Exelon Generation.
10CFR 50.55a March 3, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278
Subject:
Submittal of the In-Service Inspection (ISI) Owner's Activity Report (OAR.
for the 2 0th Refueling Outage for Unit 2 and Supplement to the 18 Refueling Outage OAR for Unit 3 Enclosed in Attachment 1 is the ISI Owner's Activity Report covering ISI activities associated with the second period of the current ISI inspection interval for Unit 2. This report is submitted pursuant to the American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code,Section XI, "Rules for the Inservice Inspection of Nuclear Power Plant Components," Article IWA-6200, "Requirements" (2001 Edition through 2003 Addenda) and ASME Code Case N-532-4 (Repair/Replacement Activity Documentation Requirements and In-Service Summary Report Preparation and Submission, section Xl, Division 1).
In addition, a supplement to the flaw evaluation for the Unit 3 18 ' Refueling Outage OAR concerning a closure head weld is being provided in Attachment 2. This indication was originally discovered during the 1 3 th Unit 3 Refueling Outage (3 rd ISI inspection interval) and was re-inspected satisfactorily in the 18' Unit 3 Refueling Outage in 2011 (4th ISI inspection interval). A summary of the evaluation performed for this closure head indication is provided in Attachment 2.
If you have any questions or require additional information, feel free to contact Brian Rufo at 717-456-3250.
Sincerely Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station Attachments cc:
US NRC, Administrator, Region I US NRC, Senior Resident Inspector R. R. Janati, Commonwealth of Pennsylvania S. Gray, State of Maryland P. Steinhauer, PSE&G, Financial Controls and Co-owner Affairs 0
CCN: 15-31 Peach Bottom Atomic Power Station Unit 2 Owner's Activity Report for the 2 0th Refueling Outage
PEACH BOTTOM ATOMIC POWER STATION, UNIT No. 2 - P2R20 OAR REPORT FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number P2R20 Plant Peach Bottom Atomic Power Station, 1848 Lay Road, Delta, PA 17314 Unit No. 2 Commercial Service Date July 5,1974 Refueling Outage No. 20 Current Inspection Interval ISI =Fourth
/ CISI = Second Current Inspection Period ISI = Second / CISI = Second Edition and Addenda of Section Xl Applicable to the inspection plans 2001 Edition throuqh 2003 Addenda Date and revision of inspection plan 05/20/2014 Rev 3 Edition & Addenda of Section Xl Applicable to repairs and replacements, if different than the inspection plan 2001 Edition through 2003 Addenda Code Cases used: N-460, N-513-3, N-532-4. N-578-1. N-700 & N-702 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of P2R20 confp m to the requirements of Section Xl.
Signed Brian Rufo, ISI Program Owner 7Z
/
"Date 2/23/2015 Owner or Owner's Designy Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Pennsylvania and employed by HSB Global Standards have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of ad arising from or c nected with this inspection.
LC**
Commissions
/t/'Z
,5
,YI-l6sp Wor'sSinatre National Board, State, Province, and Endorsements Date
=z_--,97
TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO.2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE)
Examination Item Cateor Num Item Description Evaluation Description Category Number Relevant Condition - General visual examination of the containment identified minor E-A E1.11 Containment coating coating deterioration. The conditions identified did not require repair per the coatings program. (Ref I R - 2400490, 2400498, 2405719, 2405732, 2406120, 2406122)
Relevant Condition - Hanger rod had mild abrasions due to rubbing against nearby F-A F1.20 Hanger rod movement obstructed conduit. Abrasions were superficial and did not impact support function. (Ref IR 2404923)
HCl Relevant Condition - Hanger identified as being misaligned. Condition was F-A F1.10 Hanger misaligned evaluated and it was determined that the hanger realigns due to thermal movement experienced during start-up. No additional actions required. (Ref IR 2405922)
TABLE 2 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE)
SYSTEM 01:
MAIN STEAM AND TURBINE SYSTEM 01/31/15, Page 1 of 7 Code Class Class 2 Class 2 Class 2 Class 1 Class 1 Class 1 Class 1 Class 1 Class 1 Class 1 Class 2
- Repair, Replacement, or Corrective Measure Repair Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Repair Item Description (component I.D.)
