ML12012A219
| ML12012A219 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 01/11/2012 |
| From: | Stathes G Exelon Nuclear |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML12012A219 (9) | |
Text
Exelkn.
Exelon Nuclear www.exeloncorp.com Nuclear Peach Bottom Atomic Power Station 1848 Lay Rd.
Delta, PA 17314 1 OCFR 50.55a January 11, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station (PBAPS) Unit 3 Renewed Facility Operating License No. DPR-56 NRC Docket Nos. 50-278
Subject:
Submittal of the Inservice Inspection (ISI) Owner's Activity Report for the 1 8 th Refueling Outage for Unit 3 Attached is the ISI Owner's Activity Report covering ISI activities associated with the first period of the current ISI inspection interval for Unit 3. This report is submitted pursuant to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section Xl, "Rules for the Inservice Inspection of Nuclear Power Plant Components," Article IWA-6200, "Requirements" (2001 Edition through 2003 Addenda) and ASME Code Case N-532-4 (Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, section Xl, Division 1).
If you have any questions or require additional information, feel free to contact Jeremy Searer at 717-456-4771.
Sincerely, Garey L. Stathes Plant Manager Peach Bottom Atomic Power Station Attachment cc:
US NRC, Administrator, Region I US NRC, Senior Resident Inspector R. R. Janati, Commonwealth of Pennsylvania S. Grey, State of Maryland P. Steinhauer, PSE&G, Financial Controls and Co-owner Affairs CCN: 12-04
,aO(L(
PEACH BOTTOM ATOMIC POWER STATION, UNIT No. 3 - P3R18 OAR REPORT FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number P3R18 Plant Peach Bottom Atomic Power Station, 1848 Lay Road, Delta, PA 17314 Unit No. 3 Commercial Service Date December 23,1974 Refueling Outage No. 18 Current Inspection Interval ISI = Fourth
/ CISI = Second Current Inspection Period ISI = First
/ CISI = First Edition and Addenda of Section Xl Applicable to the inspection plans 2001 Edition through 2003 Addenda Date and revision of inspection plan 05/17/2010 Rev 1 Edition & Addenda of Section Xl Applicable to repairs and replacements, if different than the inspection plan 2001 Edition through 2003 Addenda Code Cases used: N-460, N-513-2, N-532-4, N-578-1 & N-700 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of P3R18 conform to the requirements of Section XI.
Signed Jeremy Searer, ISI Program Owner Date 1/06/2012 U
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Pennsylvania and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kfrfr m
ed with this inspection.
Commissions
-7, A.
(
7-National Board, State, Provin-e, -A;-dEndorsemnents L
TABLE 1 1/03/11, PAGE 1 OF 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 3 OCTOBER 13, 2009 TO OCTOBER 14, 2011 (END OF P3R18 REFUEL OUTAGE)
Examination Item Cateon Num Item Description Evaluation Description Category Number F-A F1.20 10GB-H57 Relevant Condition - The tie rod for one of the two spring cans was found Spring Hanger disconnected. This was evaluated by engineering and corrected in the field. IWF-2430 additional examinations were performed. (Ref IR - 1265095)
F-A F1.20 23DBN-H60 Relevant Condition - Spring hanger load set was outside the 10% design Spring Hanger configuration. Condition was corrected, IWF-2430 additional examinations were performed. (Ref IR 1264139)
N/A N/A RV-3-10-072D Relevant Condition - 0.5 DPM pressure boundary leak on 1 " riser to relief valve.
RHR Pump 3DP035 Suction Relief (Ref IR -1062236, 1264398, 1264909, & 0E34886)
Valve
TABLE 2 12/04/11, PAGE 1 OF 6 ABSTRACT OF ASME REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 3 OCTOBER 13, 2009 TO OCTOBER 14, 2011 (END OF P3R18 REFUEL OUTAGE)
SYSTEM 01:
MAIN STEAM AND TURBINE SYSTEM Code Class Class 1 Class 1 Class 1 Class 1 Class 1 Class 1 Class 1 Class 1 Class 1 Class 1 Repair, or Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Repair Repair Repair Item Description (component I.D.)
