Exelon Generation.

10CFR 50.55a March 3, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

Subject:

Submittal of the In-Service Inspection (ISI) Owner's Activity Report (OAR.

for the 2 0th Refueling Outage for Unit 2 and Supplement to the 18 Refueling Outage OAR for Unit 3 Enclosed in Attachment 1 is the ISI Owner's Activity Report covering ISI activities associated with the second period of the current ISI inspection interval for Unit 2. This report is submitted pursuant to the American Society of Mechanical Engineers (ASME)

Boiler and Pressure Vessel Code,Section XI, "Rules for the Inservice Inspection of Nuclear Power Plant Components," Article IWA-6200, "Requirements" (2001 Edition through 2003 Addenda) and ASME Code Case N-532-4 (Repair/Replacement Activity Documentation Requirements and In-Service Summary Report Preparation and Submission, section Xl, Division 1).

In addition, a supplement to the flaw evaluation for the Unit 3 18 ' Refueling Outage OAR concerning a closure head weld is being provided in Attachment 2. This indication was originally discovered during the 1 3 th Unit 3 Refueling Outage (3 rd ISI inspection interval) and was re-inspected satisfactorily in the 18' Unit 3 Refueling Outage in 2011 (4 th ISI inspection interval). A summary of the evaluation performed for this closure head indication is provided in Attachment 2.

If you have any questions or require additional information, feel free to contact Brian Rufo at 717-456-3250.

Sincerely Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station Attachments cc: US NRC, Administrator, Region I US NRC, Senior Resident Inspector R. R. Janati, Commonwealth of Pennsylvania S. Gray, State of Maryland P. Steinhauer, PSE&G, Financial Controls and Co-owner Affairs 0 CCN: 15-31

Attachment 1 Peach Bottom Atomic Power Station Unit 2 Owner's Activity Report for the 2 0 th Refueling Outage

PEACH BOTTOM ATOMIC POWER STATION, UNIT No. 2 - P2R20 OAR REPORT FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number P2R20 Plant Peach Bottom Atomic Power Station, 1848 Lay Road, Delta, PA 17314 Unit No. 2 Commercial Service Date July 5,1974 Refueling Outage No. 20 Current Inspection Interval ISI =Fourth / CISI = Second Current Inspection Period ISI = Second / CISI = Second Edition and Addenda of Section Xl Applicable to the inspection plans 2001 Edition throuqh 2003 Addenda Date and revision of inspection plan 05/20/2014 Rev 3 Edition & Addenda of Section Xl Applicable to repairs and replacements, if different than the inspection plan 2001 Edition through 2003 Addenda Code Cases used: N-460, N-513-3, N-532-4. N-578-1. N-700 & N-702 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of P2R20 confp m to the requirements of Section Xl.

Signed Brian Rufo, ISI Program Owner 7Z / "Date 2/23/2015 Owner or Owner's Designy Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Pennsylvania and employed by HSB Global Standards have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of ad arising from or c nected with this inspection.

LC** Commissions /t/'Z ,,5 ,,

,YI- l6sp Wor'sSinatre National Board, State, Province, and Endorsements Date =z_--,97

TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO.2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE)

Examination Cateor Item Num Item Description Evaluation Description Category Number Relevant Condition - General visual examination of the containment identified minor E-A E1.11 Containment coating coating deterioration. The conditions identified did not require repair per the coatings program. (Ref IR - 2400490, 2400498, 2405719, 2405732, 2406120, 2406122)

Relevant Condition - Hanger rod had mild abrasions due to rubbing against nearby F-A F1.20 Hanger rod movement obstructed conduit. Abrasions were superficial and did not impact support function. (Ref IR 2404923)

HCl Relevant Condition - Hanger identified as being misaligned. Condition was F-A F1.10 Hanger misaligned evaluated and it was determined that the hanger realigns due to thermal movement experienced during start-up. No additional actions required. (Ref IR 2405922)

TABLE 2 01/31/15, Page 1 of 7 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE)

