Submittal of the Third 10-Year Interval First Inspection Period, Inservice Inspection Owners Activity Report
ML021270007
Person / Time
Site: Peach Bottom 
Issue date: 04/26/2002
From: Doering J
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC MA4008, TAC MA4009
Download: ML021270007 (88)


Text

Exelon.

Exelon Nuclear Telephone 717.456.7014 Nuclear Peach Bottom Atomic Power Station www.exeloncoTp.com 1848 Lay Road Delta, PA 17314-9032 10 CFR 50.55a April 26, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Unit 3 Facility Operating License No. DPR-56 Docket No. 50-278

SUBJECT:

Submittal of the Third 10-Year Interval First Inspection Period, Inservice Inspection Owners Activity Report for Peach Bottom Atomic Power Station, Unit 3

REFERENCES:

1. Peach Bottom Atomic Power Station (PBAPS), Unit 3 3R12 Submittal of Inservice Inspection Summary Report, dated January 31,2000
2. Letter from J. W. Clifford (USNRC) to J. A. Hutton (PECO Energy Co.), "Third 10-Year Interval Inspection Program Plan Request For Relief Nos. RR-26, RR-27, RR-28, RR-29, RR-30, RR-31, RR-32, and RR-33 for Peach Bottom Atomic Power Station, Units 2 and 3 (TAC Nos. MA4008 and MA4009)", dated July 31, 2000 In accordance with the Exelon Generation Company, LLC Third 10-Year Interval, Inservice Inspection (ISI) Program, inservice inspections and related activities were completed on Peach Bottom Atomic Power Station (PBAPS), Unit 3, from October 28, 1999 through December 31, 2001, and included the 13th refueling outage. As required by ASME Section XI, IWA-6230 ("Summary Report Submittal"), a portion of Third Interval, First Period activities were previously reported in Reference 1. As required by ASME XI Code Case N-532 and PBAPS approved Request for Alternative RR-31 (Ref.

2), the attached Form OAR-1 includes the balance of activity reporting for the Third Interval, First Period and the cumulative examination and test completion progress for the entire First Period.

April 26, 2002 Page 2 Also attached is an information copy of the current 10-year ISI schedule of examinations for Peach Bottom Atomic Power Station, Units 2 and 3.

No additional actions are requested.

The attached schedule is subject to change.

Updated schedules are available for review in accordance with the requirements of ASME Xl, IWA-6340 "Inservice Inspection Records and Reports".

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, John oering, Jr.

Vice President Peach Bottom Atomic Power Station G i/rD/PRR/hgc Attachments (2) cc:

H. J. Miller, Administrator, Region I, USNRC A. C. McMurtray, USNRC Senior Resident Inspector, PBAPS

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: 3R13 Owner:

EXELON NUCLEAR 200 Exelon Way Kennett Square, PA 19348 Plant:

Peach Bottom Atomic Power Station 1848 Lay Road Delta, PA 17314 Unit No.: 3 Commercial Service Date: December 23, 1974 Refueling Outage No.: 13 Current Inspection Interval: 3rd Current Inspection Period: s1_st Edition and Addenda of Section XI applicable to the Inspection Plan: 1989 Edition & 1992 Edition, 1992 Addenda Date and Revision of Inspection Plan: August 31, 2001, Revision 0 and changes dated November 8, 2001 Edition and Addenda of Section XI applicable to Repairs and Replacements: 1989 Edition & Code Case N-416-1 CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report for the period October 28, 1999 to December 31, 2001 conform to the requirements of Section XI.

Signed: 2Date:

oz CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Pennsylvania and employed by Hartford Steam Boiler Inspection &

Insurance Company of Hartford, Connecticut have inspected the components described in the Owner's Data Report during the period October 28, 1999 to December 31, 2001 and state that to the best of my knowledge and belief the Owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Data Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Date:

TABLE 1 ABSTACTS OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinations Examinations Examinations Credited (%)

Examination Required For Credited For Credited (%)

To Date For Category The Interval The Period For The Period The Interval Remarks

1) RPV circumferential shell weld exemptions per approved Request for Alternative RR-41 B-A 31 12 38.7 38.7
2) Code Case N-598 per approved Request for Alternative RR-33 B-D 62 24 38.7 38.7 Code Case N-598 per approved Request for Alternative RR-33 B-E 62 0

0.0 0.0 Deferred to RPV Hydro B-F 37 14 37.8 37.8 Code Case N-598 per approved Request for Alternative RR-33 B-G-1 92 46 50.0 50.0 Code Case N-598 per approved Request for Alternative RR-33 B-G-2 13 13 100.0 100.0 No other scheduled disassembly at this time B-J 132 48 36.4 36.4 Code Case N-598 per approved Request for Alternative RR-33 B-K 17 6

35.3 35.3 Code Case N-598 per approved Request for Alternative RR-33 B-L-2 0

0 0.0 0.0 No scheduled disassembly at this time B-M-2 3

3 100.0 100.0 No other scheduled disassembly at this time B-N-1 3

1 33.3 33.3 B-N-2 57 17 29.8 29.8 B-O 0

0 0.0 0.0 Exempt Per IWB-1220(a)

B-P 6

2 33.3 33.3 C-A 2

1 50.0 50.0 Code Case N-598 per approved Request for Alternative RR-33 C-B 4

1 25.0 25.0 C-C 16 6

37.5 37.5 Code Case N-598 per approved Request for Alternative RR-33 C-F-1 0

0 0.0 0.0 No welds for this Code Category C-F-2 71 27 38.0 38.0 Code Case N-598 per approved Request for Alternative RR-33 C-H 48 16 33.3 33.3 D-A 18 8

44.4 44.4 Code Case N-598 per approved Request for Alternative RR-33 D-B 9

3 33.3 33.3 E-A 39 13 33.3 33.3 20 Additional el.11 examinations per 1 OCFR50.55(a)

E-C 1

0 0.0 0.0 Alternative examination program per approved Request for Alternative CRR-1I 1 OCFR50 Appendix J examination of seals and gaskets per approved Request for E-D 1

1 100.0 100.0 Alternative CRR-01 1 OCFR50 Appendix J and Code Category E-A examination per approved Request for E-G 0

0 0.0 0.0 Alternative CRR-07 E-P 0

0 0.0 0.0 10CFR50 Appendix J Test Program F-A 157 67 42.7 42.7 Code Case N-598 per approved Request for Alternative RR-33 Page 2 of 8

TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Page 3 of 8 Examination Im ItFlaw or Relevant Condition Found During Category Number Item Description Flaw Characterization (IWA-3300)

Scheduled ASME XI Examination or Test (Yes or No)

CLOSURE HEAD MERIDIONAL AT 0 DEGREE / CH-MA (PB NCR 01-00999)

B-A b1.22 MULTIPLE SUBSURFACE PLANAR YES CLOSURE HEAD MERIDIONAL AT 120 DEGREE / CH-MC (PB NCR 01-00999)

B-A b1.22 SUBSURFACE PLANAR YES CLOSURE HEAD MERIDIONAL AT 300 DEGREE!/ CH-MF (PB NCR 01-00999)

B-A b1.22 SUBSURFACE PLANAR YES HIGH PRESSURE SERVICE WATER SYSTEM PIPING (PB NCRs 00-00983 and 00-00997)

D-B d2.10 N/A (RELEVANT CONDITIONS-MIN. WALL VIOLATION)

NO EMERGENCY SERVICE WATER SYSTEM PIPING (PB NCR 00-01057)

D-B d2.10 N/A (RELEVANT CONDITIONS-MIN. WALL VIOLATION)

NO HIGH PRESSURE SERVICE WATER SYSTEM PIPING (PB NCR 01-00096)

D-B d2.10 N/A (RELEVANT CONDITIONS-MIN WALL VIOLATION)

NO HIGH PRESSURE SERVICE WATER SYSTEM PIPING (PB NCR 01-00553)

D-B d2.10 N/A (RELEVANT CONDITIONS-MIN. WALL VIOLATION)

NO 4/9/02

TABLE 3 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE 03/29/02, Page 4 of 8

    • Denotes that use of Code Case N-416-1 was employed in completing the repair / replacement activity SYSTEM 01:

MAIN STEAM SYSTEM

Repair, Replacement, Code or Corrective Class Measure Class 1 Class 1 Class 1 Class 1 Class 1 Class 1 Class 1 Class 2 Class 2 Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Replacement Class 1 Replacement Class 1 Replacement Item Description (component I.D.)

