MONTHYEARIR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) ML24220A2772024-08-0707 August 2024 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000461/2025010 ML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000461/20230062024-02-28028 February 2024 Annual Assessment Letter for Clinton Power Station (Report 05000461/2023006) ML24054A7112024-02-23023 February 2024 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000461/2024011 ML24064A1222024-02-0606 February 2024 Biennial Problem and Identification Inspection Request for Information IR 05000461/20230052023-08-25025 August 2023 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2023005) IR 05000461/20220062023-03-0101 March 2023 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2022006) ML23005A0682023-01-0505 January 2023 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000461/2023010 ML22312A5362022-11-0808 November 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000461/2023401 IR 05000461/20220052022-08-22022 August 2022 Updated Inspection Plan for Clinton Power Station (Report 05000461/2022005) IR 05000461/20210062022-03-0202 March 2022 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2021006) ML21333A0832021-11-29029 November 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Teams), Inspection Report Report 05000461/202201 IR 05000461/20210052021-09-0101 September 2021 Updated Inspection Plan for Clinton Power Station; Report 05000461/2021005 ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21076A5112021-03-17017 March 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000461/2021013 ML21071A1882021-03-12012 March 2021 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Clinton Power Station IR 05000461/20200062021-03-0404 March 2021 Annual Assessment Letter for Clinton Power Station Unit 1 (Report 05000461/2020006) ML20329A0662020-11-24024 November 2020 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Baseline Inspection IR 05000461/20200052020-09-0101 September 2020 Updated Inspection Plan for Clinton Power Station, Unit 1 (Report 05000461/2020005) ML20183A1932020-06-30030 June 2020 Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report 05000461/2020010 IR 05000461/20190062020-03-0303 March 2020 Annual Assessment Letter for Clinton Power Station, (Report 05000461/2019006) IR 05000461/20190052019-08-28028 August 2019 Updated Inspection Plan for Clinton Power Station (Report 05000461/2019005 ML19136A1852019-05-15015 May 2019 Byron Station, Clinton Power Station, Dresden Nuclear Power Station, LaSalle County Station, and Quad Cities Nuclear Power Station-Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency IR 05000461/20180062019-03-0404 March 2019 Annual Assessment Letter for Clinton Power Station (Report 05000461/2018006) ML19037A4772019-02-0606 February 2019 Information Request to Support Upcoming Problem Identification and Resolution Inspect at Clinton Power Station ML19003A1912019-01-0303 January 2019 Request for Information for an NRC Triennial Baeline Design Bases Assurance Inspection; Inspection Report 05000461/2019011 IR 05000461/20180052018-08-28028 August 2018 Mid-Cycle Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2018005) ML18088A5662018-03-28028 March 2018 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Baseline Inspection 05000461/2018010 IR 05000461/20170062018-03-0202 March 2018 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2017006) ML17333A0782017-11-28028 November 2017 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2018002 IR 05000461/20170052017-08-28028 August 2017 Updated Inspection Plan for Clinton Power Station, Unit 1 and Quarterly Assessment Letter (Report 05000461/2017005) ML17146B2492017-03-31031 March 2017 Inspection Plan for Clinton Power Station for Triennial Fire Protection Baseline Inspection Report 2017 008 ML17076A3382017-03-16016 March 2017 Notification of NRC Baseline Inspection and Request for Information 05000461/2017002 IR 05000461/20160062017-03-0101 March 2017 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2016006) IR 05000461/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2016005) ML16098A3242016-04-0707 April 2016 Information Request to Support Upcoming Temporary Instruction 191 Inspection at Clinton Power Station ML16076A2542016-03-15015 March 2016 Ltr. 03/15/16 Clinton Power Station, Unit 1 - Request for Information for an NRC Triennial Baseline Component Design Bases Inspection; Inspection Report 05000461/2016009 (Jen) ML16076A2462016-03-15015 March 2016 Ltr. 03/15/16 Clinton Power Station - Notification of NRC Inspection and Request for Information (Vlm) IR 05000461/20150062016-03-0202 March 2016 Annual Assessment