HV-2-08A-43001 A HV-2-08A-43001 A Hangers and Supports RV-2-02-071 C RV-2-02-071 D RV-2-02-071 K RV-2-02-071 L RV-2-02-070A RV-2-02-070C RV-2-02-070B 1 DB-H182 Description Of Work Performed Performed leak repair injection on bonnet Installed new valve EPU - Install / Modify MS hangers/supports ECR12-00179 Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Rework/reweld spring can support 1DB-H182 Flaw or Relevant Condition Found During Scheduled Section XI Exam Or Test No No No No No No No No No No No Date Complete 2/2/2013 10/30/2014 11/23/2014 11/27/2014 11/27/2014 11/27/2014 11/27/2014 11/27/2014 11/27/2014 11/27/2014 11/30/2014 R&R Plan # and W/O #
12-151, C0245314 12-153, C0245315 14-071, C0247051 14-084, R1181674 14-085, R1251614 14-087, R1181675 14-088, R1182013 14-089, R1253611 14-090, C0251176 14-230, C0254743 14-237, C0255118 SYSTEM 03:
CONTROL ROD DRIVE
- Repair, Replacement, Code or Corrective Class Measure Item Description (component I.D.)
Flaw or Relevant Condition Found During Scheduled Section XI Exam Or Test No Description Of Work Performed Exchanged CRD's with rebuilt CRD's Date Complete R&R Plan # and W/O #
11/27/2014 14-018, R1251765 Class 1 Replacement CRD's 02-39,10-11, 10-15, 10-23,10-31, 14-31, 18-19, 22-23, 22-59, 26-07, 26-31, 34-55, 38-03, 38-55, 42-35, 46-19, 46-27, 46-39, 50-35
TABLE 2 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE)
SYSTEM 04:
REACTOR PRESSURE VESSEL & INTERNALS 01/31/15, Page 2 of 7 Code Class Class 1
- Repair, Replacement, or Corrective Measure Replacement Item Description (component I.D.)
Description Of Work Performed N6B Flange 20S001 Rx Vessel Replace N6B Flange Rx Vessel 20S001 per EOR 13-00046 Flaw or Relevant Condition Found During Scheduled Section XI Exam Or Test No Date Complete 11/27/2014 R&R Plan # and W/O #
14-174, C0251472 SYSTEM 06:
- Repair, Replacement, Code or Corrective Class Measure Class 1 Class 2 Class 2 Class 2 Class 1 Replacement Replacement Replacement Replacement Replacement Item Description (component I.D.)
OHK-2-06-96A MO-2-06D-2163A MO-2-06D-2163B MO-2-06D-21630 CHK-2-06-28A Description Of Work Performed Flaw or Relevant Condition Found During Scheduled Section Xl Exam Or Test No No No No No Performed bonnet modification - welded to bolted EPU - install new 2AS018 RFPT, reinstall MO-2-06D-2163A EPU - install new 2BS018 RFPT, reinstall MO-2-06D-21638 EPU - install new 2CS018 RFPT, reinstall MO-2-06D-2163C Performed bonnet modification - welded to bolted Date Complete 11/16/2014 11/18/2014 11/16/2014 11/18/2014 11/27/2014 R&R Plan # and W/O #
14-045,14-180, 14-181,14-182, 14-221, R1120518 C0252423 C0252426 C0252430 R1245318 SYSTEM 07:
- Repair, Replacement, Code or Corrective Class Measure Flaw or Relevant Condition Found During Scheduled Section XI Exam Or Test Item Description (component I.D.)
Date Complete R&R Plan # and W/O #
Description Of Work Performed Installed new stud on Suppression Chamber Hatch Class M Replacement N-200B No 11/26/2014 14-043, R1246916
TABLE 2 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FOR PEACH BOT7OM ATOMIC POWER STATION, UNIT NO. 2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE) 01/31/15, Page 3 of 7 SYSTEM 10:
- Repair, Replacement, Code or Corrective Class Measure Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Item Description (component I.D.)