RV-3-02-071 C RV-3-02-071 A RV-3-02-071 D RV-3-02-071 E RV-3-02-071G RV-3-02-071 H RV-3-02-070B 7-DB-S-12 7-DB-S-1 0 HV-3-01A-83C & 84C HV-3-01 A-83D & 84D Description Of Work Installed a rebuilt safety relief valve with inlet studs & nuts Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Installed a rebuilt safety relief valve Installed new hydraulic snubber Installed new hydraulic snubber Installed new valves Installed new valves Flaw or Relevant Condition Found During Scheduled Section Xl Exam Or Test No No No No No No No No No No No Date Complete 10/21/99 9/22/01 9/22/01 9/21/01 9/19/01 9/19/01 9/21/01 9/25/01 9/26/01 R&R Plan # and W/O #

99-134,01-090, 01-092,01-093, 01-094,01-095, 01-096,01-079, 01-087, C0190996 R0746700 R0745847 R0755007 R0747162 R0747462 R0747163 R0547267 C0193818 9/24/01 01-133, C0198886 9/24/01 01-132, C0198891 REACTOR AND RECIRCULATION

Repair, Replacement, Code or Corrective Item Description Class Measure (component I.D.)

Class 1 Replacement SS-2-A Description Of Work Performed Installed new hydraulic snubber Flaw or Relevant Condition Found During Scheduled Section Xl Exam Or Test No Date Complete R&R Plan # and W/O #

9/18/01 01-032, R0546123

"**k SYSTEM 02:

TABLE 3 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Denotes that use of Code Case N-416-1 was employed in completing the repair/ replacement activity SYSTEM 03:

CONTROL ROD DRIVE 03/29/02 Page 5 of 8

Repair, Replacement, Code or Corrective Class Measure Item Description (component I.D.)

Class 1 Replacement CRD's 02-27, 18-23, 22-23, 14-11, 26-35, 26-39,18-31, 18-39, 30-35, 22-35, 38-35, 38-59, 42-27, 42-55, 46-43, 50-15, 50-27, 26-55, 42-15 Class 2 Replacement AO-3-03-033 Description Of Work Performed Exchanged CRD's with rebuilt CRD's during 3R13 outage Installed new valve Flaw or Relevant Condition Found During Scheduled Section Xl Exam Or Test No No Date Complete 9/24/01 R&R Plan # and W/O #

01-061, R0816423 9/29/01 01-106, C0189604 SYSTEM 06:

FEEDWATER SYSTEM Item Description (component I.D.)

6-DDNL-S-1 1 Description Of Work Performed Installed new hydraulic snubber Flaw or Relevant Condition Found During Scheduled Section XI Exam Or Test No Date Complete R&R Plan # and W/O #

9/19/01 01-039, C0196597 SYSTEM 07:

PRIMARY CONTAINMENT

Repair, Replacement, or Corrective Item Description Measure (component I.D.)

Repair N-002 Description Of Work Performed Seal weld stud to primary cont. equip. access hatch Flaw or Relevant Condition Found During Scheduled Section XI Exam Or Test Date Complete R&R Plan # and W/O #

No 9/27/01 00-077, C0193021 Code Class Class 1

Repair, Replacement, or Corrective Measure Replacement Code Class MC

TABLE 3 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE

    • Denotes that use of Code Case N-416-1 was employed In completing the repair/ replacement activity SYSTEM 10:

RESIDUAL HEAT REMOVAL 03/29/02 Page 6 of 8

Repair, Replacement, Code or Corrective Item Description Class Measure (component I.D.)

Class 2 Class 2 Class 2 Repair Repair Repair Class 3 Replacement Description Of Work Performed Flaw or Relevant Condition Found During Scheduled Section XA Exam Or Test PB-3-10-M-HX-3AE024 Repaired cracked partition welds at hx waterbox inlet PB-3-10-M-HX-3BE024 Repaired cracked partition welds at hx waterbox inlet PB-3-10-M-HX-3CE024 Repaired cracked partition welds at hx waterbox inlet RV-3-10-181C Installed new RHR Hx. 3CE024 Shell Side relief valve No No No No Date Complete 12/14/00 2/2/01 3/10/01 11/12/01 R&R Plan # and W/O #

00-126, C0195466 00-133, C0195531 00-135, C0195553 01-135, R0658136 SYSTEM 11:

STANDBY LIQUID CONTROL SYSTEM Item Description (component I.D.)

Description Of Work Performed PB-3-11-M-PP-3AP040 Installed a new fluid end to pump Flaw or Relevant Condition Found During Scheduled Section XI Exam Or Test No Date Complete R&R Plan # and W/O #

3/7/00 99-095, C0189304 SYSTEM 12:

REACTOR WATER CLEANUP SYSTEM Item Description (component I.D.)

MO-3-12-015 Description Of Work Performed Installed new RWCU Inlet Inboard Isolation valve Flaw or Relevant Condition Found During Scheduled Section XI Exam Or Test No Date Complete R&R Plan # and W/O #

9/24/01 01-112, C0196959 Code Class Class 2

Repair, Replacement, or Corrective Measure Replacement Code Class Class 1
Repair, Replacement, or Corrective Measure Replacement

TABLE 3 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Denotes that use of Code Case N-416-1 was employed in completing the repair/ replacement activity SYSTEM 14:

CORE SPRAY COOLING SYSTEM 03/29/02 Page 7 of 8 Item Description (component I.D.)

Description Of M CHK-3-14A-39036B Installed new check valve Flaw or Relevant Condition Found During Scheduled Section XA Exam Or Test No Inrk Performe.4 Date Complete R&R Plan # and W/O #

9/25/01 01-003, R0823876 SYSTEM 23:

HIGH PRESSURE COOLANT INJECTION SYSTEM

Repair, Replacement, Code or Corrective Item Description Class Measure (component I.D.)

Class 2 Replacement VRV-3-23C-5998B Class 2 Replacement VRV-3-23C-5998A Description Of Work Performed Installed new HPCI turbine exhaust vacuum relief valve Installed new HPCI turbine exhaust vacuum relief valve Flaw or Relevant Condition Found During Scheduled Section XI Exam Or Test No No Date Complete R&R Plan # and W/O #

9/15/01 01-008, R0728746 9/15/01 01-009, R0727459 SYSTEM 32:

HIGH PRESSURE SERVICE WATER SYSTEM

Repair, Replacement, Code or Corrective Item Description Class Measure (component I.D.)