RV-3-02-071 D RV-3-02-071 B RV-3-02-071 F RV-3-02-071 L RV-3-02-071 J RV-3-02-070B RV-3-02-071 A Target Rock RV's Target Rock RV's Target Rock RV's Description Of Work Performed Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Machining of safety valves at Target Rock Facility NWS Technologies weld repair of safety relief valves NWS Technologies install thermowell hole on SRV Date Complete 9/22/2011 11/17/2010 9/21/2011 9/21/2011 9/21/2011 9/23/2011 9/21/2011 3/15/2011 3/15/2011 7/12/2011 R&R Plan # and W/O #
09-031, R1013143 10-132, C0232534 11-051, R1084227 11-052, R1084237 11-053, R1085002 11-054, R1147708 11-075, R1147688 11-098, N/A 11-101, N/A 11-111, N/A SYSTEM 01A:
MAIN STEAM SYSTEM Code Class Class 1 N/A Repair, or Replacement Replacement Replacement Item Description (component I.D.)
Main Steam Lines GB1 Description Of Work Performed EPU Project - Install strain gages on main steam lines Replaced missing bolts/washers on rigid restraint Date Complete 9/25/2011 10/3/2011 R&R Plan # and W/O #
11-103, C0238245 11-133, C0240159
TABLE 2 12/04/11, PAGE 2 OF 6 ABSTRACT OF ASME REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 3 OCTOBER 13, 2009 TO OCTOBER 14, 2011 (END OF P3R18 REFUEL OUTAGE)
SYSTEM 03:
CONTROL ROD DRIVE Code Class Class 1 Repair, or Replacement Replacement Item Description (component I.D.)
Description Of Work Performed CRD's 02-43, 06-27, 10-35, Exchanged CRD's with rebuilt CRD's 14-31, 14-55, 18-15, 18-43, 26-03, 26-47, 26-51, 30-31, 30-59, 34-03, 42-43, 46-07, 46-27, 50-51, 54-27, 58-31 Date Complete 10/7/2011 R&R Plan # and W/O #
11-019, R1176794 SYSTEM 04:
REACTOR PRESSURE VESSEL AND INTERNALS Code Class Class 1 Repair, or Replacement Replacement Item Description (component I.D.)
PB-3-04-30S001 Description Of Work Performed Replaced Reactor Head Washer #11 Date Complete 10/7/2011 R&R Plan # and W/O #
11-027, R1153271 SYSTEM 10:
RESIDUAL HEAT REMOVAL Code Class Class 2 Class 2 Class 2 Class 2 Repair, or Replacement Replacement Replacement Replacement Replacement Item Description (component I.D.)
PB-3-10-3CE024 RV-3-10-181 D RV-3-10-181A PB-3-1 0-3DE024 Description Of Work Performed Installed new RHR Hx. 3CE024 Head Bolting Installed new RHR Hx. 3DE024 Shell Side Relief Valve Installed new RHR Hx. 3AE024 Shell Side Relief Valve Installed new RHR Hx. 3DE024 Upper Head Bolting Date Complete 11/12/2009 10/27/2009 1/25/2010 2/1/2011 R&R Plan # and W/O #
07-095, R0974636 08-152, R0949195 09-120, R0958305 10-184, R0974622
TABLE 2 12/04/11, PAGE 3 OF 6 ABSTRACT OF ASME REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE FOR PEACH BO'n'OM ATOMIC POWER STATION, UNIT NO. 3 OCTOBER 13, 2009 TO OCTOBER 14, 2011 (END OF P3R18 REFUEL OUTAGE)
SYSTEM 10:
RESIDUAL HEAT REMOVAL (CONTINUED)
Class 2 Class 2 Class 2 Class 1 Class 2 Class 2 Class 2 Class 2 Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement U3 RHR Decon Ports HV-3-10-520 PB-3-10-3AE024 AO-3-10-046A MO-3-10-026B 3C RHR STRAINER RV-3-10-072D 10-GB-H57 Installed U3 RHR decon ports per ECR PB10-00497 Installed new valve bonnet studs and nuts Installed new RHR Hx. 3AE024 Floating Head Replaced two bonnet studs and nuts Installed new valve Replaced one stud and two nuts on 3C RHR Strainer Installed new RHR Pump 3DP035 Suction Relief Valve Installed new spring can 6/29/2011 7/21/2011 9/19/2011 9/18/2011 10/8/2011 10/2/2011 10/2/2011 9/25/2011 10-206,11-105, 10-195,11-024, 11-073,11-116, 11-122,11-128, C0236147 C0235345 C0233692 C0236669 C0236813 R1154655 R1191752 C0236061 SYSTEM 11:
STANDBY LIQUID CONTROL SYSTEM Code Class Class 2 Repair, or Replacement Replacement Item Description (component I.D.)