MO-2-10-026B RV-2-10-181 C PB-2-10-2BE024 PB-2-10-2AE024 RHR Crosstie A/C Lines RHR Crosstie A/C Lines RHR Crosstie "A" Line RHR Crosstie "C" Line RHR Crosstie "A" Line 10-GB-H-46 10-GB-H582 10-GA-H583 1 0-GA-S-606 10-GB-H584 1 0-GB-S-589 10-GB-H585 10-GB-H53 Weld 10-2XA020-15 & 16 Weld 10-2XC020-11 & 12 Weld 10-2DA20-19 Weld 10-2DA20-20 Weld 10-2DA20-26 Weld 10-2DA20-27 Weld 10-2DA20-28 Weld 10-2DC20-16 Weld 10-2DC20-22 Weld 10-2DC20-23 Weld 10-2DC20-24 Weld 10-2DC20-26 Weld 10-2DC20-28 HV-2-10-23453NC, MO-23452AB Weld 10-2AC10-13 RHR Crosstie B/D Lines Description Of Work Performed Installed new RHR loop "B" D/W Spray OB Isol Valve Installed new RHR Hx. 2CE024 Shell Side Relief Valve Repaired partition plate, replaced top head bolting Repaired vertical partition plate weld to the shell EPU - RHR Crosstie - A/C Lines - Online - ECR 11-00497 EPU - RHR Crosstie - A/C Lines - Outage - ECR 11-00497 EPU - RHR Crosstie - "A" Line - Outage - ECR 11-00497 EPU - RHR Crosstie - "C" Line - Outage - ECR 11-00497 EPU - RHR Crosstie - "A" Line - Outage - ECR 11-00497 Replaced and relocated support Installed new spring can support Installed new spring can support Installed new spring can support Installed new spring can support Installed new strut support Installed new spring can support Installed new spring can assembly EPU - RHR Crosstie - FE-2-10-81076A ISI large bore welds EPU - RHR Crosstie - FE-2-10-81076C ISI large bore welds EPU - RHR Crosstie - "A" ISI large bore weld EPU - RHR Crosstie - "A" ISI large bore weld EPU - RHR Crosstie - "A" ISI large bore weld CV-2-10-2677A EPU - RHR Crosstie - "A" ISI large bore weld CV-2-10-2677A EPU - RHR Crosstie - "A" ISI large bore weld EPU - RHR Crosstie - "C" ISI large bore weld EPU - RHR Crosstie - "C" ISI large bore weld CV-2-10-2677C EPU - RHR Crosstie - "C" ISI large bore weld CV-2-10-2677C EPU - RHR Crosstie - "C" ISI large bore weld EPU - RHR Crosstie - "C" ISI large bore weld EPU - RHR Crosstie - "C" ISI large bore weld EPU - RHR Crosstie - Install Valves/Flanges ECR 11-00497 EPU - RHR Crosstie - "A" and "C" ISI large bore weld EPU - RHR Crosstie - B/D Lines - Online - ECR 11-00498 Flaw or Relevant Condition Found During Scheduled Section Xl Exam Or Test No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No Date Complete R&R Plan # and W/O #
11/17/2014 2/11/2013 4/11/2014 2/13/2014 9/4/2014 9/30/2014 11/13/2014 11/16/2014 11/12/2014 11/7/2014 11/7/2014 11/15/2014 11/21/2014 11/12/2014 11/29/2014 11/19/2014 11/19/2014 10/30/2014 11/1/2014 10/30/2014 10/30/2014 11/1/2014 9/24/2014 10/30/2014 10/30/2014 11/1/2014 9/21/2014 11/2/2014 11/1/2014 11/1/2014 11/13/2014 11/12/2014 10/10/2014 12-081,12-157, 12-158,13-162, 14-099,14-100, 14-101,14-102, 14-103,14-108, 14-109,14-112, 14-113,14-114, 14-115,14-116, 14-120,14-121, 14-122,14-123, 14-124,14-125, 14-126,14-127, 14-128,14-129, 14-130,14-131, 14-132,14-133, 14-134,14-135, 14-136, C0241257 R 1062078 R0974607 R0963795 C0248755 C0248760 C0248761 C0248762 C0248763 C0251208 C0251209 C0251226 C0251229 C0251236 C0251237 C0251238 C0251242 C0251269 C0251270 C0251408 C0251409 C0251410 C0251411 C0251412 C0251413 C0251414 C0251415 C0251416 C0251417 C0251418 C0251435 C0251444 C0248901
TABLE 2 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FOR PEACH BO'TOM ATOMIC POWER STATION, UNIT NO. 2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE) 01/31/15, Page 4 of 7 SYSTEM 10:
RESIDUAL HEAT REMOVAL (continued)
Code Class Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2
- Repair, Replacement, or Corrective Measure Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Item Description (component I.D.)