SYSTEM 01: MAIN STEAM AND TURBINE SYSTEM Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure (component I.D.) Description Of Work Performed Or Test Complete R&R Plan # and W/O #

Class 2 Repair HV-2-08A-43001 A Performed leak repair injection on bonnet No 2/2/2013 12-151, C0245314 Class 2 Replacement HV-2-08A-43001 A Installed new valve No 10/30/2014 12-153, C0245315 Class 2 Replacement Hangers and Supports EPU - Install / Modify MS hangers/supports ECR12-00179 No 11/23/2014 14-071, C0247051 Class 1 Replacement RV-2-02-071 C Installed a rebuilt safety relief valve No 11/27/2014 14-084, R1181674 Class 1 Replacement RV-2-02-071 D Installed a rebuilt safety relief valve No 11/27/2014 14-085, R1251614 Class 1 Replacement RV-2-02-071 K Installed a rebuilt safety relief valve No 11/27/2014 14-087, R1181675 Class 1 Replacement RV-2-02-071 L Installed a rebuilt safety relief valve No 11/27/2014 14-088, R1182013 Class 1 Replacement RV-2-02-070A Installed a rebuilt safety relief valve No 11/27/2014 14-089, R1253611 Class 1 Replacement RV-2-02-070C Installed a rebuilt safety relief valve No 11/27/2014 14-090, C0251176 Class 1 Replacement RV-2-02-070B Installed a rebuilt safety relief valve No 11/27/2014 14-230, C0254743 Class 2 Repair 1 DB-H182 Rework/reweld spring can support 1DB-H182 No 11/30/2014 14-237, C0255118 SYSTEM 03: CONTROL ROD DRIVE Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure (component I.D.) Description Of Work Performed Or Test Complete R&R Plan # and W/O #

Class 1 Replacement CRD's 02-39,10-11, 10-15, Exchanged CRD's with rebuilt CRD's No 11/27/2014 14-018, R1251765 10-23,10-31, 14-31, 18-19, 22-23, 22-59, 26-07, 26-31, 34-55, 38-03, 38-55, 42-35, 46-19, 46-27, 46-39, 50-35

TABLE 2 01/31/15, Page 2 of 7 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE)

SYSTEM 04: REACTOR PRESSURE VESSEL & INTERNALS Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure (component I.D.) Description Of Work Performed Or Test Complete R&R Plan # and W/O #

Class 1 Replacement N6B Flange 20S001 Rx Vessel Replace N6B Flange Rx Vessel 20S001 per EOR 13-00046 No 11/27/2014 14-174, C0251472 SYSTEM 06: FEEDWATER Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section Xl Exam Date Class Measure (component I.D.) Description Of Work Performed Or Test Complete R&R Plan # and W/O #

Class 1 Replacement OHK-2-06-96A Performed bonnet modification - welded to bolted No 11/16/2014 14-045, R1120518 Class 2 Replacement MO-2-06D-2163A EPU - install new 2AS018 RFPT, reinstall MO-2-06D-2163A No 11/18/2014 14-180, C0252423 Class 2 Replacement MO-2-06D-2163B EPU - install new 2BS018 RFPT, reinstall MO-2-06D-21638 No 11/16/2014 14-181, C0252426 Class 2 Replacement MO-2-06D-21630 EPU - install new 2CS018 RFPT, reinstall MO-2-06D-2163C No 11/18/2014 14-182, C0252430 Class 1 Replacement CHK-2-06-28A Performed bonnet modification - welded to bolted No 11/27/2014 14-221, R1245318 SYSTEM 07: PRIMARY CONTAINMENT Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure (component I.D.) Description Of Work Performed Or Test Complete R&R Plan # and W/O #

Class M Replacement N-200B Installed new stud on Suppression Chamber Hatch No 11/26/2014 14-043, R1246916

TABLE 2 01/31/15, Page 3 of 7 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FOR PEACH BOT7OM ATOMIC POWER STATION, UNIT NO. 2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE)