Letter for Clinton Power Station Unit 1 (Inspection Report 05000461/2015006) IR 05000461/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2015005) IR 05000461/20140012015-03-0404 March 2015 Annual Assessment Letter for Clinton Power Station, Unit 1, (Report 05000461/2014001) ML14245A2362014-09-0202 September 2014 Mid-Cycle Assessment Letter for Clinton Power Station, Unit 1 ML14177A3812014-06-25025 June 2014 Notification of NRC Supplemental Inspection (95001) and Request for Information IR 05000451/20130012014-03-0404 March 2014 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000451/2013001) ML13308B1302013-11-0101 November 2013 Ltr 11/1/13 Clinton Fire Protection Request for Information ML13246A2152013-09-0303 September 2013 2013 Clinton Power Station Mid-Cycle Letter Combined IR 05000461/20130082013-07-25025 July 2013 IR 05000461-13-008, May 20 - 24, 2013, June 3 - 7, 2013, and June 17 - 21, 2013, Clinton Power Station, Component Design Bases Inspection (CDBI) IR 05000461/20120012013-03-0404 March 2013 Annual Assessment Letter for Clinton Power Station (Report 05000461/2012001) ML13038A3122013-02-0707 February 2013 Request for Information for an NRC Triennial Baseline Component Design Bases Inspection Report 05000461-13-008 2024-08-07
[Table view] Category:Letter
MONTHYEARIR 05000461/20240032024-11-0505 November 2024 Integrated Inspection Report 05000461/2024003 IR 05000461/20244032024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024403 IR 05000461/20244022024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024402 ML24285A1482024-10-24024 October 2024 Ltr. to Joseph Rupnick, Chairman, Prairie Band Potawatomi Nation Re CPS Section 106 Consultation ML24285A1452024-10-24024 October 2024 Ltr. to Gail Cheatham, Kickapoo Tribe of Indians of the Kickapoo Reservation in Ks Re CPS Sect 106 Consult ML24285A1472024-10-24024 October 2024 Ltr. to Geoffrey M. Standing Bear, Principal Chief, Osage Nation Re CPS Section 106 Consultation ML24285A1422024-10-24024 October 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1442024-10-24024 October 2024 Ltr. to Estavio Elizondo, Sr., Chairman, Kickapoo Traditional Tribe of Texas Re CPS Section 106 Consultation ML24285A1462024-10-24024 October 2024 Ltr. to Gena Kakkak, Chairwoman, Menominee Indian Tribe of Wisconsin Re CPS Section 106 Consultation ML24283A1642024-10-23023 October 2024 Summary of the 2024 Environmental Audit Related to the Review of the License Renewal Application Environmental Report (EPID Number L-2024-LNE-0000)(Docket Number:50-461) ML24285A1412024-10-21021 October 2024 Ltr. to Craig Harper, Chief, Peoria Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1432024-10-21021 October 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma Re CPS Section 106 Consultation RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24215A2932024-09-27027 September 2024 Scoping Summary Letter 05000461/LER-2023-002-01, Reactor Core Isolation Cooling Inoperable Prior to Mode Change2024-09-24024 September 2024 Reactor Core Isolation Cooling Inoperable Prior to Mode Change ML24211A2302024-09-11011 September 2024 – Request for Partial Site Release for Facility Operating License No. NPF-62 RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) ML24222A3952024-08-23023 August 2024 Regulatory Audit Report to Support the Review of the Amendments to Revise Reactor Water Cleanup Valve Isolation Timing IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24220A2772024-08-0707 August 2024 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000461/2025010 ML24212A2212024-08-0202 August 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-LNE-0000) (Docket Number: 50-461) ML24157A3242024-07-11011 July 2024 Issuance of Amendment No. 254 Revision of Reactor Water Cleanup Isolation Valve Timing ML24158A0772024-07-0303 July 2024 Notice of Consideration of Approval of Partial Site Release, Public Meeting, and Request for Comments (EPID L-2023-LLA-0088) - Letter ML24163A3252024-06-28028 June 2024 Aging Management Regulatory Audit Plan ML24163A3242024-06-28028 June 2024 LRA - Portal Letter ML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes ML24290A0942024-05-21021 May 2024 Letter from Rachael Mangum (Achp) to Stephen Koenick (NRC) License Renewal Application for the Clinton Power Station Unit 1 Dewitt County, Il, Achp Project Number: 020924 IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20240012024-05-0707 May 2024 Integrated Inspection Report 05000461/2024001 ML24103A1032024-05-0101 May 2024 SHPO Consultation Letter for Clinton License Renewal ML24120A3442024-04-30030 April 2024 Ltr. to Gena Kakkak, Chairman, Menominee Indian Tribe of Wisconsin; Re., CPS Section 