RHR Crosstie B/D Lines RHR Crosstie "B" Lines RHR Crosstie "D" Lines RHR Crosstie "D" Lines Weld 10-2XB020-11 & 12 Weld 10-2XD020-20 & 21 10-GB-H594 10-GB-S-599 10-GB-H595 10-GB-H74 10-GB-H592 1 0-GA-S-607 10-GB-H81 Weld 10-2DB20-16 Weld 10-2DB20-22 Weld 10-2DB20-23 Weld 10-2DB20-24 Weld 10-2DB20-26 Weld 10-2DB20-28 Weld 10-2DD20-19 Weld 10-2DD20-20, 21C1,28 Weld 10-2DD20-25 Weld 10-2DD20-26 Weld 10-2DD20-27 HV-2-10-23453B/D, MO-23452B Weld 10-2BD10-13 RHR Crosstie "A" Lines RHR Crosstie "D" Lines 10-GA-H 593 Weld 10-2DC20-19 Weld 10-2DB20-20 Weld 10-2BD10-02 Weld 10-2AC10-02 Weld 10-2BD10-16 Description Of Work Performed EPU - RHR Crosstie - B/D Lines - Outage - ECR 11-00498 EPU - RHR Crosstie - "B" Line - Outage - ECR 11-00498 EPU - RHR Crosstie - "D" Line - Outage - ECR 11-00498 EPU - RHR Crosstie - "D" Line - Outage - ECR 11-00498 EPU - RHR Crosstie - FE-2-10-81076B ISI large bore welds EPU - RHR Crosstie - FE-2-10-81076D ISI large bore welds Installed new spring can support Installed new strut support Installed new spring can support Replaced and relocated support Installed new spring can support Installed new strut support Installed new spring can assembly EPU - RHR Crosstie - "B" ISI large bore weld EPU - RHR Crosstie - "B" ISI large bore weld EPU - RHR Crosstie - "B" ISI large bore weld EPU - RHR Crosstie - "B" ISI large bore weld EPU - RHR Crosstie - "B" ISI large bore weld EPU - RHR Crosstie - "B" ISI large bore weld EPU - RHR Crosstie - "D" ISI large bore weld EPU - RHR Crosstie - "D" ISI large bore weld EPU - RHR Crosstie - "D" ISI large bore weld EPU - RHR Crosstie - "D" ISI large bore weld EPU - RHR Crosstie - "D" ISI large bore weld EPU - RHR Crosstie - Install Valves/Flanges ECR 11-00498 EPU - RHR Crosstie - "B" and "D" ISI large bore weld EPU - RHR Crosstie - "A" install weldolet and 3" blind flange EPU - RHR Crosstie - "D" install weldolet and 3" blind flange Installed new spring can support EPU - RHR Crosstie - "C" ISI large bore weld EPU - RHR Crosstie - "D" ISI large bore weld EPU - RHR Crosstie - "D" ISI large bore weld EPU - RHR Crosstie - "C" ISI large bore weld EPU - RHR Crosstie - "D" ISI large bore weld Flaw or Relevant Condition Found During Scheduled Section XI Exam Or Test No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No Date Complete 10/2/2014 11/19/2014 11/22/2014 11/23/2014 11/15/2014 11/15/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/14/2014 11/14/2014 9/24/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/18/2014 11/18/2014 9/21/2014 11/21/2014 11/22/2014 11/21/2014 11/1/2014 11/14/2014 11/26/2014 11/1/2014 11/14/2014 11/18/2014 11/4/2014 10/7/2014 R&R Plan # and W/O #
14-137, C0248905 14-138, C0248906 14-139, C0248907 14-141, C0248909 14-144, C0251277 14-145, C0251278 14-146, C0251357 14-147, C0251358 14-148, C0251359 14-152, C0251363 14-154, C0251366 14-155, C0251370 14-156, C0251371 14-157, C0251419 14-158, C0251421 14-159, C0251422 14-160, C0251423 14-161, C0251424 14-162, C0251425 14-163, C0251426 14-164, C0251427 14-165, C0251428 14-166, C0251429 14-167, C0251430 14-168, C0251438 14-169, C0251446 14-172, C0251821 14-173, C0251822 14-195, C0251369 14-203, C0253245 14-204, C0253261 14-205, C0253368 14-206, C0253356 14-207, C0253370
TABLE 2 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE) 01/31/15, Page 5 of 7 SYSTEM 10:
RESIDUAL HEAT REMOVAL (continued)
- Repair, Replacement, Code or Corrective Class Measure Class 2 Class 2 Class 2 Class 2 Class 2 Replacement Repair Replacement Replacement Replacement Item Description (component I.D.)