SYSTEM 10: RESIDUAL HEAT REMOVAL Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section Xl Exam Date Class Measure (component I.D.) Description Of Work Performed Or Test Complete R&R Plan # and W/O #

Class 2 Replacement MO-2-10-026B Installed new RHR loop "B" D/W Spray OB Isol Valve No 11/17/2014 12-081, C0241257 Class 2 Replacement RV-2-10-181 C Installed new RHR Hx. 2CE024 Shell Side Relief Valve No 2/11/2013 12-157, R 1062078 Class 2 Replacement PB-2-10-2BE024 Repaired partition plate, replaced top head bolting No 4/11/2014 12-158, R0974607 Class 2 Replacement PB-2-10-2AE024 Repaired vertical partition plate weld to the shell No 2/13/2014 13-162, R0963795 Class 2 Replacement RHR Crosstie A/C Lines EPU - RHR Crosstie - A/C Lines - Online - ECR 11-00497 No 9/4/2014 14-099, C0248755 Class 2 Replacement RHR Crosstie A/C Lines EPU - RHR Crosstie - A/C Lines - Outage - ECR 11-00497 No 9/30/2014 14-100, C0248760 Class 2 Replacement RHR Crosstie "A" Line EPU - RHR Crosstie - "A" Line - Outage - ECR 11-00497 No 11/13/2014 14-101, C0248761 Class 2 Replacement RHR Crosstie "C" Line EPU - RHR Crosstie - "C" Line - Outage - ECR 11-00497 No 11/16/2014 14-102, C0248762 Class 2 Replacement RHR Crosstie "A"Line EPU - RHR Crosstie - "A" Line - Outage - ECR 11-00497 No 11/12/2014 14-103, C0248763 Class 2 Replacement 10-GB-H-46 Replaced and relocated support No 11/7/2014 14-108, C0251208 Class 2 Replacement 10-GB-H582 Installed new spring can support No 11/7/2014 14-109, C0251209 Class 2 Replacement 10-GA-H583 Installed new spring can support No 11/15/2014 14-112, C0251226 Class 2 Replacement 10-GA-S-606 Installed new spring can support No 11/21/2014 14-113, C0251229 Class 2 Replacement 10-GB-H584 Installed new spring can support No 11/12/2014 14-114, C0251236 Class 2 Replacement 10-GB-S-589 Installed new strut support No 11/29/2014 14-115, C0251237 Class 2 Replacement 10-GB-H585 Installed new spring can support No 11/19/2014 14-116, C0251238 Class 2 Replacement 10-GB-H53 Installed new spring can assembly No 11/19/2014 14-120, C0251242 Class 2 Replacement Weld 10-2XA020-15 & 16 EPU - RHR Crosstie - FE-2-10-81076A ISI large bore welds No 10/30/2014 14-121, C0251269 Class 2 Replacement Weld 10-2XC020-11 & 12 EPU - RHR Crosstie - FE-2-10-81076C ISI large bore welds No 11/1/2014 14-122, C0251270 Class 2 Replacement Weld 10-2DA20-19 EPU - RHR Crosstie - "A" ISI large bore weld No 10/30/2014 14-123, C0251408 Class 2 Replacement Weld 10-2DA20-20 EPU - RHR Crosstie - "A" ISI large bore weld No 10/30/2014 14-124, C0251409 Class 2 Replacement Weld 10-2DA20-26 EPU - RHR Crosstie - "A" ISI large bore weld CV-2-10-2677A No 11/1/2014 14-125, C0251410 Class 2 Replacement Weld 10-2DA20-27 EPU - RHR Crosstie - "A" ISI large bore weld CV-2-10-2677A No 9/24/2014 14-126, C0251411 Class 2 Replacement Weld 10-2DA20-28 EPU - RHR Crosstie - "A" ISI large bore weld No 10/30/2014 14-127, C0251412 Class 2 Replacement Weld 10-2DC20-16 EPU - RHR Crosstie - "C" ISI large bore weld No 10/30/2014 14-128, C0251413 Class 2 Replacement Weld 10-2DC20-22 EPU - RHR Crosstie - "C" ISI large bore weld CV-2-10-2677C No 11/1/2014 14-129, C0251414 Class 2 Replacement Weld 10-2DC20-23 EPU - RHR Crosstie - "C" ISI large bore weld CV-2-10-2677C No 9/21/2014 14-130, C0251415 Class 2 Replacement Weld 10-2DC20-24 EPU - RHR Crosstie - "C" ISI large bore weld No 11/2/2014 14-131, C0251416 Class 2 Replacement Weld 10-2DC20-26 EPU - RHR Crosstie - "C" ISI large bore weld No 11/1/2014 14-132, C0251417 Class 2 Replacement Weld 10-2DC20-28 EPU - RHR Crosstie - "C" ISI large bore weld No 11/1/2014 14-133, C0251418 Class 2 Replacement HV-2-10-23453NC, MO-23452AB EPU - RHR Crosstie - Install Valves/Flanges ECR 11-00497 No 11/13/2014 14-134, C0251435 Class 2 Replacement Weld 10-2AC10-13 EPU - RHR Crosstie - "A" and "C" ISI large bore weld No 11/12/2014 14-135, C0251444 Class 2 Replacement RHR Crosstie B/D Lines EPU - RHR Crosstie - B/D Lines - Online - ECR 11-00498 No 10/10/2014 14-136, C0248901

