ML15068A350
ML15068A350 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 03/03/2015 |
From: | Navin P D Exelon Generation Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML15068A350 (12) | |
Text
Exelon Generation.
10CFR 50.55aMarch 3, 2015U. S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, DC 20555-0001 Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3Renewed Facility Operating License Nos. DPR-44 and DPR-56NRC Docket Nos. 50-277 and 50-278
Subject:
Submittal of the In-Service Inspection (ISI) Owner's Activity Report (OAR.for the 20th Refueling Outage for Unit 2 and Supplement to the 18Refueling Outage OAR for Unit 3Enclosed in Attachment 1 is the ISI Owner's Activity Report covering ISI activities associated with the second period of the current ISI inspection interval for Unit 2. Thisreport is submitted pursuant to the American Society of Mechanical Engineers (ASME)Boiler and Pressure Vessel Code,Section XI, "Rules for the Inservice Inspection ofNuclear Power Plant Components,"
Article IWA-6200, "Requirements" (2001 Editionthrough 2003 Addenda) and ASME Code Case N-532-4 (Repair/Replacement ActivityDocumentation Requirements and In-Service Summary Report Preparation andSubmission, section Xl, Division 1).In addition, a supplement to the flaw evaluation for the Unit 3 18 ' Refueling OutageOAR concerning a closure head weld is being provided in Attachment
- 2. This indication was originally discovered during the 13th Unit 3 Refueling Outage (3rd ISI inspection interval) and was re-inspected satisfactorily in the 18' Unit 3 Refueling Outage in 2011(4th ISI inspection interval).
A summary of the evaluation performed for this closure headindication is provided in Attachment 2.If you have any questions or require additional information, feel free to contact BrianRufo at 717-456-3250.
Sincerely Patrick D. NavinPlant ManagerPeach Bottom Atomic Power StationAttachments cc: US NRC, Administrator, Region IUS NRC, Senior Resident Inspector R. R. Janati, Commonwealth of Pennsylvania S. Gray, State of MarylandP. Steinhauer, PSE&G, Financial Controls and Co-owner Affairs 0CCN: 15-31 Attachment 1Peach Bottom Atomic Power Station Unit 2Owner's Activity Report for the 20th Refueling Outage PEACH BOTTOM ATOMIC POWER STATION, UNIT No. 2 -P2R20 OAR REPORTFORM OAR-1 OWNER'S ACTIVITY REPORTReport Number P2R20Plant Peach Bottom Atomic Power Station, 1848 Lay Road, Delta, PA 17314Unit No. 2Commercial Service Date July 5,1974Refueling Outage No. 20Current Inspection Interval ISI =Fourth / CISI = SecondCurrent Inspection Period ISI = Second / CISI = SecondEdition and Addenda of Section Xl Applicable to the inspection plans 2001 Edition throuqh 2003 AddendaDate and revision of inspection plan05/20/2014 Rev 3Edition & Addenda of Section Xl Applicable to repairs and replacements, if different than the inspection plan2001 Edition through 2003 AddendaCode Cases used: N-460, N-513-3, N-532-4.
N-578-1.
N-700 & N-702CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet theInspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities andevaluations supporting the completion of P2R20 confp m to the requirements of Section Xl.Signed Brian Rufo, ISI Program Owner 7Z / "Date 2/23/2015 Owner or Owner's Designy TitleCERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure VesselInspectors and the State or Province of Pennsylvania and employed by HSB Global Standards haveinspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with therequirements of Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied,concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither theInspector nor his employer shall be liable in any manner for any personal injury or property damage or a lossof ad arising from or c nected with this inspection.Commissions
/t/'Z ,5 , ,,,YI- l6sp Wor'sSinatre National Board, State, Province, and Endorsements Date =z_--,97 TABLE 1ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICEFOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO.2OCTOBER 19, 2012 TO DECEMBER 2, 2014(END OF P2R20 REFUEL OUTAGE)Examination ItemCateor Num Item Description Evaluation Description Category NumberRelevant Condition
-General visual examination of the containment identified minorE-A E1.11 Containment coating coating deterioration.