Repair Replacement Repair Replacement PB-3-32-RO-3789D RV-3-32-180D PB-3-32-RO-3789D RV-3-32-180C Description Of Work Performed Repair leaking 14" elbow downstream of RO-3789D Installed new RHR Hx. 3DE024 Tube Side relief valve Repair low wall reading, 14" elbow downstream RO-3789D Installed new RHR Hx. 3CE024 Tube Side relief valve Flaw or Relevant Condition Found During Scheduled Section Xl Exam Or Test No No No No Date Complete 1/12/01 6/11/01 8/22/01 11/12/01 R&R Plan # and W/O #

01-002, C0196207 01-011, R0624376 01-109, C0196207 01-122, R0653726 Code Class Class 2

Repair, Replacement, or Corrective Measure Replacement Class 3 Class 3 Class 3 Class 3 Vnrk PArfnrrn*rl

TABLE 3 ABSTRACT OF ASME REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE

    • Denotes that use of Code Case N-416-1 Was employed in completing the repair/ replacement activity SYSTEM 33:

EMERGENCY SERVICE WATER SYSTEM 03/29/02 Page 8 of 8

Repair, Replacement, or Corrective Item Description Measure (component I.D.)

Replacement HV-3-33-502 Description Of Work Performed Installed new ESW valve and 8" x 6" reducer Flaw or Relevant Condition Found During Scheduled Section X1 Exam Or Test No Date Complete R&R Plan # and W/O #

9/20/01 01-007, C0196120 Code Class Class 3

SCHEDULE DATE - 3/29/02 REVISION-1 COMPONENT ID ASME XI CODE CLASS PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT DESC EXAM CAT ITEM NO NDE METHOD Page 1 of 39 OUTAGE REMARKS I

SYSTEM CORE SPRAY 14-A-12 PIPE TO PIPE 14-B-11 PIPE TO PIPE 14-A-28 PIPE TO PIPE 14-B-28 PIPE TO PIPE 14-A-3 PENT PIPE TO PENT 14-A-503 ELBOW TO PIPE 14-A-802 PIPE TO ELBOW 14-B-10 ELBOW TO PIPE 14-B-3 PENT PIPE TO PENT 14-B-502 VALVE TO PIPE 14-B-503 PIPE TO ELBOW 14-A-43 PIPE TO SAFE-END 14-B-41 PIPE TO SAFE-END 14-A-31 ELBOW TO PIPE 14-A-33 ELBOW TO PIPE 14-A-42 ELBOW TO PIPE 14-B-29 PIPE TO PIPE 14-B-33 ELBOW TO PIPE B-F B-F B-F-X B-F-X B-J B-J B-J B-J B-J B-J B-J B5.130 B5.130 B5.130-X B5.130-X B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11-X B9.11 -X B9.1I-X B9.11-X B9.11-X B9.11-X B9.11-X PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT 2R15 2R16 2R15 2R15 2R15 2R15 2R15 2R16 2R16 2R16 2R16 2R14 2R14 2R15 2R 15 2R15 2R15 2R 15 B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS SYSTEM CORE SPRAY COMPONENT DESC I

ELBOW TO PIPE PIPE TO SAFE-END PIPE TO SAFE-END 14DCN-H74(IA) 14DCN-H74 14DCN-H76 N-16A 14DCN-H73 B-J-X B-J-X B-J-X INTEGRAL ATTACHMENT SPRING HANGER SPRING HANGER ANCHOR SPRING HANGER B-K F-A F-A F-A F-A B9.1 1-X B9.11-X B9.11-X B10.20 FI.10 F1.10 FI.10 FLI10 PT, and UT PT, and UT PT, and UT PT VT-3 VT-3 VT-3 VT-3 2R15 2R16 2R16 2R15 2R15 2R115 2R15 2R16 88-01 Exam Only (no ASME XI credit) 88-01 Exam Only (no ASME XI credit)

SYSTEM FEEDWATER VALVE TO ELBOW PIPE TO ELBOW VALVE TO PIPE PIPE TO TEE TRANS PIECE TO NOZZ PIPE TO TRANS PIECE PIPE TO TRANS PIECE TRANS PIECE TO NOZZ TRANS PIECE TO NOZZ PIPE TO TEE B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT EXAM CAT ITEM NO Page 2 of 39 14-B-40 14-A-43 14-B-41 NDE METHOD OUTAGE REMARKS 6-A-11 6-A-13 6-A-17 6-A-18 6-AA-10 6-AA-9 6-AB-5 6-AB-6 6-AC-9 6-AM-2 2R14 2R14 2R14 2R 14 2R14 2R14 2R14 2R14 2R14 2R14

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS SYSTEM FEEDWATER COMPONENT DESC I

VALVE TO ELBOW TEE TO PIPE PENT PIPE TO PENT 6" BRANCH CONN ELBOW TO PIPE PENT PIPE TO PENT TRANS PIECE TO NOZZ TRANS PIECE TO NOZZ TRANS PIECE TO NOZZ TEE TO PIPE PIPE TO TEE ELBOW TO PIPE PIPE TO ELBOW PIPE TO ELBOW PIPE TO TRANS PIECE PIPE TO ELBOW PIPE TO TRANS PIECE REDUCER TO PIPE INTEGRAL ATTACHMENT SPRING HANGER SPRING HANGER SPRING HANGER B-J B-J B-J B-1 B-J B-J B-i B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-K F-A F-A F-A B9.11 B9.11 B9.11 B9.31 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B110.20 F1.10 FI.10 FI.10 MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT VT-3 VT-3 VT-3 EXAM CAT ITEM NO Page 3 of 39 NDE METHOD OUTAGE REMARKS 6-A-2 6-A-4 6-A-9 6-B-3/13-1 6-B-5 6-B-8 6-BD-9 6-BE-6 6-BF-8 6-BSU-1 6-B-17 6-BD-2 6-BD-3 6-BE-3 6-BE-5 6-BF-2 6-BF-7 6-BM-1 6DD-H57(IA) 6DDNL-H37 6DDNL-H39 6DDNL-H44 2R15 2R15 2R15 2R15 2R15 2R15 2R15 2R15 2R15 2R15 2R16 2R16 2R16 2R16 2R 16 2R16 2R16 2R16 2R15 2R14 2Rl4 2R14

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS SYSTEM FEEDWATER 6DDNL-S 13 6DD-H57 N-9B 6DDNL-H31 6DDNL-H33 6DDNL-H35 6DDNL-H36 6DDNL-H41 6DDNL-H42 COMPONENT DESC I

HYDRAULIC SNUBBER SPRING HANGER ANCHOR SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER SYSTEM HIGH PRESSURE COOLANT INJECTION PIPE TO ELBOW ELBOW TO PIPE PIPE TO ELBOW ELBOW TO VALVE VALVE TO PIPE PIPE TO VALVE PIPE TO ELBOW PENT TO PENT PIPE B-J B-J B-1 B-J B-J B-J B-J B-J B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT 23DBN-H51 (IA)

INTEGRAL ATTACHMENT EXAM CAT ITEM NO Page 4 of 39 NDE METHOD OUTAGE REMARKS F-A F-A F-A F-A F-A F-A F-A F-A F-A FI.10 FI.10 FI.10 FL 10 FI.10 FI.10 FI.10 FI.10 FI.10 FI.10 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 2R14 2R15 2R15 2R16 2Rl6 2R16 2R16 2R16 2R16 23-0-2 23-0-3 23-0-6 23-1-501 23-1-502 23-0-13 23-0-16 23-O-17B 2R14 2R14 2R 14 2R15 2R15 2R 16 2R16 2R16 2R16 B-K 1310.20 MT or PT