TABLE 2 01/31/15, Page 4 of 7 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FOR PEACH BO'TOM ATOMIC POWER STATION, UNIT NO. 2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE)

SYSTEM 10: RESIDUAL HEAT REMOVAL (continued)

Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure (component I.D.) Description Of Work Performed Or Test Complete R&R Plan # and W/O #

Class 2 Replacement RHR Crosstie B/D Lines EPU - RHR Crosstie - B/D Lines - Outage - ECR 11-00498 No 10/2/2014 14-137, C0248905 Class 2 Replacement RHR Crosstie "B" Lines EPU - RHR Crosstie - "B" Line - Outage - ECR 11-00498 No 11/19/2014 14-138, C0248906 Class 2 Replacement RHR Crosstie "D" Lines EPU - RHR Crosstie - "D" Line - Outage - ECR 11-00498 No 11/22/2014 14-139, C0248907 Class 2 Replacement RHR Crosstie "D" Lines EPU - RHR Crosstie - "D" Line - Outage - ECR 11-00498 No 11/23/2014 14-141, C0248909 Class 2 Replacement Weld 10-2XB020-11 & 12 EPU - RHR Crosstie - FE-2-10-81076B ISI large bore welds No 11/15/2014 14-144, C0251277 Class 2 Replacement Weld 10-2XD020-20 & 21 EPU - RHR Crosstie - FE-2-10-81076D ISI large bore welds No 11/15/2014 14-145, C0251278 Class 2 Replacement 10-GB-H594 Installed new spring can support No 11/26/2014 14-146, C0251357 Class 2 Replacement 10-GB-S-599 Installed new strut support No 11/26/2014 14-147, C0251358 Class 2 Replacement 10-GB-H595 Installed new spring can support No 11/26/2014 14-148, C0251359 Class 2 Replacement 10-GB-H74 Replaced and relocated support No 11/26/2014 14-152, C0251363 Class 2 Replacement 10-GB-H592 Installed new spring can support No 11/26/2014 14-154, C0251366 Class 2 Replacement 10-GA-S-607 Installed new strut support No 11/26/2014 14-155, C0251370 Class 2 Replacement 10-GB-H81 Installed new spring can assembly No 11/26/2014 14-156, C0251371 Class 2 Replacement Weld 10-2DB20-16 EPU - RHR Crosstie - "B" ISI large bore weld No 11/14/2014 14-157, C0251419 Class 2 Replacement Weld 10-2DB20-22 EPU - RHR Crosstie - "B" ISI large bore weld No 11/14/2014 14-158, C0251421 Class 2 Replacement Weld 10-2DB20-23 EPU - RHR Crosstie - "B" ISI large bore weld No 9/24/2014 14-159, C0251422 Class 2 Replacement Weld 10-2DB20-24 EPU - RHR Crosstie - "B" ISI large bore weld No 11/14/2014 14-160, C0251423 Class 2 Replacement Weld 10-2DB20-26 EPU - RHR Crosstie - "B" ISI large bore weld No 11/14/2014 14-161, C0251424 Class 2 Replacement Weld 10-2DB20-28 EPU - RHR Crosstie - "B" ISI large bore weld No 11/14/2014 14-162, C0251425 Class 2 Replacement Weld 10-2DD20-19 EPU - RHR Crosstie - "D" ISI large bore weld No 11/14/2014 14-163, C0251426 Class 2 Replacement Weld 10-2DD20-20, 21C1,28 