The conditions identified did not require repair per thecoatings program.
(Ref I R -2400490,
- 2400498, 2405719,
- 2405732, 2406120,2406122)Relevant Condition
-Hanger rod had mild abrasions due to rubbing against nearbyF-A F1.20 Hanger rod movement obstructed conduit.
Abrasions were superficial and did not impact support function.
(Ref IR2404923)HCl Relevant Condition
-Hanger identified as being misaligned.
Condition wasF-A F1.10 Hanger misaligned evaluated and it was determined that the hanger realigns due to thermal movementexperienced during start-up.
No additional actions required.
(Ref IR 2405922)
TABLE 2ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURESFOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2OCTOBER 19, 2012 TO DECEMBER 2, 2014(END OF P2R20 REFUEL OUTAGE)SYSTEM 01: MAIN STEAM AND TURBINE SYSTEM01/31/15, Page 1 of 7CodeClassClass 2Class 2Class 2Class 1Class 1Class 1Class 1Class 1Class 1Class 1Class 2Repair,Replacement, or Corrective MeasureRepairReplacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement RepairItem Description (component I.D.)HV-2-08A-43001 AHV-2-08A-43001 AHangers and SupportsRV-2-02-071 CRV-2-02-071 DRV-2-02-071 KRV-2-02-071 LRV-2-02-070A RV-2-02-070C RV-2-02-070B 1 DB-H182Description Of Work Performed Performed leak repair injection on bonnetInstalled new valveEPU -Install / Modify MS hangers/supports ECR12-00179 Installed a rebuilt safety relief valveInstalled a rebuilt safety relief valveInstalled a rebuilt safety relief valveInstalled a rebuilt safety relief valveInstalled a rebuilt safety relief valveInstalled a rebuilt safety relief valveInstalled a rebuilt safety relief valveRework/reweld spring can support 1DB-H182Flaw or RelevantCondition FoundDuring Scheduled Section XI ExamOr TestNoNoNoNoNoNoNoNoNoNoNoDateComplete2/2/201310/30/2014 11/23/2014 11/27/2014 11/27/2014 11/27/2014 11/27/2014 11/27/2014 11/27/2014 11/27/2014 11/30/2014 R&R Plan # and W/O #12-151, C024531412-153, C024531514-071, C024705114-084, R118167414-085, R125161414-087, R118167514-088, R118201314-089, R125361114-090, C025117614-230, C025474314-237, C0255118SYSTEM 03:CONTROL ROD DRIVERepair,Replacement, Code or Corrective Class MeasureItem Description (component I.D.)Flaw or RelevantCondition FoundDuring Scheduled Section XI ExamOr TestNoDescription Of Work Performed Exchanged CRD's with rebuilt CRD'sDateComplete R&R Plan # and W/O #11/27/2014 14-018, R1251765Class 1 Replacement CRD's 02-39,10-11, 10-15,10-23,10-31, 14-31, 18-19,22-23, 22-59, 26-07, 26-31,34-55, 38-03, 38-55, 42-35,46-19, 46-27, 46-39, 50-35 TABLE 2ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURESFOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2OCTOBER 19, 2012 TO DECEMBER 2, 2014(END OF P2R20 REFUEL OUTAGE)SYSTEM 04: REACTOR PRESSURE VESSEL & INTERNALS 01/31/15, Page 2 of 7CodeClassClass 1Repair,Replacement, or Corrective MeasureReplacement Item Description (component I.D.) Description Of Work Performed N6B Flange 20S001 Rx Vessel Replace N6B Flange Rx Vessel 20S001 per EOR 13-00046Flaw or RelevantCondition FoundDuring Scheduled Section XI ExamOr TestNoDateComplete11/27/2014 R&R Plan # and W/O #14-174, C0251472SYSTEM 06: FEEDWATER Repair,Replacement, Code or Corrective Class MeasureClass 1Class 2Class 2Class 2Class 1Replacement Replacement Replacement Replacement Replacement Item Description (component I.D.)OHK-2-06-96A MO-2-06D-2163A MO-2-06D-2163B MO-2-06D-21630 CHK-2-06-28A Description Of Work Performed Flaw or RelevantCondition FoundDuring Scheduled Section Xl ExamOr TestNoNoNoNoNoPerformed bonnet modification