RV-3-11-39B Description Of Work Performed Installed new relief valve Date Complete 9/19/2011 R&R Plan # and W/O #
08-103, R1087599 SYSTEM 13:
REACTOR CORE ISOLATION COOLING SYSTEM Code Class Class 1 Class 2 Repair, or Replacement Replacement Replacement Item Description (component I.D.)
AO-3-13-022 HV-3-13C-31202 Description Of Work Performed Installed one new bonnet stud Installed new valve bonnet Date Complete 9/24/2011 9/17/2011 R&R Plan # and W/O #
11-016, R0948855 11-078, C0237070
TABLE 2 12/04/11, PAGE 4 OF 6 ABSTRACT OF ASME REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 3 OCTOBER 13, 2009 TO OCTOBER 14, 2011 (END OF P3R18 REFUEL OUTAGE)
SYSTEM 14:
CORE SPRAY SYSTEM Code Class Class 2 Class 2 Repair, or Replacement Replacement Replacement Item Description (component I.D.)
RV-3-14-020B RV-3-14-020A Description Of Work Performed Installed new relief valve Installed new relief valve Date Complete 5/17/2010 1/5/2010 R&R Plan # and W/O #
09-044, R0935533 09-115, R0950402 SYSTEM 23:
HIGH PRESSURE COOLANT INJECTION SYSTEM Code Repair, or Class Replacement Class 2 Replacement Class 2 Replacement Item Description (component I.D.)
VRV-3-23C-5998A CHK-3-23C-130 Description Of Work Performed Installed new vacuum relief valve.
Installed vent valves on each side of CHK-3-23C-130 Date Complete 12/13/2010 12/17/2010 R&R Plan # and W/O #
10-117, C0232546 10-125, C0233235 SYSTEM 27G:
TORUS WATER TRANSFER Code Class Class 2 Repair, or Replacement Replacement Item Description (component I.D.)
Description Of Work Performed Torus Penet. N-213A Installed new torus penetration flange studs Date Complete 10/1/2011 R&R Plan # and W/O #
11-079, C0237031
TABLE 2 12/04/11, PAGE 5 OF 6 ABSTRACT OF ASME REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 3 OCTOBER 13, 2009 TO OCTOBER 14, 2011 (END OF P3R18 REFUEL OUTAGE)
SYSTEM 32:
HIGH PRESSURE SERVICE WATER SYSTEM Code Class Class 3 Class 3 Class 3 Class 3 Class 3 Class 3 Class 3 Repair, or Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Item Description (component I.D.)