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID COMPONENT DESC ASME XI CODE CLASS 1

SYSTEM HIGH PRESSURE COOLANT INJECTION 23DBN-H54 SPRING HANGER 23DBN-H64 SPRING HANGER 23DBN-H51 SPRING HANGER N-11 ANCHOR SYSTEM MAIN RECIRCULATION PUMP B (FS)

PUMP B (NBW)

PUMP B (PRB)

PUMP A (FS)

PUMP A (NBW)

PUMP A (PRB) 2-AS-26/ASD 2-BSD-2 2-BSD-3 2-BSD-4 2-BSD-5 2-AS-19 2-AS-21 FLANGE SURFACES NUTBUSHING & WASHER PRESS-RETAINING BLTS FLANGE SURFACES NUTBUSHING & WASHER PRESS-RETAINING BLTS 2" BRANCH CONNECTION PIPE TO ELBOW ELBOW TO PIPE PIPE TO ELBOW ELBOW TO PIPE SAFE-END TO ELBOW PIPE TO TEE Page 5 of 39 OUTAGE EXAM CAT F-A F-A F-A F-A ITEM NO FlI.10 FI.10 Fl7.10 FI.10 REMARKS NDE METHOD VT-3 VT-3 VT-3 VT-3 2R 14 2Ri5 2R16 2R16 B-G-I B-G-i B-G-I B-G-I B-G-1 B-G-i B-J B-J B-J B-J B-J B-J-X B-J-X B6.190 B6.200 B6.180 B6.190 B6.200 B6.180 B9.32 B9.40 B9.40 B9.40 B9.40 B9.1 I-X B9.11-X VT-I VT-I UT VT-I VT-I UT PT PT PT PT PT PT, and UT PT, and UT 2R14 2R14 2R14 2R16 2R16 2R16 2R 17 2R17 2R17 2R17 2R17 2R14 2R 14

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS I

SYSTEM MAIN RECIRCULATION TEE TO PIPE RED TO PIPE BEND SAFE-END TO ELBOW PIPE BEND TO SF-END PIPE TO TEE PIPE BND TO PIPE BND ELBOW TO PIPE PIPE TO PIPE ELBOW TO PIPE PIPE TO TEE RED TEE TO PIPE BND RED TEE TO PIPE BEND PIPE BND TO PIPE BND CROSS TO PIPE SAFE-END TO ELBOW SAFE-END TO ELBOW INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT CASING INTERNAL SURF B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-K B-K B-L-2 B9.I -X B9.1 1-X B9.1 I -X B9.11-X B9.1 I-X B9.1 1-X B9.11-X B9.II-X B9.11-X B9.1 I-X B9.11-X B9.11-X B9.11-X B9.1 I -X B9.11-X B9.I -X B 10.20 B10.30 B 12.20 PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT VT-3 H17B SPRING HANGER 2R14 2R14 2R 14 2R15 2R15 2R15 2R15 2R15 2R16 2R16 2R16 2R16 2R16 2R 16 2R16 2R16 2R14 2R17 2R14 2R13 2-AS-22 2-BHC-6 2-BS-18 2-AHF-7 2-BD-30 2-BHE-6 2-BS-19 2-BS-20 2-AD-32 2-AD-33 2-AHG-6 2-AHJ-6 2-AHK-6 2-AM-8 2-AS-19 2-BS-18 COMPONENT DESC EXAM CAT ITEM NO Page 6 of 39 NDE METHOD OUTAGE REMARKS 88-01 Exam Only (no ASME XI credit) 88-01 Exam Only (no ASME XI credit)

HIA(IA)

H16B/SSIB(IA)

PUMP B (CIS)

F-A F1.40 VT-3

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 1

SYSTEM MAIN RECIRCULATION SS2B HYDRAULIC SNUBBER H15B SPRING HANGER HIA SPRING HANGER SS6B HYDRAULIC SNUBBER H16B SPRING HANGER H9B SPRING HANGER SS1B HYDRAULIC SNUBBER SS3C HYDRAULIC SNUBBER SS3D HYDRAULIC SNUBBER HI0A SPRING HANGER PG1IB RIGID RESTRAINT SYSTEM MAIN STEAM PIPE TO ELBOW 6-IN. BRANCH CONN 6-IN. BRANCH CONN NO=Z TO TRANS PIECE PIPE TO ELBOW NO=Z TO TRANS PIECE PIPE TO ELBOW TEE TO PIPE 6" BRANCH CONN PIPE TO CAP B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B9.11 B9.31 B9.31 B9.11 B9.11 B9.11 B9.11 B9.11 B9.31 B9.11 MT or PT, & UT MT or PT, & UT MT or PT, & UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT EXAM CAT ITEM NO Page 7 of 39 NDE METHOD OUTAGE REMARKS F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F1.40 F1l.40 FI.10 F1.40 F1.40 F1.10 F1.40 F1.40 F1.40 FI.10 FI.10 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 2R13 2R14 2R14 2R14 2R15 2R15 2R15 2R16 2R16 2R17 2R17 I-A-6 1-A-7/ASC 1-A-7/ASG 1-A-1 l-A-3 1-B-1 l-B-3 l-B-7 I-B-7/BSD I-B-8 2R13 2R13 2R13 2R14 2R14 2R14 2R14 2R 14 2R14 2R14

SCHEDULE DATE - 3/29/02 REVISION - 1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS SYSTEM MAIN STEAM COMPONENT DESC I

BRANCH CONN TO PIPE PIPE TO FLANGE BRANCH CONN TO PIPE PIPE TO FLANGE PENT. N-7A TO PIPE PENT. N-7B TO PIPE PIPE TO VALVE PENT. N-7C TO PIPE 6" BRANCH CONN 6" BRANCH CONN TEE TO PIPE BRANCH CONN TO PIPE BRANCH CONN TO PIPE PIPE TO FLANGE PENT. N-7D TO PIPE NOZZ TO TRANS PIECE PIPE TO ELBOW NOZZ TO TRANS PIECE PIPE TO ELBOW ELBOW TO PIPE PIPE TO ELBOW BRANCH CONN TO PIPE PIPE TO FLANGE BRANCH CONN TO PIPE PIPE TO FLANGE B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.31 B9.31 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, & UT MT or PT, & UT EXAM CAT ITEM NO Page 8 of 39 NDE METHOD OUTAGE REMARKS 1-BSD-1 I-BSD-2 I-BSE-1 I-BSE-2 1-A-14 l-B-17 1-C-15 1-C-17 I-C-7/CSA I-C-7/CSC 1-C-9 1-CSA-1 1-CSC-1 I -CSC-2 1-D-14 I-C-1 I -C-3 1-D-I l-D-3 1-D-7 l-D-9 1-DSG-1 1-DSG-2 I-ASC-I I-ASC-2 2R14 2R14 2R14 2R14 2R15 2R15 2R15 2R15 2R 15 2R15 2R15 2R15 2R15 2R15 2R15 2R16 2R16 2R16 2R16 2R16 2R16 2R16 2R16 2R17 2R17

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS SYSTEM MAIN STEAM COMPONENT DESC I

BRANCH CONN TO PIPE PIPE TO FLANGE INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT SPRING HANGER SPRING HANGER RIGID RESTRAINT SPRING HANGER HYDRAULIC SNUBBER SPRING HANGER SPRING HANGER ANCHOR SPRING HANGER SPRING HANGER B-J B-J B-K B-K B-K B-K F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A B9.11 B9.11 B10.20 B110.20 B110.20 B10.20 FI.10 FI.10 FI.10 FL.10 FI.10 FI.10 FI.10 F1.10 FI.10 FI.10 MT or PT, & UT MT or PT, & UT MT or PT, or UT MT or PT, or UT MT or PT, or UT MT or PT, or UT VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 SYSTEM REACTOR CORE ISOLATION COOLING PIPE TO TEE PIPE TO PIPE B-J B-J B9.11 B9.11 MT or PT, and UT MT or PT, and UT.