-welded to boltedEPU -install new 2AS018 RFPT, reinstall MO-2-06D-2163A EPU -install new 2BS018 RFPT, reinstall MO-2-06D-21638 EPU -install new 2CS018 RFPT, reinstall MO-2-06D-2163C Performed bonnet modification
-welded to boltedDateComplete11/16/2014 11/18/2014 11/16/2014 11/18/2014 11/27/2014 R&R Plan # and W/O #14-045,14-180,14-181,14-182,14-221,R1120518C0252423C0252426C0252430R1245318SYSTEM 07: PRIMARY CONTAINMENT Repair,Replacement, Code or Corrective Class MeasureFlaw or RelevantCondition FoundDuring Scheduled Section XI ExamOr TestItem Description (component I.D.)DateComplete R&R Plan # and W/O #Description Of Work Performed Installed new stud on Suppression Chamber HatchClass M Replacement N-200BNo 11/26/2014 14-043, R1246916 TABLE 2ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURESFOR PEACH BOT7OM ATOMIC POWER STATION, UNIT NO. 2OCTOBER 19, 2012 TO DECEMBER 2, 2014(END OF P2R20 REFUEL OUTAGE)01/31/15, Page 3 of 7SYSTEM 10: RESIDUAL HEAT REMOVALRepair,Replacement, Code or Corrective Class MeasureClass 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Item Description (component I.D.)MO-2-10-026B RV-2-10-181 CPB-2-10-2BE024 PB-2-10-2AE024 RHR Crosstie A/C LinesRHR Crosstie A/C LinesRHR Crosstie "A" LineRHR Crosstie "C" LineRHR Crosstie "A" Line10-GB-H-46 10-GB-H582 10-GA-H583 1 0-GA-S-606 10-GB-H584 1 0-GB-S-589 10-GB-H585 10-GB-H53 Weld 10-2XA020-15
& 16Weld 10-2XC020-11
& 12Weld 10-2DA20-19 Weld 10-2DA20-20 Weld 10-2DA20-26 Weld 10-2DA20-27 Weld 10-2DA20-28 Weld 10-2DC20-16 Weld 10-2DC20-22 Weld 10-2DC20-23 Weld 10-2DC20-24 Weld 10-2DC20-26 Weld 10-2DC20-28 HV-2-10-23453NC, MO-23452AB Weld 10-2AC10-13 RHR Crosstie B/D LinesDescription Of Work Performed Installed new RHR loop "B" D/W Spray OB Isol ValveInstalled new RHR Hx. 2CE024 Shell Side Relief ValveRepaired partition plate, replaced top head boltingRepaired vertical partition plate weld to the shellEPU -RHR Crosstie
-A/C Lines -Online -ECR 11-00497EPU -RHR Crosstie
-A/C Lines -Outage -ECR 11-00497EPU -RHR Crosstie
-"A" Line -Outage -ECR 11-00497EPU -RHR Crosstie
-"C" Line -Outage -ECR 11-00497EPU -RHR Crosstie
-"A" Line -Outage -ECR 11-00497Replaced and relocated supportInstalled new spring can supportInstalled new spring can supportInstalled new spring can supportInstalled new spring can supportInstalled new strut supportInstalled new spring can supportInstalled new spring can assemblyEPU -RHR Crosstie
-FE-2-10-81076A ISI large bore weldsEPU -RHR Crosstie
-FE-2-10-81076C ISI large bore weldsEPU -RHR Crosstie
-"A" ISI large bore weldEPU -RHR Crosstie
-"A" ISI large bore weldEPU -RHR Crosstie
-"A" ISI large bore weld CV-2-10-2677A EPU -RHR Crosstie
-"A" ISI large bore weld CV-2-10-2677A EPU -RHR Crosstie
