IDs and simplified

drawings (e.g., training schematics). If any of these documents is not available

in hardcopy form, contact the lead inspector.

4.4. Please ensure that other supporting documents for the selected items have been

located and are readily retrievable as the inspection team will likely be requesting

these documents during the inspection. Examples of supporting documents are:

4.4.1 Individual Plant Examination/Probabilistic Risk Assessment report;

4.4.2 Procurement documents for components and modifications

selected (verify retrievable);

4.4.3 Plant procedures (normal, abnormal, emergency, surveillance, etc.);

4.4.4 Vendor manuals;

4.4.5 Historical revisions of the Final Safety Analysis Report; and

4.4.6 Copy of electrical drawings, key diagrams and isometrics (paper

copies).

If you have questions regarding the information requested, please contact the lead inspector.

6