Weld 10-2AC10-16 10GB-H61 Weld 10-2DB20-29 2" pipe cap on 10GB-20" line MO-2-10-031 B Description Of Work Performed EPU - RHR Crosstie - "C" ISI large bore weld Repaired and modified 1OGB-H61 per ECR PB14-00002 EPU - RHR Crosstie - "D" ISI large bore weld EPU - RHR Crosstie - "D" RHR Pump Disch line 2" pipe cap Replaced RHR loop "B" D/W spray inboard isolation valve Flaw or Relevant Condition Found During Scheduled Section XI Exam Or Test No No No No No Date Complete 10/6/2014 11/13/2014 11/14/2014 11/20/2014 11/30/2014 R&R Plan # and W/O #
14-208, C0253358 14-212, C0253756 14-227, C0254714 14-233, C0248907 14-235, C0254950 SYSTEM 11:
STANDBY LIQUID CONTROL SYSTEM
- Repair, Replacement, Code or Corrective Class Measure Class 2 Replacement Flaw or Relevant Condition Found During Scheduled Section XI Exam Or Test Item Description (component I.D.)
Description Of Work Performed Date Complete R&R Plan # and W/O #
11/5/2014 14-012, R1185222 RV-2-11-39A Installed new relief valve No SYSTEM 23:
HIGH PRESSURE COOLANT INJECTION SYSTEM Code Class Class 2 Class 2 Class 2 Class 2
- Repair, Replacement, or Corrective Measure Replacement Replacement Replacement Replacement Item Description (component I.D.)
RV-2-23B-034 HPCI Supports LS-2-23-091 A/091 B LE-2-23-090 Description Of Work Performed Installed new relief valve EPU - Install / Modify HPCI Supports per ECR 12-00178 EPU - Relocate Torus High Level Switch per ECR 12-00338 Replace stainless steel flange with carbon per ECR 12-00338 Flaw or Relevant Condition Found During Scheduled Section XI Exam Or Test No No No No Date Complete 1/13/2014 11/18/2014 11/13/2014 12/1/2014 R&R Plan # and W/O #
13-159, C0250066 14-074, C0250662 14-093, C0251113 14-211, C0252743
TABLE 2 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE)
SYSTEM 65A:
HYDRAULIC SNUBBERS 01/31/15, Page 6 of 7
- Repair, Replacement, Code or Corrective Class Measure Class 1 Class 1 Class 1 Class 2 Class 1 Class 1 Class 1 Class 2 Class 1 Class 1 Class 1 Class 1 Class 2 Class 1 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Item Description (component I.D.)