-"A" ISI large bore weldEPU -RHR Crosstie
-"C" ISI large bore weldEPU -RHR Crosstie
-"C" ISI large bore weld CV-2-10-2677C EPU -RHR Crosstie
-"C" ISI large bore weld CV-2-10-2677C EPU -RHR Crosstie
-"C" ISI large bore weldEPU -RHR Crosstie
-"C" ISI large bore weldEPU -RHR Crosstie
-"C" ISI large bore weldEPU -RHR Crosstie
-Install Valves/Flanges ECR 11-00497EPU -RHR Crosstie
-"A" and "C" ISI large bore weldEPU -RHR Crosstie
-B/D Lines -Online -ECR 11-00498Flaw or RelevantCondition FoundDuring Scheduled Section Xl ExamOr TestNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoDateComplete R&R Plan # and W/O #11/17/2014 2/11/2013 4/11/2014 2/13/2014 9/4/20149/30/2014 11/13/2014 11/16/2014 11/12/2014 11/7/2014 11/7/2014 11/15/2014 11/21/2014 11/12/2014 11/29/2014 11/19/2014 11/19/2014 10/30/2014 11/1/2014 10/30/2014 10/30/2014 11/1/2014 9/24/2014 10/30/2014 10/30/2014 11/1/2014 9/21/2014 11/2/2014 11/1/2014 11/1/2014 11/13/2014 11/12/2014 10/10/2014 12-081,12-157,12-158,13-162,14-099,14-100,14-101,14-102,14-103,14-108,14-109,14-112,14-113,14-114,14-115,14-116,14-120,14-121,14-122,14-123,14-124,14-125,14-126,14-127,14-128,14-129,14-130,14-131,14-132,14-133,14-134,14-135,14-136,C0241257R 1062078R0974607R0963795C0248755C0248760C0248761C0248762C0248763C0251208C0251209C0251226C0251229C0251236C0251237C0251238C0251242C0251269C0251270C0251408C0251409C0251410C0251411C0251412C0251413C0251414C0251415C0251416C0251417C0251418C0251435C0251444C0248901 TABLE 2ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURESFOR PEACH BO'TOM ATOMIC POWER STATION, UNIT NO. 2OCTOBER 19, 2012 TO DECEMBER 2, 2014(END OF P2R20 REFUEL OUTAGE)01/31/15, Page 4 of 7SYSTEM 10: RESIDUAL HEAT REMOVAL (continued)
CodeClassClass 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Repair,Replacement, or Corrective MeasureReplacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Item Description (component I.D.)RHR Crosstie B/D LinesRHR Crosstie "B" LinesRHR Crosstie "D" LinesRHR Crosstie "D" LinesWeld 10-2XB020-11
& 12Weld 10-2XD020-20
& 2110-GB-H594 10-GB-S-599 10-GB-H595 10-GB-H74 10-GB-H592 1 0-GA-S-607 10-GB-H81 Weld 10-2DB20-16 Weld 10-2DB20-22 Weld 10-2DB20-23 Weld 10-2DB20-24 Weld 10-2DB20-26 Weld 10-2DB20-28 Weld 10-2DD20-19 Weld 10-2DD20-20, 21C1,28Weld 10-2DD20-25 Weld 10-2DD20-26 Weld 10-2DD20-27 HV-2-10-23453B/D, MO-23452B Weld 10-2BD10-13 RHR Crosstie "A" LinesRHR Crosstie "D" Lines10-GA-H 593Weld 10-2DC20-19 Weld 10-2DB20-20 Weld 10-2BD10-02 Weld 10-2AC10-02 Weld 10-2BD10-16 Description Of Work Performed EPU -RHR Crosstie
-B/D Lines -Outage -ECR 11-00498EPU -RHR Crosstie
-"B" Line -Outage -ECR 11-00498EPU -RHR Crosstie
-"D" Line -Outage -ECR 11-00498EPU -RHR Crosstie
-"D" Line -Outage -ECR 11-00498EPU -RHR Crosstie
-FE-2-10-81076B ISI large bore weldsEPU -RHR Crosstie
-FE-2-10-81076D ISI large bore weldsInstalled new spring can supportInstalled new strut supportInstalled new spring can supportReplaced and relocated supportInstalled new spring can supportInstalled new strut supportInstalled new spring can assemblyEPU -RHR Crosstie
-"B" ISI large bore weldEPU -RHR Crosstie
-"B" ISI large bore weldEPU -RHR Crosstie