EPU - RHR Crosstie - "D" ISI large bore weld No 11/18/2014 14-164, C0251427 Class 2 Replacement Weld 10-2DD20-25 EPU - RHR Crosstie - "D" ISI large bore weld No 11/18/2014 14-165, C0251428 Class 2 Replacement Weld 10-2DD20-26 EPU - RHR Crosstie - "D" ISI large bore weld No 9/21/2014 14-166, C0251429 Class 2 Replacement Weld 10-2DD20-27 EPU - RHR Crosstie - "D" ISI large bore weld No 11/21/2014 14-167, C0251430 Class 2 Replacement HV-2-10-23453B/D, MO-23452B EPU - RHR Crosstie - Install Valves/Flanges ECR 11-00498 No 11/22/2014 14-168, C0251438 Class 2 Replacement Weld 10-2BD10-13 EPU - RHR Crosstie - "B" and "D" ISI large bore weld No 11/21/2014 14-169, C0251446 Class 2 Replacement RHR Crosstie "A" Lines EPU - RHR Crosstie - "A" install weldolet and 3" blind flange No 11/1/2014 14-172, C0251821 Class 2 Replacement RHR Crosstie "D"Lines EPU - RHR Crosstie - "D"install weldolet and 3" blind flange No 11/14/2014 14-173, C0251822 Class 2 Replacement 10-GA-H 593 Installed new spring can support No 11/26/2014 14-195, C0251369 Class 2 Replacement Weld 10-2DC20-19 EPU - RHR Crosstie - "C" ISI large bore weld No 11/1/2014 14-203, C0253245 Class 2 Replacement Weld 10-2DB20-20 EPU - RHR Crosstie - "D" ISI large bore weld No 11/14/2014 14-204, C0253261 Class 2 Replacement Weld 10-2BD10-02 EPU - RHR Crosstie - "D" ISI large bore weld No 11/18/2014 14-205, C0253368 Class 2 Replacement Weld 10-2AC10-02 EPU - RHR Crosstie - "C" ISI large bore weld No 11/4/2014 14-206, C0253356 Class 2 Replacement Weld 10-2BD10-16 EPU - RHR Crosstie - "D" ISI large bore weld No 10/7/2014 14-207, C0253370

TABLE 2 01/31/15, Page 5 of 7 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE)

SYSTEM 10: RESIDUAL HEAT REMOVAL (continued)

Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure (component I.D.) Description Of Work Performed Or Test Complete R&R Plan # and W/O #

Class 2 Replacement Weld 10-2AC10-16 EPU - RHR Crosstie - "C" ISI large bore weld No 10/6/2014 14-208, C0253358 Class 2 Repair 10GB-H61 Repaired and modified 1OGB-H61 per ECR PB14-00002 No 11/13/2014 14-212, C0253756 Class 2 Replacement Weld 10-2DB20-29 EPU - RHR Crosstie - "D" ISI large bore weld No 11/14/2014 14-227, C0254714 Class 2 Replacement 2" pipe cap on 10GB-20" line EPU - RHR Crosstie - "D" RHR Pump Disch line 2" pipe cap No 11/20/2014 14-233, C0248907 Class 2 Replacement MO-2-10-031 B Replaced RHR loop "B" D/W spray inboard isolation valve No 11/30/2014 14-235, C0254950 SYSTEM 11: STANDBY LIQUID CONTROL SYSTEM Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure (component I.D.) Description Of Work Performed Or Test Complete R&R Plan # and W/O #