32GB-H26,H27,S59 PB-3-32-3CP042 RV-3-32-180B CHK-3-32-502A 32GB-S67, 32GB-S49A HV-3-32-501 A PB-3-32-3CP042 Description Of Work Performed Installed Shims in supports 32GB-H26, H27, and S59 New HPSW pump and 4 studs/8 nuts on discharge flange Installed new RHR Hx. 3BE024 Tube Side Relief Valve Replaced HPSW 3AP042 Disch Check Valve drain pipe Install new supports during pump replacement Replaced HPSW 3AP042 Disch Block Valve drain pipe New HPSW pump Date Complete 6/4/2010 11/11/2010 1/31/2011 2/8/2010 6/28/2010 2/25/2011 12/30/2010 R&R Plan # and W1O #
09-082, C0228364 09-103, C0221180 09-119, R0948183 09-124, C0231233 10-124, C0233256 10-198, C0233677 10-202, C0235988 SYSTEM 65A:
HYDRAULIC SNUBBERS Code Class Class 3 Class 3 Class 3 Class 1 Class 3 Class 3 Class 1 Class 2 Class 1 Class 1 Repair, or Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Item Description (component I.D.)
1 -GG-S-21 1-GG-S-20 1-GG-S-17 12-DCN-S-7 1-GG-S-52 1-GG-S-29 6-DDNL-S-7 10-GB-S-55 SS-C-5 SS-3-B Description Of Work Performed Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Installed new hydraulic snubber Date Complete 9/22/2011 9/24/2011 9/15/2011 9/19/2011 9/16/2011 9/15/2011 9/17/2011 9/24/2011 9/23/2011 9/19/2011 R&R Plan # and W1O #
11-055, C0236497 11-056, C0236498 11-057, C0236500 11-058, C0236501 11-059, C0236502 11-060, C0236503 11-061, C0236504 11-062, C0236505 11-063, C0236506 11-064, C0236507 Class 2 Replacement 23-DDN-S-29 9/21/2011 11-065, C0236508
TABLE 2 12/04/11, PAGE 6 OF 6 ABSTRACT OF ASME REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 3 OCTOBER 13, 2009 TO OCTOBER 14, 2011 (END OF P3R18 REFUEL OUTAGE)
SYSTEM 65B:
MECHANICAL SNUBBERS Code Class Class M Class 1 Class 3 Class 2 Class 2 Class 3 Class 3 Class 3 Class 3 Class 3 Class 3 Class 1 Class 3 Class 2 Class 3 Class 2 Class 3 Class 3 Class 3 Class 3 Class 3 Class 3 Class 2 Class 2 Class 2 Class 2 Repair, or Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Item Description (component I.D.)
9-HB-H-53 H-3LS-142-3 1-GG-S-101-B 10-GB-S-67 14-GB-S-34 1-GG-S-103-B 1-GG-S-102-B 1-GG-S-110-B 1-GG-S-207-A 1-GG-S-106-A 1-GG-S-112-B 12-DCN-S-9 1-GG-S-102-A 23-HB-S-3-A 1-GG-S-203-B 1 0-GB-S-65 1-GG-S-209-B 1-GG-S-112-A 1-GG-S-105-B 1-GG-S-208-A 1-GG-S-206-A 1-GG-S-105-A 14-MO-S-42B 14-MO-S-42A 1 0-HBmS-8 10-GB-S-50 Description Of Work Performed Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical sRubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Installed new mechanical snubber Date Complete 9/22/2011 9/19/2011 9/16/2011 9/24/2011 9/24/2011 9/20/2011 9/20/2011 9/20/2011 9/16/2011 9/15/2011 9/21/2011 9/20/2011 9/20/2011 9/21/2011 9/16/2011 9/24/2011 9/24/2011 9/22/2011 9/21/2011 9/15/2011 9/22/2011 9/17/2011 9/28/2011 9/28/2011 9/28/2011 9/28/2011 R&R Plan # and W/O #
11-066,11-067, 11-068,11-069, 11-070,11-080, 11-081,11-082, 11-083,11-084, 11-085,11-086, 11-088,11-089, 11-091,11-092, 11-093,11-094, 11-095,11-096, 11-097,11-114, 11-129,11-130, 11-131,11-132, C0236509 C0236510 C0236511 C0236512 C0236513 C0237211 C0237213 C0237214 C0237215 C0237216 C0237217 C0237218 C0237221 C0237223 C0237224 C0237222 C0237225 C0237226 C0237227 C0237228 C0237229 C0239041 C0240078 C0240080 C0240081 C0240082