-"B" ISI large bore weldEPU -RHR Crosstie
-"B" ISI large bore weldEPU -RHR Crosstie
-"B" ISI large bore weldEPU -RHR Crosstie
-"B" ISI large bore weldEPU -RHR Crosstie
-"D" ISI large bore weldEPU -RHR Crosstie
-"D" ISI large bore weldEPU -RHR Crosstie
-"D" ISI large bore weldEPU -RHR Crosstie
-"D" ISI large bore weldEPU -RHR Crosstie
-"D" ISI large bore weldEPU -RHR Crosstie
-Install Valves/Flanges ECR 11-00498EPU -RHR Crosstie
-"B" and "D" ISI large bore weldEPU -RHR Crosstie
-"A" install weldolet and 3" blind flangeEPU -RHR Crosstie
-"D" install weldolet and 3" blind flangeInstalled new spring can supportEPU -RHR Crosstie
-"C" ISI large bore weldEPU -RHR Crosstie
-"D" ISI large bore weldEPU -RHR Crosstie
-"D" ISI large bore weldEPU -RHR Crosstie
-"C" ISI large bore weldEPU -RHR Crosstie
-"D" ISI large bore weldFlaw or RelevantCondition FoundDuring Scheduled Section XI ExamOr TestNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoDateComplete10/2/2014 11/19/2014 11/22/2014 11/23/2014 11/15/2014 11/15/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/14/2014 11/14/2014 9/24/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/18/2014 11/18/2014 9/21/2014 11/21/2014 11/22/2014 11/21/2014 11/1/2014 11/14/2014 11/26/2014 11/1/2014 11/14/2014 11/18/2014 11/4/2014 10/7/2014 R&R Plan # and W/O #14-137, C024890514-138, C024890614-139, C024890714-141, C024890914-144, C025127714-145, C025127814-146, C025135714-147, C025135814-148, C025135914-152, C025136314-154, C025136614-155, C025137014-156, C025137114-157, C025141914-158, C025142114-159, C025142214-160, C025142314-161, C025142414-162, C025142514-163, C025142614-164, C025142714-165, C025142814-166, C025142914-167, C025143014-168, C025143814-169, C025144614-172, C025182114-173, C025182214-195, C025136914-203, C025324514-204, C025326114-205, C025336814-206, C025335614-207, C0253370 TABLE 2ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURESFOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2OCTOBER 19, 2012 TO DECEMBER 2, 2014(END OF P2R20 REFUEL OUTAGE)01/31/15, Page 5 of 7SYSTEM 10: RESIDUAL HEAT REMOVAL (continued)
Repair,Replacement, Code or Corrective Class MeasureClass 2Class 2Class 2Class 2Class 2Replacement RepairReplacement Replacement Replacement Item Description (component I.D.)Weld 10-2AC10-16 10GB-H61Weld 10-2DB20-29 2" pipe cap on 10GB-20" lineMO-2-10-031 BDescription Of Work Performed EPU -RHR Crosstie
-"C" ISI large bore weldRepaired and modified 1OGB-H61 per ECR PB14-00002 EPU -RHR Crosstie
-"D" ISI large bore weldEPU -RHR Crosstie
-"D" RHR Pump Disch line 2" pipe capReplaced RHR loop "B" D/W spray inboard isolation valveFlaw or RelevantCondition FoundDuring Scheduled Section XI ExamOr TestNoNoNoNoNoDateComplete10/6/2014 11/13/2014 11/14/2014 11/20/2014 11/30/2014 R&R Plan # and W/O #14-208, C025335814-212, C025375614-227, C025471414-233, C024890714-235, C0254950SYSTEM 11: STANDBY LIQUID CONTROL SYSTEMRepair,Replacement, Code or Corrective Class MeasureClass 2 Replacement Flaw or RelevantCondition FoundDuring Scheduled Section XI ExamOr TestItem Description (component I.D.)Description Of Work Performed DateComplete R&R