106 Consultation ML24120A3432024-04-30030 April 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma; Re., CPS Section 106 Consultation ML24103A0992024-04-30030 April 2024 Achp Scoping Letter for Clinton License Renewal ML24120A3462024-04-30030 April 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma; Re., CPS Section 106 Consultation ML24120A3452024-04-30030 April 2024 Ltr. to Lester Randell, Chairman, Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas; Re., CPS Section 106 Consultation ML24103A1152024-04-30030 April 2024 Ltr. to Geoffrey Standing Bear, Principal Chief, the Osage Nation; Re., CPS Section 106 Consultation RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24107B0312024-04-29029 April 2024 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24089A2222024-04-11011 April 2024 LRA - Acceptance and Opportunity for Hearing - Letter 2024-09-09
[Table view] |
Inspection Report - Clinton - 2020005 |
---|
|
|
Text
September 1, 2020
SUBJECT:
UPDATED INSPECTION PLAN FOR CLINTON POWER STATION, UNIT 1 (REPORT 05000461/2020005)
Dear Mr. Hanson:
The enclosed inspection plan lists the inspections scheduled through June 30, 2022, for Clinton Power Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the Reactor Oversight Process (ROP), including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the May 28, 2020 memo, Inspection Guidance During Transition From COVID-19 Mandatory Telework (ML20141L766). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:
https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling. The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these baseline inspections are being developed by the NRC staff. Anticipated baseline inspection dates are presented in the attached; however, the staff will confirm the schedule for these inspections with each utility separately.
Additionally, during this period the NRC will perform inspections per Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01). This includes sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ML19163A176), which included an option for relying on annunciation and operator manual actions instead of automatic protective features to isolate a power supply affected by an open phase condition. Licensees will be individually notified when the NRC schedules these inspections.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630-829-9628 with any questions you have regarding this letter.
Sincerely,
/RA/
Kenneth R. Riemer, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62 Enclosure(s):
Inspection Plan cc: Distribution via LISTSERV Letter to Bryan from Kenneth Riemer dated September 1, 2020.
SUBJECT: UPDATED INSPECTION PLAN FOR CLINTON POWER STATION, UNIT 1 (REPORT 05000461/2020005)
DISTRIBUTION :
Jessie Quichocho Elise Burket RidsNrrDorlLpl3 RidsNrrPMClinton Resource RidsNrrDroIrib Resource John Giessner Kenneth OBrien Jamnes Cameron Allan Barker DRSIII DRPIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML20244A301 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII NAME CPhillips:wc via KRiemer via email email DATE 8/21/2020 8/24/2020 OFFICIAL RECORD COPY
IP 22 Inspection Activity Plan Report Clinton 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count NRC Special Inspection 2 1 02/03/2020 07/30/2020 IP 93812 001345 Special Inspection Team Security Baseline Inspection 1 1 08/24/2020 10/16/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1 08/24/2020 12/31/2020 IP 71130.09 001656 Security Plan Changes 1 08/24/2020 10/15/2020 IP 71151 001338 Performance Indicator Verification Radiation Protection Baseline Inspection 1 1 09/14/2020 09/18/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation 1 09/14/2020 09/18/2020 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &
Transportation Triennial Fire Protection Inspection 3 1 09/21/2020 10/09/2020 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
Emergency Preparedness Baseline Inspection / Performance Indicator Verification 1 1 10/12/2020 10/16/2020 IP 71114.02 000717 Alert and Notification System Testing 1 10/12/2020 10/16/2020 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 10/12/2020 10/16/2020 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 10/12/2020 10/16/2020 IP 71151 001397 Performance Indicator Verification LIMITED SCOPE TACTICAL RESPONSE DRILLS - CLI 6 1 10/19/2020 10/23/2020 IP 92707 001711 Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Limited ISFSI Program Review Inspection 4Q2020 1 1 11/16/2020 11/20/2020 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants This report does not include INPO and OUTAGE activities. Page 1 of 5 This report shows only on-site and announced inspection procedures.