SS-B-5 SS-D-3 SS-B-3 1-GG-S-29 SS-B-4 23-DBN-S-22 SS-3-D Various Snubbers Various Snubbers Various Snubbers Various Supports SS-D-7 23-DDN-S-9 6-DDNL-S-9 10-GB-S-587 10-GB-S-588 10-GB-S-590 10-GB-S-591 10-GB-S-602 10-GB-S-600 10-GB-S-601 10-GB-S-603 10-GB-S-597 10-GB-S-598 Description Of Work Performed Installed new hydraulic snubber and rod eye adapter Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber and rod eye adapter Installed new hydraulic snubber Installed new hydraulic snubber EPU - Install / Modify Snubbers per ECR 12-00179 EPU - MS Snubbers NB lines Inside Drywell ECR 12-00178 EPU - MS Snubbers C/D lines Inside Drywell ECR 12-00178 EPU - Modify Feedwater & Core Spray Supts ECR 12-00178 Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Flaw or Relevant Condition Found During Scheduled Section XI Exam Or Test No No No No No No No No No No No No No No No No No No No No No No No No Date Complete 10/27/2014 10/30/2014 10/25/2014 10/23/2014 10/27/2014 11/3/2014 11/4/2014 11/23/2014 11/23/2014 11/18/2014 11/18/2014 11/14/2014 10/25/2014 10/23/2014 11/17/2014 11/21/2014 11/18/2014 11/18/2014 11/18/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 R&R Plan # and W/O #
06-069,06-072, 06-078,06-089, 14-048,14-050, 14-052,14-070, 14-072,14-073, 14-075,14-077, 14-079,14-080, 14-110,14-111, 14-117,14-118, 14-119,14-149, 14-150,14-151, 14-193,14-194, R0508762 R0475287 R0470750 R0481891 R0475279 R0780506 R0598742 C0247050 C0250660 C0250661 C0250668 C0250667 R0597874 R0705368 C0251221 C0251222 C0251239 C0251240 C0251241 C0251360 C0251361 C0251362 C0251367 C0251368
TABLE 2 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 OCTOBER 19, 2012 TO DECEMBER 2, 2014 (END OF P2R20 REFUEL OUTAGE)
SYSTEM 65B:
MECHANICAL SNUBBERS 01/31/15, Page 7 of 7
- Repair, Replacement, Code or Corrective Class Measure Class 1 N/A Class M Class 2 Class 2 Class 2 Class 1 Class 1 Class 1 N/A N/A Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Class 2 Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Item Description (component I.D.)
H-3LS-142-2 30-JB-S-101 9-H1B-H-51 27-HC-S-55 14-MO-S-26 1 0-GB-S-79 SS-2-B SS-1-B H-3LS-142-3 30-JB-S-106 30-JB-S-102 23-HB-S-19 10-HB-S-1 10-GB-S-76, 10-GB-S-77 1 0-GB-S-75 1 0-GB-S-78 1 0-GB-S-77 1 0-GB-S-80 Description Of Work Performed Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubbers Removed and rewelded supports Removed and rewelded supports Installed new mechanical snubber Installed new mechanical snubber Flaw or Relevant Condition Found During Scheduled Section XI Exam Or Test No No No No No No No No No No No No No No No No No No Date Complete 11/7/2014 10/30/2014 10/21/2014 10/21/2014 11/5/2014 11/24/2014 11/3/2014 11/3/2014 11/7/2014 10/30/2014 10/30/2014 10/25/2014 10/21/2014 11/7/2014 11/17/2014 11/26/2014 11/5/2014 11/24/2014 R&R Plan # and W/O #
14-053,14-054, 14-055,14-056, 14-059,14-060, 14-061,14-062, 14-063,14-064, 14-065,14-066, 14-067,14-105, 14-107,14-153, 14-224,14-228, C0248318 C0248319 C0248320 C0248321 C0248324 C0248325 C0248326 C0248327 C0248328 C0248329 C0248330 C0248331 C0248332 C0248765 C0251199 C0251365 C0248765 C0254716 Peach Bottom Atomic Power Station Unit 3 Closure Head Weld Indication Evaluation - Supplement to Unit 3 Owner's Activity Report During review of historical data, it was identified that the Unit 3 closure head weld, CH-MA, examined in P3R18 had been evaluated using the methods and acceptance criteria of the 1989 edition of the ASME Section XI code (3 rd ISI Inspection Interval code). This evaluation should have used the 2001 edition of the ASME Section Xl code since the evaluation was performed in the 4th SI Inspection Interval. This is a self-identified issue that was captured in the PBAPS Corrective Action Program (IR 1554519).
A code reconciliation was performed to ensure that the identified weld flaw was still acceptable in accordance with the ASME Section Xl 2001 edition. The reconciliation performed determined that the flaw evaluation met the requirements of the 2001 code with no changes required. The indication was originally discovered during the 13th Unit 3 Refueling Outage (3 rd ISI inspection interval) and was re-inspected satisfactorily in the 18't Unit 3 Refueling Outage in 2011 (4 th ISI inspection interval).