Plan # and W/O #11/5/2014 14-012, R1185222RV-2-11-39A Installed new relief valveNoSYSTEM 23: HIGH PRESSURE COOLANT INJECTION SYSTEMCodeClassClass 2Class 2Class 2Class 2Repair,Replacement, or Corrective MeasureReplacement Replacement Replacement Replacement Item Description (component I.D.)RV-2-23B-034 HPCI SupportsLS-2-23-091 A/091 BLE-2-23-090 Description Of Work Performed Installed new relief valveEPU -Install / Modify HPCI Supports per ECR 12-00178EPU -Relocate Torus High Level Switch per ECR 12-00338Replace stainless steel flange with carbon per ECR 12-00338Flaw or RelevantCondition FoundDuring Scheduled Section XI ExamOr TestNoNoNoNoDateComplete1/13/2014 11/18/2014 11/13/2014 12/1/2014 R&R Plan # and W/O #13-159, C025006614-074, C025066214-093, C025111314-211, C0252743 TABLE 2ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURESFOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2OCTOBER 19, 2012 TO DECEMBER 2, 2014(END OF P2R20 REFUEL OUTAGE)SYSTEM 65A: HYDRAULIC SNUBBERS01/31/15, Page 6 of 7Repair,Replacement, Code or Corrective Class MeasureClass 1Class 1Class 1Class 2Class 1Class 1Class 1Class 2Class 1Class 1Class 1Class 1Class 2Class 1Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Class 2Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Item Description (component I.D.)SS-B-5SS-D-3SS-B-31-GG-S-29 SS-B-423-DBN-S-22 SS-3-DVarious SnubbersVarious SnubbersVarious SnubbersVarious SupportsSS-D-723-DDN-S-9 6-DDNL-S-9 10-GB-S-587 10-GB-S-588 10-GB-S-590 10-GB-S-591 10-GB-S-602 10-GB-S-600 10-GB-S-601 10-GB-S-603 10-GB-S-597 10-GB-S-598 Description Of Work Performed Installed new hydraulic snubber and rod eye adapterInstalled new hydraulic snubberInstalled new hydraulic snubberInstalled new hydraulic snubberInstalled new hydraulic snubber and rod eye adapterInstalled new hydraulic snubberInstalled new hydraulic snubberEPU -Install / Modify Snubbers per ECR 12-00179EPU -MS Snubbers NB lines Inside Drywell ECR 12-00178EPU -MS Snubbers C/D lines Inside Drywell ECR 12-00178EPU -Modify Feedwater
& Core Spray Supts ECR 12-00178Installed new hydraulic snubberInstalled new hydraulic snubberInstalled new hydraulic snubberInstalled new hydraulic snubberInstalled new hydraulic snubberInstalled new hydraulic snubberInstalled new hydraulic snubberInstalled new hydraulic snubberInstalled new hydraulic snubberInstalled new hydraulic snubberInstalled new hydraulic snubberInstalled new hydraulic snubberInstalled new hydraulic snubberFlaw or RelevantCondition FoundDuring Scheduled Section XI ExamOr TestNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoDateComplete10/27/2014 10/30/2014 10/25/2014 10/23/2014 10/27/2014 11/3/2014 11/4/2014 11/23/2014 11/23/2014 11/18/2014 11/18/2014 11/14/2014 10/25/2014 10/23/2014 11/17/2014 11/21/2014 11/18/2014 11/18/2014 11/18/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 R&R Plan # and W/O #06-069,06-072,06-078,06-089,14-048,14-050,14-052,14-070,14-072,14-073,14-075,14-077,14-079,14-080,14-110,14-111,14-117,14-118,14-119,14-149,14-150,14-151,14-193,14-194,R0508762R0475287R0470750R0481891R0475279R0780506R0598742C0247050C0250660C0250661C0250668C0250667R0597874R0705368C0251221C0251222C0251239C0251240C0251241C0251360C0251361C0251362C0251367C0251368 