EXAM CAT ITEM NO Page 9 of 39 NDE METHOD OUTAGE 1-ASG-1 I-ASG-2 HBI(IA)

HCI(IA)

HC2(IA)

HD4(IA)

REMARKS HA2 HA4 GB1 HB1 SSB3 HCI HC2 N-7B HD3 HD4 2R17 2R17 2R14 2R15 2R15 2R16 2R13 2R13 2R14 2R14 2R14 2R15 2R15 2R15 2R16 2R16 13-1-6 13-1-801 2R15 2R15

SCHEDULE DATE - 3/29/02 REVISION - 1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 1

SYSTEM REACTOR CORE ISOLATION COOLING 13MO-H79 SPRING HANGER SYSTEM REACTOR DRAIN 4-RD-24 PIPE TO ELBOW 4-RD-20 VALVE TO PIPE 4-RD-21 PIPE TO VALVE 4-RD-25 ELBOW TO PIPE 4-RD-26 PIPE TO ELBOW 4-RD-802 FLOW ELEMENT TO PIPE BND 4-RD-11 ELBOW TO PIPE 4-RD-12 PIPE TO ELBOW 4-RD-13 ELBOW TO PIPE BND 4-RD-16 PIPE TO ELBOW 4-RD-22 TEE TO PIPE PG-IC RIGID RESTRAINT PH-87 SPRING HANGER PG-32 RIGID RESTRAINT EXAM CAT ITEM NO Page 10 of 39 NDE METHOD OUTAGE REMARKS F-A Fl.10 B-F B-J B-i B-J B-J B-J B-J B-J B-J B-J B-J F-A F-A F-A VT-3 MT or PT MT or PT MT or PT MT or PT PT PT PT PT MT or PT MT or PT VT-3 VT-3 VT-3 B5.140 B9.40 B9.40 B9.40 B9.40 B9 21 B9.40 B9.40 B9.40 B9.40 B9.40 F1.10 F1.10 FI.10 2R15 2R13 2R 13 2R13 2R13 2R13 2R 15 2R17 2R 17 2R 17 2R17 2R17 2R13 2R 13 2R 17

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 1

SYSTEM REACTOR PRESSURE VESSEL CH-C-1 DOLLAR PLATE WELD CH-MA AT 0 DEG.

CH-MB AT 60 DEG.

CH-MC AT 120 DEG.

CH-MD AT 180 DEG.

CH-ME AT 240 DEG.

CH-MF AT 300 DEG.

RPV-C6 SHL CRS NO. 5 TO FLANGE RPV-MA BR MERID @ 0 DEG.

RPV-MB BH MERID @ 60 DEG.

RPV-MC BR MERID @ 120 DEG.

RPV-MD BH MERID @ 180 DEG.

RPV-ME BR MERID @ 240 DEG.

RPV-MF BH MERID @ 300 DEG.

RPV-C6 SHL CRS NO. 5 TO FLANGE CH-NA NOZZLE N6A CH-NA-IRS NOZZLE N6A CH-NB NOZZLE N7 CH-NB-IRS NOZZLE N7 CH-NC NOZZLE N6B CH-NC-IRS NOZZLE N6B NIA MAIN RECIRC OUT NOZ EXAM CAT ITEM NO Page 11 of 39 NDE METHOD OUTAGE REMARKS B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-D B-D B-D B-D B-D B-D B-D B 1.21 B 1.22 B11.22 B 1.22 B 1.22 B 1.22 B 1.22 B11.30 B11.22 B 1.22 B 1.22 B 1.22 B11.22 B 1.22 B11.30 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT 2R14 2R14 2R14 2R14 2R14 2R14 2R14 2R 14 2R14 2R14 2R15 2R15 2R16 2R16 2R17 2R14 2R14 2R14 2R 14 2R14 2R14 2R14 Partial Exam Partial Exam

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 1

SYSTEM REACTOR PRESSURE VESSEL NIA-IRS MAIN RECIRC OUT NOZ N2A MAIN RECIRC IN NOZ N2A-IRS MAIN RECIRC IN NOZ N2B MAIN RECIRC IN NOZ N2B-IRS MAIN RECIRC IN NOZ N2C MAIN RECIRC IN NOZ N2C-IRS MAIN RECIRC IN NOZ N3A MAIN STEAM NOZZLE N3A-IRS MAIN STEAM NOZZLE N3B MAIN STEAM NOZZLE N3B-IRS MAIN STEAM NOZZLE N4A FEEDWATER NOZZLE N4A-IRS FEEDWATER NOZZLE N4B FEEDWATER NOZZLE N4B-IRS FEEDWATER NOZZLE N4C FEEDWATER NOZZLE N4C-IRS FEEDWATER NOZZLE N8A JET PUMP INSTR NOZZ N8A-IRS JET PUMP INSTR NOZZ NI0 SLC NOZZLE TO VESSEL WELD NIB MAIN RECIRC OUT NOZ NIB-IRS MAIN RECIRC OUT NOZ N2D MAIN RECIRC IN NOZ N2D-IRS MAIN RECIRC IN NOZ N2E MAIN RECIRC IN NOZ EXAM CAT ITEM NO Page 12 of 39 NDE METHOD OUTAGE REMARKS B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3. 100 B3.90 B3. 100 B3.90 B3. 100 B3.90 B3.100 B3.90 B3.90 B3.100 B3.90 B3.100 B3.90 UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT 2R14 2R14 2R 14 2R14 2R14 2R14 2R 14 2R 14 2R14 2R14 2R14 2R14 2R14 2R14 2R14 2R14 2R 14 2R 14 2R1 4 2R15 2R15 2R15 2R15 2R15 2R15

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC I

SYSTEM REACTOR PRESSURE VESSEL N2E-IRS MAIN RECIRC IN NOZ N2F MAIN RECIRC IN NOZ N2F-IRS MAIN RECIRC IN NOZ N4D FEEDWATER NOZZLE N4D-IRS FEEDWATER NOZZLE N4E FEEDWATER NOZZLE N4E-IRS FEEDWATER NOZZLE N4F FEEDWATER NOZZLE N4F-IRS FEEDWATER NOZZLE N5A CORE SPRAY NOZZLE N5A-IRS CORE SPRAY NOZZLE N9 CRD NOZZLE N9-IRS CRD NOZZLE N2G MAIN REC1RC IN NOZ N2G-IRS MAIN RECIRC IN NOZ N2H MAIN RECIRC IN NOZ N2H-IRS MAIN RECIRC IN NOZ N2J MAIN RECIRC IN NOZ N2J-IRS MAIN RECIRC IN NOZ N2K MAIN RECIRC IN NOZ N2K-IRS MAIN RECIRC IN NOZ N3C MAIN STEAM NOZZLE N3C-IRS MAIN STEAM NOZZLE N3D MAIN STEAM NOZZLE N3D-IRS MAIN STEAM NOZZLE EXAM CAT ITEM NO Page 13 of 39 NDE METHOD OUTAGE REMARKS B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 83.100 B3.90 83.100 B3.90 B3.100 B3.90 83.100 B3.90 83.100 B3.90 83.100 B3.90 83.100 B3.90 13.3100 B3.90 B3.100 UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT 2R15 2R15S 2R15 2R15 2R 15 2R15 2R15 2R15 2R15 2R15 2R 15 2R15 2R15 2R 16 2R 16 2R 16 2R16 2R16 2R16 2R16 2R16 2R 16 2R16 2R 16 2R16