Class 2 Replacement RV-2-11-39A Installed new relief valve No 11/5/2014 14-012, R1185222 SYSTEM 23: HIGH PRESSURE COOLANT INJECTION SYSTEM Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure (component I.D.) Description Of Work Performed Or Test Complete R&R Plan # and W/O #

Class 2 Replacement RV-2-23B-034 Installed new relief valve No 1/13/2014 13-159, C0250066 Class 2 Replacement HPCI Supports EPU - Install / Modify HPCI Supports per ECR 12-00178 No 11/18/2014 14-074, C0250662 Class 2 Replacement LS-2-23-091 A/091 B EPU - Relocate Torus High Level Switch per ECR 12-00338 No 11/13/2014 14-093, C0251113 Class 2 Replacement LE-2-23-090 Replace stainless steel flange with carbon per ECR 12-00338 No 12/1/2014 14-211, C0252743

TABLE 2 01/31/15, Page 6 of 7 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE)

SYSTEM 65A: HYDRAULIC SNUBBERS Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure (component I.D.) Description Of Work Performed Or Test Complete R&R Plan # and W/O #

Class 1 Replacement SS-B-5 Installed new hydraulic snubber and rod eye adapter No 10/27/2014 06-069, R0508762 Class 1 Replacement SS-D-3 Installed new hydraulic snubber No 10/30/2014 06-072, R0475287 Class 1 Replacement SS-B-3 Installed new hydraulic snubber No 10/25/2014 06-078, R0470750 Class 2 Replacement 1-GG-S-29 Installed new hydraulic snubber No 10/23/2014 06-089, R0481891 Class 1 Replacement SS-B-4 Installed new hydraulic snubber and rod eye adapter No 10/27/2014 14-048, R0475279 Class 1 Replacement 23-DBN-S-22 Installed new hydraulic snubber No 11/3/2014 14-050, R0780506 Class 1 Replacement SS-3-D Installed new hydraulic snubber No 11/4/2014 14-052, R0598742 Class 2 Replacement Various Snubbers EPU - Install / Modify Snubbers per ECR 12-00179 No 11/23/2014 14-070, C0247050 Class 1 Replacement Various Snubbers EPU - MS Snubbers NB lines Inside Drywell ECR 12-00178 No 11/23/2014 14-072, C0250660 Class 1 Replacement Various Snubbers EPU - MS Snubbers C/D lines Inside Drywell ECR 12-00178 No 11/18/2014 14-073, C0250661 Class 1 Replacement Various Supports EPU - Modify Feedwater & Core Spray Supts ECR 12-00178 No 11/18/2014 14-075, C0250668 Class 1 Replacement SS-D-7 Installed new hydraulic snubber No 11/14/2014 14-077, C0250667 Class 2 Replacement 23-DDN-S-9 Installed new hydraulic snubber No 10/25/2014 14-079, R0597874 Class 1 Replacement 6-DDNL-S-9 Installed new hydraulic snubber No 10/23/2014 14-080, R0705368 Class 2 Replacement 10-GB-S-587 Installed new hydraulic snubber No 11/17/2014 14-110, C0251221 Class 2 Replacement 10-GB-S-588 Installed new hydraulic snubber No 11/21/2014 14-111, C0251222 Class 2 Replacement 10-GB-S-590 Installed new hydraulic snubber No 11/18/2014 14-117, C0251239 Class 2 Replacement 10-GB-S-591 Installed new hydraulic snubber No 11/18/2014 14-118, C0251240 Class 2 Replacement 10-GB-S-602 Installed new hydraulic snubber No 11/18/2014 14-119, C0251241 Class 2 Replacement 10-GB-S-600 Installed new hydraulic snubber No 11/26/2014 14-149, C0251360 Class 2 Replacement 10-GB-S-601 Installed new hydraulic snubber No 11/26/2014 14-150, C0251361 Class 2 Replacement 10-GB-S-603 Installed new hydraulic snubber No 11/26/2014 14-151, C0251362 Class 2 Replacement 10-GB-S-597 Installed new hydraulic snubber No 11/26/2014 14-193, C0251367 Class 2 Replacement 10-GB-S-598 Installed new hydraulic snubber No 11/26/2014 14-194, C0251368