TABLE 2ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURESFOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2OCTOBER 19, 2012 TO DECEMBER 2, 2014(END OF P2R20 REFUEL OUTAGE)SYSTEM 65B: MECHANICAL SNUBBERS01/31/15, Page 7 of 7Repair,Replacement, Code or Corrective Class MeasureClass 1N/AClass MClass 2Class 2Class 2Class 1Class 1Class 1N/AN/AClass 2Class 2Class 2Class 2Class 2Class 2Class 2Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Item Description (component I.D.)H-3LS-142-2 30-JB-S-101 9-H1B-H-51 27-HC-S-55 14-MO-S-26 1 0-GB-S-79 SS-2-BSS-1-BH-3LS-142-3 30-JB-S-106 30-JB-S-102 23-HB-S-19 10-HB-S-1 10-GB-S-76, 10-GB-S-77 1 0-GB-S-75 1 0-GB-S-78 1 0-GB-S-77 1 0-GB-S-80 Description Of Work Performed Installed new mechanical snubberInstalled new mechanical snubberInstalled new mechanical snubberInstalled new mechanical snubberInstalled new mechanical snubberInstalled new mechanical snubberInstalled new mechanical snubberInstalled new mechanical snubberInstalled new mechanical snubberInstalled new mechanical snubberInstalled new mechanical snubberInstalled new mechanical snubberInstalled new mechanical snubberInstalled new mechanical snubbersRemoved and rewelded supportsRemoved and rewelded supportsInstalled new mechanical snubberInstalled new mechanical snubberFlaw or RelevantCondition FoundDuring Scheduled Section XI ExamOr TestNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoDateComplete11/7/2014 10/30/2014 10/21/2014 10/21/2014 11/5/2014 11/24/2014 11/3/2014 11/3/2014 11/7/2014 10/30/2014 10/30/2014 10/25/2014 10/21/2014 11/7/2014 11/17/2014 11/26/2014 11/5/2014 11/24/2014 R&R Plan # and W/O #14-053,14-054,14-055,14-056,14-059,14-060,14-061,14-062,14-063,14-064,14-065,14-066,14-067,14-105,14-107,14-153,14-224,14-228,C0248318C0248319C0248320C0248321C0248324C0248325C0248326C0248327C0248328C0248329C0248330C0248331C0248332C0248765C0251199C0251365C0248765C0254716 Attachment 2Peach Bottom Atomic Power Station Unit 3Closure Head Weld Indication Evaluation
-Supplement to Unit 3 Owner's ActivityReportDuring review of historical data, it was identified that the Unit 3 closure head weld, CH-MA, examined in P3R18 had been evaluated using the methods and acceptance criteriaof the 1989 edition of the ASME Section XI code (3rd ISI Inspection Interval code). Thisevaluation should have used the 2001 edition of the ASME Section Xl code since theevaluation was performed in the 4th SI Inspection Interval.
This is a self-identified issuethat was captured in the PBAPS Corrective Action Program (IR 1554519).
A codereconciliation was performed to ensure that the identified weld flaw was still acceptable in accordance with the ASME Section Xl 2001 edition.
The reconciliation performed determined that the flaw evaluation met the requirements of the 2001 code with nochanges required.
The indication was originally discovered during the 13th Unit 3Refueling Outage (3rd ISI inspection interval) and was re-inspected satisfactorily in the18't Unit 3 Refueling Outage in 2011 (4th ISI inspection interval).