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 1

SYSTEM REACTOR PRESSURE VESSEL N5B CORE SPRAY NOZZLE N5B-IRS CORE SPRAY NOZZLE N8B JET PUMP INSTR NOZZ N8B-IRS JET PUMP INSTR NOZZ CRD NOZZLES INSTR NOZZ VESSEL NOZZLES 4-NiIA-i 4-Ni6A-1 4-N10-1 4-NI1B-1 4-Ni6B-I 14-A-27 14-B-27 2-AS-1 2-BHA-8 2-BHB-8 2-BHC-8 2-BS-1 3-1-19R CRD NOZZLES N1iA,B N12A,B N16A,B N15,IN-CORE PROBES N1IA NOZ TO SAFE END N 16A NOZ TO SAFE END N 10 NOZ TO SF-END NIlB NOZTO SAFE END NI6B NOZTO SAFE END SAFE-END TO NOZ N5A SAFE-END TO NOZ N5B SAFE-END TO NOZ NIA SAFE-END TO NOZ N2A SAFE-END TO NOZ N2B SAFE-END TO NOZ N2C SAFE-END TO NOZ NiB NOZZLE N9 TO CAP EXAM CAT ITEM NO Page 14 of 39 NDE METHOD OUTAGE REMARKS B-D B-D B-D B-D B-E B-E B-E B-F B-F B-F B-F B-F B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B -F-X B-F-X B3.90 B3.100 B3.90 B3.100 B4.12 B4.13 B4.11 B5.20 B5.20 B5.20 B5.20 B5.20 B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X UT UT UT UT VT-2 VT-2 VT-2 PT PT PT, and UT PT PT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT 2R16 2R16 2R16 2R 16 2R15 2R15 2R15 2R14 2R14 2R15 2R15 2R16 2R14 2R 14 2R14 2R14 2R14 2R 14 2R14 2R14

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC I

SYSTEM REACTOR PRESSURE VESSEL JP-A-6 2-AHF-8 2-BHD-8 2-BHE-8 14-A-27 14-B-27 2-AHG-8 2-AHH-8 2-AHJ-8 2-AHK-8 2-AS-1 2-BS-1 3-I-19R JP-B-6 STUDS 1-92 (BUSHNGS)

STUDS 1-92 (INPLACE)

STUDS 1-92 (LG WSHR)

STUDS 1-92 (NUTS)

STUDS 1-92 (REMOVED)

STUDS 1-92 (SM WSHR)

STUDS 1-92 (THREADS)

STUDS 1-92 (BUSHNGS)

STUDS 1-92 (INPLACE)

N8A NOZ TO SF-END SAFE-END TO NOZ N2F SAFE-END TO NOZ N2D SAFE-END TO NOZ N2E SAFE-END TO NOZ N5A SAFE-END TO NOZ N5B SAFE-END TO NOZ N2G SAFE-END TO NOZ N2H SAFE-END TO NOZ N2J SAFE-END TO NOZ N2K SAFE-END TO NOZ NIA SAFE-END TO NOZ N I B NOZZLE N9 TO CAP N8B NOZ TO SF-END CH BUSHINGS CH STUDS IN PLACE CH WASHERS, LARGE CH NUTS CH STUDS WHEN REMOVED CH WASHERS,SMALL THREADS IN FLANGE CH BUSHINGS CH STUDS IN PLACE B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-G-1 B-G-1 B-G-1 B-G-1 B-G-1 B-G-1 B-G-I B-G-I B-G-I B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B6.50 B6.20 B6.50 B6.10 B6.30 B6.50 B6.40 B6.50 B6.20 PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT VT-I UT VT-I UT*

MT or PT, and UT VT-i UT VT-i UT 2R14 2R15 2R15 2R15 2R16 2R16 2R16 2R 16 2R16 2R16 2R16 2R16 2R116 2R16 2R 14 2R14 2R 14 2R14 2R14 2R14 2R14 2R16 2R16 88-01 Exam Only (no ASME XI credit) 88-01 Exam Only (no ASME XI credit) 88-01 Exam Only (no ASME XI credit) 88-01 Exam Only (no ASME XI credit) 88-01 Exam Only (no ASME XI credit)

EXAM CAT ITEM NO Page 15 of 39 NDE METHOD OUTAGE REMARKS

SCHEDULE DATE -3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 1

SYSTEM REACTOR PRESSURE VESSEL STUDS 1-92 (LG WSHR)

STUDS 1-92 (NUTS)

STUDS 1-92 (SM WSHR)

STUDS 1-92 (THREADS)

CRD HOUSING BOLTING N-A-1FB N-B-I FB N-C-I FB 4-N 16A-2 N-B-I 4-NIO-2 JP-A-7 JP-B-7 SUPPORT-I (IA)

SUPPORT-2(IA)

SUPPORT-3(IA)

SUPPORT-4(IA)

SUPPORT-5(IA)

SUPPORT-6(IA)

CH WASHERS, LARGE CH NUTS CH WASHERS,SMALL THREADS IN FLANGE FLANGE BOLTING N6A FLANGE BOLTING N7 FLANGE BOLTING N6B FLANGE BOLTING SAFE END TO REDUCER N7 NOZZLE TO FLANGE SAFE-END TO TEE SAFE-END TO PEN SEAL SAFE-END TO PEN SEAL STAB BAR @ 0 DEG STAB BAR @ 45 DEG STAB BAR @ 90 DEG STAB BAR @ 135 DEG STAB BAR @ 180 DEG STAB BAR @ 225 DEG B-G-I B-G-1 B-G-I B-G-I B-G-2 B-G-2 B-G-2 B-G-2 B-J B-J B-J B-J-X B-J-X B-K B-K B-K B-K B-K B-K B6.50 B6.10 B6.50 B6.40 B7.80 B7.50 B7.50 B7.50 B9.40 B9.11 B9.21 B9.11-X B9.11 -X B110.10 B110.10 B110.10 B110.10 B10.10 B10.10 VT-I UT*

VT-i UT VT-i VT-i VT-I VT-I PT MT or PT, and UT PT MT or PT, and UT MT or PT, and UT MT or PT, or UT MT or PT, or UT MT or PT, or UT MT or PT, or UT MT or PT, or UT MT or PT, or UT EXAM CAT ITEM NO Page 16 of 39 NDE METHOD OUTAGE REMARKS Disassembly 2R16 2R116 2R16 2R16 2R13 2R114 2R14 2R14 2R14 2R14 2R15 2R14 2R16 2R14 2R 14 2R14 2R15 2R15 2R16

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC I

SYSTEM REACTOR PRESSURE VESSEL SUPPORT-7(IA)

RPV-SK SUPPORT-8(IA)

VESSEL INTERIOR VESSEL INTERIOR VESSEL INTERIOR CS HDR BKT WLD 15AZ CS HDR BKT WLD 117AZ CS HDR BKT WLD 123AZ CS HDR BKT WLD 165AZ CS HDR BKT WLD 243AZ CS HDR BKT WLD 345AZ SHRD SUP PLT WLD H-9 CS HDR BKT WLD 195AZ CS HDR BKT WLD 237AZ DRYER BKT WLD 184AZ DRYER BKT WLD 274AZ J P 01/02 BRACE ARM J P 03/04 BRACE ARM J P 05/06 BRACE ARM J P 07/08 BRACE ARM J P 09/10 BRACE ARM STAB BAR @ 270 DEG SUPPORT SKIRT WELD STAB BAR @ 315 DEG RPV INTERIOR RPV INTERIOR RPV INTERIOR MAG-CG-408, 7.6.6.