TABLE 2 01/31/15, Page 7 of 7 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE)

SYSTEM 65B: MECHANICAL SNUBBERS Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure (component I.D.) Description Of Work Performed Or Test Complete R&R Plan # and W/O #

Class 1 Replacement H-3LS-142-2 Installed new mechanical snubber No 11/7/2014 14-053, C0248318 N/A Replacement 30-JB-S-101 Installed new mechanical snubber No 10/30/2014 14-054, C0248319 Class M Replacement 9-H1B-H-51 Installed new mechanical snubber No 10/21/2014 14-055, C0248320 Class 2 Replacement 27-HC-S-55 Installed new mechanical snubber No 10/21/2014 14-056, C0248321 Class 2 Replacement 14-MO-S-26 Installed new mechanical snubber No 11/5/2014 14-059, C0248324 Class 2 Replacement 10-GB-S-79 Installed new mechanical snubber No 11/24/2014 14-060, C0248325 Class 1 Replacement SS-2-B Installed new mechanical snubber No 11/3/2014 14-061, C0248326 Class 1 Replacement SS-1-B Installed new mechanical snubber No 11/3/2014 14-062, C0248327 Class 1 Replacement H-3LS-142-3 Installed new mechanical snubber No 11/7/2014 14-063, C0248328 N/A Replacement 30-JB-S-106 Installed new mechanical snubber No 10/30/2014 14-064, C0248329 N/A Replacement 30-JB-S-102 Installed new mechanical snubber No 10/30/2014 14-065, C0248330 Class 2 Replacement 23-HB-S-19 Installed new mechanical snubber No 10/25/2014 14-066, C0248331 Class 2 Replacement 10-HB-S-1 Installed new mechanical snubber No 10/21/2014 14-067, C0248332 Class 2 Replacement 10-GB-S-76, 10-GB-S-77 Installed new mechanical snubbers No 11/7/2014 14-105, C0248765 Class 2 Replacement 10-GB-S-75 Removed and rewelded supports No 11/17/2014 14-107, C0251199 Class 2 Replacement 10-GB-S-78 Removed and rewelded supports No 11/26/2014 14-153, C0251365 Class 2 Replacement 10-GB-S-77 Installed new mechanical snubber No 11/5/2014 14-224, C0248765 Class 2 Replacement 10-GB-S-80 Installed new mechanical snubber No 11/24/2014 14-228, C0254716

Attachment 2 Peach Bottom Atomic Power Station Unit 3 Closure Head Weld Indication Evaluation - Supplement to Unit 3 Owner's Activity Report During review of historical data, it was identified that the Unit 3 closure head weld, CH-MA, examined in P3R18 had been evaluated using the methods and acceptance criteria of the 1989 edition of the ASME Section XI code ( 3 rd ISI Inspection Interval code). This evaluation should have used the 2001 edition of the ASME Section Xl code since the evaluation was performed in the 4 th SI Inspection Interval. This is a self-identified issue that was captured in the PBAPS Corrective Action Program (IR 1554519). A code reconciliation was performed to ensure that the identified weld flaw was still acceptable in accordance with the ASME Section Xl 2001 edition. The reconciliation performed determined that the flaw evaluation met the requirements of the 2001 code with no changes required. The indication was originally discovered during the 1 3 th Unit 3 Refueling Outage (3 rd ISI inspection interval) and was re-inspected satisfactorily in the 18't Unit 3 Refueling Outage in 2011 (4 th ISI inspection interval).