8/31/2020 1:18:12 PM
IP 22 Inspection Activity Plan Report Clinton 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Corporate Security Baseline Inspection 3 1 01/12/2021 01/14/2021 IP 71130.01 000733 Access Authorization Evaluations of Changes, Tests, and Experiments Inspection 3 1 02/01/2021 02/05/2021 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments RP Baseline Inspection 1 1 02/01/2021 02/05/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls Security Baseline Inspection 1 1 02/08/2021 02/12/2021 IP 71130.01 000733 Access Authorization 1 02/08/2021 02/12/2021 IP 71130.02 000734 Access Control 1 03/08/2021 03/12/2021 IP 71130.07 000739 Security Training 1 03/08/2021 03/12/2021 IP 71151 001338 Performance Indicator Verification Design Basis Assurance Inspection (Programs) 3 1 02/22/2021 03/12/2021 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements Clinton March 2021 Initial License Exam 5 1 02/28/2021 03/06/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1 03/28/2021 04/03/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
1 04/04/2021 04/10/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
Biennial Problem Identification and Resolution Inspection 4 1 05/03/2021 05/21/2021 IP 71152B 000747 Problem Identification and Resolution This report does not include INPO and OUTAGE activities. Page 2 of 5 This report shows only on-site and announced inspection procedures.
8/31/2020 1:18:12 PM
IP 22 Inspection Activity Plan Report Clinton 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count OPC Temporary Instruction 2515/194 1 1 05/24/2021 05/28/2021 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)
Radiation Protection Baseline Inspection 1 1 05/24/2021 05/28/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Security Baseline Inspection 3 1 08/02/2021 08/06/2021 IP 71130.05 000737 Protective Strategy Evaluation Inservice Inspection Clinton 1 1 09/20/2021 10/18/2021 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Security Baseline Inspection 1 1 10/01/2021 12/31/2021 IP 71130.09 001656 Security Plan Changes Radiation Protection Baseline Inspection 1 1 10/04/2021 10/08/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 10/04/2021 10/08/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls Clinton 2021 Biennial Licensed Operator Requal Program Inspection 2 1 11/01/2021 11/06/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Emergency Preparedness Exercise Inspection / Performance Indicator Verification 4 1 11/15/2021 11/19/2021 IP 71114.01 000716 Exercise Evaluation 1 11/15/2021 11/19/2021 IP 71151 001397 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 3 of 5 This report shows only on-site and announced inspection procedures.
8/31/2020 1:18:12 PM
IP 22 Inspection Activity Plan Report Clinton 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Clinton January 2022 Initial License Exam 4 1 12/12/2021 12/18/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1 01/16/2022 01/22/2022 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
1 01/23/2022 01/29/2022 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
Security Baseline Inspection 2 1 01/24/2022 01/28/2022 IP 71130.14 000743 Review of Power Reactor Target Sets Cyber Security Inspection 4 1 01/31/2022 02/18/2022 IP 71130.10P 000741 Cyber Security Radiation Protection Baseline 1 1 03/14/2022 03/18/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 03/14/2022 03/18/2022 IP 71124.04 000728 Occupational Dose Assessment Emergency Preparedness Baseline Inspection / Performance Indicator Verification 1 1 04/04/2022 04/08/2022 IP 71114.02 000717 Alert and Notification System Testing 1 04/04/2022 04/08/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 04/04/2022 04/08/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 04/04/2022 04/08/2022 IP 71151 001397 Performance Indicator Verification Design Bases Assurance Inspection - Team 6 1 04/18/2022 05/06/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
Design Bases Assurance Inspection - Program 3 1 04/18/2022 05/06/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements This report does not include INPO and OUTAGE activities. Page 4 of 5 This report shows only on-site and announced inspection procedures.
8/31/2020 1:18:12 PM
IP 22 Inspection Activity Plan Report Clinton 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Radiation Protection Baseline 1 1 06/20/2022 06/24/2022 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &
Transportation This report does not include INPO and OUTAGE activities. Page 5 of 5 This report shows only on-site and announced inspection procedures.