MONTHYEARML24022A2262024-01-22022 January 2024 Submittal of the Inservice Inspection (ISI) Owners Activity Report (OAR) for the 24th Refueling Outage for Unit 3 CCN:22-14, Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 32022-01-31031 January 2022 Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 3 ML21041A4502021-02-0909 February 2021 (PBAPS) Unit 2 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 2 ML20034E3322020-01-29029 January 2020 (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 22nd Refueling Outage for Unit 3 ML19308A0112019-10-31031 October 2019 Relief Request I4R-63 Associated with the Fourth Inservice Inspection (ISI) Interval ML19233A1332019-08-21021 August 2019 Inservice Inspection Relief Request 15R-10 ML19050A3522019-02-19019 February 2019 Submittal of the Snubber Inservice Testing Program Plan for the Fifth 10-Year Interval ML19024A1952019-01-23023 January 2019 Results of Visual Inspections of Unit 2 Replacement Steam Dryer in the Second Refueling Outage After Reaching EPU Conditions ML19025A0312019-01-16016 January 2019 (Pbaps), Unit 2 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 22nd Refueling Outage for Unit 2 ML18337A1962018-11-29029 November 2018 Submittal of the Fifth Ten-Year Interval Inservice Testing Program Plan ML18030A1902018-01-30030 January 2018 Results of Visual Inspections of Unit 3 Replacement Steam Dryer ML17039A8842017-02-0909 February 2017 Submittal of the In-Service Inspection (ISI) Owner'S Activity Report (OAR) for the 21st Refueling Outage ML16189A2182016-06-29029 June 2016 BWR Vessel and Internals Project - Vessel Internals Inspection Summaries for Fall 2015 Outages ML16118A4142016-04-27027 April 2016 Submittal of Relief Request Associated with the Fourth Inservice Testing Interval - Pressure Isolation Valve Leakage Testing Frequency ML16021A0892016-01-20020 January 2016 Submittal of the In-Service Inspection (ISI) Owner'S Activity Report (OAR) for the 20th Refueling Outage ML15225A5922015-08-13013 August 2015 Responds to Request for Additional Information Regarding Proposed Relief Request Associated with the Common Emergency Service Water (Esw)System Piping ML15068A3502015-03-0303 March 2015 Submittal of the In-Service Inspection (ISI) Owner'S Activity Report (Oar)For the 20th Refueling Outage for Unit 2 and Supplement to the 18 Refueling Outage OAR RS-14-316, Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System Operating Pressure2014-10-29029 October 2014 Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System Operating Pressure ML14021A0462014-01-21021 January 2014 Submittal of the Inservice Inspection (ISI) Owner'S Activity Report for the 19th Refueling Outage for Unit 3 ML13022A0302013-01-17017 January 2013 Submittal of the Inservice Inspection (ISI) Owner'S Activity Report for the 19th Refueling Outage ML12012A2192012-01-11011 January 2012 Submittal of the Inservice Inspection (ISI) Owner'S Activity Report for the 18th Refueling Outage ML1100700232011-01-0505 January 2011 Submittal of Inservice Inspection (ISI) Owner'S Activity Report for the 18th Refueling Outage ML1001901312010-01-0808 January 2010 Submittal of Inservice Inspection (ISI) Owner'S Activity Report for the 17th Refueling Outage ML0903301712009-01-29029 January 2009 Submittal of Third Interval Inservice Inspection (ISI) Owners Activity Reports ML0832300562008-11-13013 November 2008 Submittal of Program for the Fourth Ten-Year Interval Inservice Testing Program ML0806405872008-02-29029 February 2008 Submittal of Relief Requests Associated with the Third and Fourth Inservice Inspection (Lsi) Intervals and the First and Second Containment Inservice Inspection (Cisi) Intervals RS-07-058, Amergen/Exelon Nuclear - Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements2007-04-19019 April 2007 Amergen/Exelon Nuclear - Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements ML0212700072002-04-26026 April 2002 Submittal of the Third 10-Year Interval First Inspection Period, Inservice Inspection Owners Activity Report 2024-01-22
[Table view] Category:Letter
MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection 2024-09-06
[Table view] |
Text
Exelon Generation ~
10CFR 50.55a February 9, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station (PBAPS) Unit 2 Renewed Facility Operating License No. DPR-44 NRC Docket No. 50-277
Subject:
Submittal of the In-Service Inspection (ISi) Owner's Activity Report (OAR) for the 21 51 Refueling Outage for Unit 2 Attached is the ISi Owner's Activity Report covering ISi activities associated with the third period of the current ISi inspection interval for Unit 2. This report is submitted pursuant to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, "Rules for the lnservice Inspection of Nuclear Power Plant Components," Article IWA-6200, "Requirements" (2001 Edition through 2003 Addenda) and ASME Code Case N-532-4 (Repair/Replacement Activity Documentation Requirements and In-Service Summary Report Preparation and Submission, section XI, Division 1).
If you have any questions or require additional information, feel free to contact Brian Rufo at 717-456-3250.
Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station Attachment cc: US NRC, Administrator, Region I US NRC, Senior Resident Inspector R. R. Janati, Commonwealth of Pennsylvania S. Gray, State of Maryland B. Watkins, PSE&G, Financial Controls and Co-owner Affairs CCN: 17-17
Attachment Peach Bottom Atomic Power Station Unit 2 Owner's Activity Report for the 21st Refueling Outage
CASE (continued)
CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-4 FORMOAR*l OWNER'SACTIVITYREPORT ReportNumber~'°".L..---------------------------------------------------------------------------
Plant Peach Bottom A!omlc Power Station. 1848 Lay Road Pella. PA 17314 Unit No.____~---------Commerdel service date___.J..,y..,ly..,,6..._,1..,.9~7.... 4 _______Reruelfng outage no. _,,...______________
(W1ppll ..bl1)
Current inspection Interval ISi - Eoyrth I CISI - Second (111, 2nd, 3rd, 4th. other)
Current Inspection period .,.IS,..l._-_Tb.......,lr..
d_._/_C~l.,.S....1_-Th~l~rd..._______________________________________________________
(1111, 2nd, 3rd)
Edition end Addenda of Section XI epplicable to the Inspection plans 2001 EdH!on tbroygb 2003 Mdenda Date and revision of Inspection plans _.9~1_21_2~0~14~R~e-v~4~--------------------------------------------------
Edition and Addenda of SecUon XI applicable to repair/replacement activities, If different than the Inspection plans ~N=l....
A_______
Code Cases used: N-460; N-513-3; N-532-4; N-578-1; N-700; N-702 (II *pplle1bl1)
CERTIFICATE OF CONFORMANCE I certify that (a) Iha statements made In this report are correct; (b) Iha examinations and test& meat the Inspection Plan as required by the ASME Coda,Section XI; and (c) Iha repair/replacement acUvlties and evaluations supporting the compleUon ol ...P~2~B..,2""1_____________
(rwfllllfng OU1ago number) conform to the requirements or Section XI.
CERTIFICATE OF INSERVICE INSPECTION I, the under&lgned, holding a valid commission Issued by the NaUonal Board ol Boller and Pressure Vessel Inspectors and the State or Province or Pennsylvania and employed by Hartford Steam Boller lnsoection and Insurance Company have inspected the Items described In this Owner's Activity Report, and state that, to the best or my knowledge and belief, the Owner has performed all acUvities represented by this report In accordance with the requirements of Section XI.
By signing this certlncata neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the repair/
replacement acUvfUes and evaluaUon described In Ihle report. Furthennore, neither the Inspector nor his employer shall be liable In any any personal injury or property damage or a losa of any ktnd arising from or connected with this Inspection.
~~~22i~~~:::___ __ commlsalons ,U4L 3 3ZJ' . Ml ),.4 309..3 NaUon1l Board, Stale, Prvvince, Ind Endorsemenl1 (10/08) 3 (N-532-4)
Copyright ASME lriemationel !BPVCI Provtdod by IHS lol1dw * - w\111 ASME Uconsee=E>colon/S911M9101 UserzRufo, Srtan No rwplOdUcllon or n"""'rt&lng pormtrod "41hout n.. ,_ ,,.... IHS Hot for Raelo, 01/30IZD17 13.1l3 CM MST
TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT N0.2 DECEMBER 2, 2014 TO NOVEMBER 11, 2016 Examination Item Item Description Evaluation Description Cateaorv Number None
TABLE 2 02/07/2017 Page 1 of 1 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2
-DECEMBER 2, 2014 TO NOVEMBER 11, 2016 (END OF P2R21 REFUEL OUTAGE)
SYSTEM 01: MAIN STEAM AND TURBINE SYSTEM Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure lcomnonent l.D.I Descriotion Of Work Performed Or Test Comolete R&R Plan #and W/O #
1 Replacement, RV-2-02-071 K Replace Main Steam Safety Relief Valve No 10/31/2016 16-109; C0262038 SYSTEM 13: REACTOR WATER CLEANUP (RWCU)
Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure lcomnonent l.D.I Descriotion Of Work Performed Or Test Comnlete R&R Plan #and W/O #
1 Replacement Piping IS0-2-13-3-E01 Replace degraded piping and abandoned check valve Yes 11 /4/2016 16-116; C0260531 SYSTEM 65A: HYDRAULIC SNUBBERS Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure lcomnonent l.D.l Descrintion Of Work Performed Or Test ComQlete R&R Plan #and W/O #
1 Replacement SS-C-5 Replace hydraulic snubber SS-C-5 No 10/28/2016 06-073; R0467870 1 Replacement SS-D-1 Replace hydraulic snubber SS-D-1 No 11/8/2016 06-081; R0507536 2 Replacement 1-GG-S-81 Replace hydraulic snubber 1-GG-S-81 No 10/27/2016 06-090; R0508766 2 Replacement 1-DB-S-421 Replace hydraulic snubber 1-DB-S-421 No 11/5/2016 16-095; C0261090 1 Replacement SS-D-9 Replace hydraulic snubber SS-D-9 No 11/3/2016 16-096; C0261094 1 Replacement SS-D-8 Replace hydraulic snubber SS-D-8 No 11/5/2016 16-097; C0261095 1 Replacement SS-D-7 Replace hydraulic snubber SS-D-7 No 11/6/2016 16-098; C0261096 1 Replacement SS-A-8 Replace hydraulic snubber SS-A-8 No 11/4/2016 16-100; C0261098 2-Aug Replacement 7-DB-S-12 Replace hydraulic snubber 7-DB-S-12 No 11/5/2016 16-104; C0261088 2-Aug Replacement 7-DB-S-11 Replace hydraulic snubber 7-DB-S-11 No 11/8/2016 16-105; C0261089 2 Replacement 1-DB-S-419 Replace hydraulic snubber 1-DB-S-419 No 11/5/2016 16-106; C0261092 2 Replacement 1-DB-S-418 Replace hydraulic snubber 1-DB-S-418 No 11/4/2016 16-107; C0261093 2 Replacement 1-DB-S-420 Replace hydraulic snubber 1-DB-S-420 No 11/5/2016 16-112; C0261091