MAG-CG-408 7.6.6.

MAG-CG-408, 7.6.6.

MAG-CG-408, 7.6.6.

MAG-CG-408, 7.6.6.

MAG-CG-408, 7.6.6.

MAG-CG-408, 7.5.8.2.

MAG-CG-408, 7.6.6.

MAG-CG-408, 7.6.6.

MAG-CG-408, 7.3.10.

MAG-CG-408, 7.3.10.

MAG-CG-408 7.4.9.

MAG-CG-408, 7.4.9.

MAG-CG-408, 7.4.9.

MAG-CG-408, 7.4.9.

MAG-CG-408, 7.4.9.

B-K B-K B-K B-N-i B-N-1 B-N-i B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B10.10 B10.10 B10.10 B13.10 B13.10 B13.10 B13.30 B 13.30 B 13.30 B 13.30 B13.30 B 13.30 B13.30 B 13.30 B 13.30 B 13.30 B 13.30 B 13.20 B 13.20 B 13.20 B 13.20 B 13.20 MT or PT, or UT MT or PT, or UT MT or PT, or UT VT-3 VT-3 VT-3 VT-I VT-I VT-1 VT-i VT-1 VT-i VT-3 VT-I VT-I VT-3 VT-3 VT-i VT-i VT-I VT-I VT-i EXAM CAT ITEM NO Page 17 of 39 NDE METHOD OUTAGE REMARKS 2R16 2R 17 2R17 2R14 2R15 2R17 2R13 2R13 2R13 2R13 2R13 2R13 2R13 2R14 2R14 2R14 2R 14 2R14 2R14 2R14 2R14 2R14 Partial Exam

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 1

SYSTEM REACTOR PRESSURE VESSEL SHRD SUP PLT WLD H-9 SURVL LBKT WLD 30AZ SURVL LBKT WLD 120AZ FW SPG BKT WLD 5AZ FW SPG BKT WLD 55AZ FW SPG BKT WLD 65AZ FW SPG BKT WLD 115AZ FW SPG BKT WLD 125AZ FW SPG BKT WLD 175AZ J P 11/12 BRACE ARM J P 13/14 BRACE ARM J P 15/16 BRACE ARM J P 17/18 BRACE ARM J P 19/20 BRACE ARM SURVL LBKT WLD 300AZ DRYER BKTWLD 4AZ DRYER BKT WLD 94AZ FW SPG BKT WLD 185AZ FW SPG BKT WLD 225AZ FW SPG BKT WLD 245AZ FW SPG BKT WLD 295AZ FW SPG BKT WLD 305AZ FW SPG BKT WLD 335AZ CORE PLATE/SUP BOLTS CRD HOUSING MAG-CG-408, 7.5.8.2.

MAG-CG-408, 7.4.20.

MAG-CG-408, 7.4.20.

N4A SPARGER MAG-CG-408, 7.3.7.

N4A SPARGER MAG-CG-408, 7.3.7.

N4B SPARGER MAG-CG-408,7.3.7.

N4B SPARGER MAG-CG-408,7.3.7.

N4C SPARGER MAG-CG-408, 7.3.7.

N4C SPARGER MAG-CG-408, 7.3.7.

MAG-CG-408, 7.4.9.

MAG-CG-408, 7.4.9.

MAG-CG-408, 7.4.9.

MAG-CG-408, 7.4.9.

MAG-CG-408, 7.4.9.

MAG-CG-408, 7.4.20.

MAG-CG-408, 7.3.10.

MAG-CG-408, 7.3.10.

N4D SPARGER MAG-CG-408, 7.3.7.

N4D SPARGER MAG-CG-408, 7.3.7.

N4E SPARGER MAG-CG-408, 7.3.7.

N4E SPARGER MAG-CG-408, 7.3.7.

N4F SPARGER MAG-CG-408, 7.3.7.

N4F SPARGER MAG-CG-408, 7.3.7.

MAG-CG-408, 7.5.6.5, 7.5.7.3.

MAG-CG-408, 7.5.6, -.7, -.8.

EXAM CAT ITEM NO Page 18 of 39 NDE METHOD OUTAGE REMARKS Partial Exam B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B 13.30 B 13.20 B 13.20 B13.30 B13.30 B13.30 B13.30 B13.30 B13.30 B13.20 B 13.20 B 13.20 B 13.20 B 13.20 B 13.20 B 13.30 B 13.30 B 13.30 B 13.30 B13.30 B 13.30 B13.30 B 13.30 B 13.40 B 13.40 VT-3 VT-I VT-i VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-i VT-1 VT-I VT-I VT-i VT-i VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 2R14 2R14 2R14 2R15 2R15 2R15 2R15 2R15 2R15 2R15 2R15 2R15 2R15 2R15 2R15 2R16 2R 16 2R 16 2R16 2R16 2R16 2R16 2R16 2R 17 2R17

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC I

SYSTEM REACTOR PRESSURE VESSEL DHDB-I 41.5 AZ DHDB-2 138.5 AZ DHDB-3 221.5 AZ DHDB-4 318.5 AZ GD RD LBKT WLD OAZ GD RD LBKT WLD 180AZ GD RD UBKTWLD 0AZ GD RD UBKT WLD 180AZ ORIFICED FUEL SUP PERIPHERAL FUEL SUP SHROUD SHROUD SUPPORT SURVL UBKT WLD 30AZ SURVL UBKTWLD 120AZ SURVL UBKT WLD 300AZ RPV PT RPV PT RPV HT SLC CL I HT RPV PT RPV PT DRYER HOLD-DOWN BRKT WELD DRYER HOLD-DOWN BRKT WELD DRYER HOLD-DOWN BRKT WELD DRYER HOLD-DOWN BRKT WELD MAG-CG-408, 7.3.6.

MAG-CG-408, 7.3.6.

MAG-CG-408, 7.3.6.

MAG-CG-408, 7.3.6.

MAG-CG-408, 7.5.7.

MAG-CG-408, 7.5.6.

SHROUD MAG-CG-408, 7.5.8.2.

MAG-CG-408, 7.4.20.

MAG-CG-408, 7.4.20.

MAG-CG-408, 7.4.20.

SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PARTIAL HYDRO TEST SYSTEM PARTIAL HYDRO TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-P B-P B-P B-P B-P B-P B 13.30 B 13.30 B13.30 B 13.30 B13.30 B13.30 B13.30 B 13.30 B 13.40 B 13.40 B 13.40 B 13.40 B13.20 B13.20 B13.20 B15.XX 81 5.XX B15.XX B1I5.XX 81 5.XX B15.XX VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-i VT-i VT-1 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 2R 17 2R17 2R17 2R17 2R17 2R17 2R17 2R17 2R17 2R17 2R17 2R17 2R17 2R17 2R17 2R13 2R14 2R15 2R15 2R16 2R17 2R13 RPV-SK(SC)

SUPPORT SKIRT Work With SLC CL 1 HT EXAM CAT ITEM NO Page 19 of 39 NDE METHOD OUTAGE REMARKS F-A F1.40 VT-3

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 1

SYSTEM REACTOR PRESSURE VESSEL SUPPORT-I STAB BAR @ 0 DEG SUPPORT-2 STAB BAR @ 45 DEG SUPPORT-3 STAB BAR @ 90 DEG SUPPORT-4 STAB BAR @ 135 DEG SUPPORT-5 STAB BAR @ 180 DEG SUPPORT-6 STAB BAR @ 225 DEG SUPPORT-7 STAB BAR @ 270 DEG SUPPORT-8 STAB BAR @ 315 DEG SYSTEM REACTOR WATER CLEAN-UP VALVE TO ELBOW VALVE TO ELBOW ELBOW TO PIPE PIPE TO NIPPOLET VALVE TO PIPE PIPE TO ELBOW ELBOW TO PIPE PIPE TO VALVE PIPE TO VALVE VALVE TO PIPE B-F-X B-F-X B-J B-J B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B5.130-X B5.130-X B9.11 B9.32 B9.1 1-X B9.11-X B9.11 -X B9.1 I-X B9.1 1-X B9.11-X PT, and UT PT, and UT MT or PT, and UT PT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT 2R14 2R16 2R14 2R15 2R 14 2R 14 2R14 2R 14 2R14 2R14 88-01 Exam Only (no ASME XI credit)

EXAM CAT ITEM NO Page 20 of 39 NDE METHOD OUTAGE REMARKS F-A F-A F-A F-A F-A F-A F-A F-A F1.40 F1.40 F1.40 F1.40 F1.40 F1.40 F1.40 F1.40 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 2R13 2R13 2R15 2R15 2R16 2R16 2R17 12-1-2 12-1-2 12-1-3 12-0-22/4-RD 12-I-1 12-I-1A 12-1-1B 12-1-IC 12-1-1D 12-1-1E

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 1

SYSTEM REACTOR WATER CLEAN-UP BRANCH CONN TO PIPE ELBOW TO PIPE PIPE TO ELBOW ELBOW TO PIPE PIPE TO ELBOW ELBOW TO PIPE PENT N-14 TO PIPE VALVE TO PIPE PIPE TO ELBOW ELBOW TO PIPE PIPE TO VALVE PIPE TO VALVE VALVE TO PIPE 12DCN-H 152(IA) 12DCN-H152 12DE-H33 12DCN-H150 N-14 INTEGRAL ATTACHMENT SPRING HANGER SPRING HANGER SPRING HANGER ANCHOR B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-K F-A F-A F-A F-A B9. 1-X B9.I1-X B9.1 1-X B9.11-X B9.I -X B9.11-X B9.11-X B9.11-X B9.11-X B9.11-X B9.11-X B9.11-X B9.I -X B10.20 F1.10 F7.10 Fl.10 Fl.10 PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT VT-3 VT-3 VT-3 VT-3 2R 14 2R15 2R15 2R15 2R15 2R115 2R15 2R16 2R16 2R16 2R16 2R16 2R16 2R14 2R14 2R14 2R15 2R15 88-01 Exam Only (no ASME XI credit) 88-01 Exam Only (no ASME XI credit) 88-01 Exam Only (no ASME XI credit) 88-01 Exam Only (no ASME XI credit) 88-01 Exam Only (no ASME XI credit) 88-01 Exam Only (no ASME X1 credit)

EXAM CAT ITEM NO Page 21 of 39 NDE METHOD OUTAGE REMARKS 12-O-20A 12-0-25 12-0-26 12-0-27 12-0-30 12-0-31 12-0-35 12-1-1 12-I-IA 12-I-lB 12-I-IC 12-I-ID 12-I-IE

SCHEDULE DATE -3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 1

SYSTEM RESIDUAL HEAT REMOVAL 10-0-17 PENT TO PIPE 10-0-34 PIPE TO ELBOW 10-0-26 ELBOW TO PIPE 10-0-29 PIPE TO ELBOW 10-0-31 PIPE TO PIPE 10-IB-22 ELBOW TO PIPE 10-IB-25 PIPE TO TEE 10-IA-22 ELBOW TO PIPE 10-IA-25 PIPE TO TEE 10-0-27 10-0-35 10-IB-2 10-IA-15 I0-IA-2 10-0-23 1ODCN-H 152 N-12 B-F B-F B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X PIPE TO VALVE ELBOW TO PENT VALVE TO PENETRATION PENT TO ELBOW VALVE TO PENETRATION PIPE TO ELBOW SPRING HANGER ANCHOR B-J B-J B-J B-J B-J B-J-X F-A F-A B5. 130 B5.130 B5.130-X B5.130-X B5.130-X B5.130-X B5.130-X B5.130-X B5.130-X B9.11 B9.11 B9.11 B9.11 B9.11 B9.1 I-X FI.10 FI.10 PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT MT or PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT PT, and UT VT-3 VT-3 EXAM CAT ITEM NO Page 22 of 39 NDE METHOD OUTAGE REMARKS 2R14 2R14 2R14 2R14 2R14 2R15 2R15 2R16 2R16 2R14 2R14 2R15 2R16 2R16 2R 14 2R14 2R14

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 1

SYSTEM RESIDUAL HEAT REMOVAL IODE-H130A SPRING HANGER N-13B ANCHOR NUMBER OF CLASS: 1 ASME XI CODE CLASS COMPONENTS 2

SYSTEM CONTAINMENT ATMOSHPERE CONTROL SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM CONTAINMENT ATMOSPHERE DILUTION A CAD DW PT A CAD Torus PT B CAD DW PT B CAD Torus PT A CAD DW PT A CAD Torus PT SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST EXAM CAT ITEM NO Page 23 of 39 NDE METHOD OUTAGE F-A F-A REMARKS F1.10 FI.10 VT-3 VT-3 450 2R16 2R16 Torus Purge PT Instr N2 PT Instr N2 PT Torus Purge PT Instr N2 PT Torus Purge PT C-H C-H C-H C-H C-H C-H C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 2R13 2R 14 2R15 2R15 2R16 2R16 C-H C-H C-H C-H C-H C-H C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 2R13 2R13 2R13 2R13 2R15 2R15

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT DESC 2

SYSTEM CONTAINMENT ATMOSPHERE DILUTION B CAD DW PT B CAD Torus PT A CAD DW PT A CAD Torus PT B CAD DW PT B CAD Torus PT SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM CORE SPRAY INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT VALVE TO PIPE PIPE TO ELBOW ELBOW TO ELBOW ELBOW TO PIPE PUMP TO PIPE ELBOW TO PIPE PIPE TO VALVE PIPE TO ELBOW PIPE TO PUMP ELBOW TO ELBOW TEE TO REDUCER C-C C-C C-C C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C3.20 C3.20 C3.20 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 MT or PT MT, or PT MT, or PT MT or PT, and UT MT or PT. and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT COMPONENT ID ASME XI CODE CLASS EXAM CAT ITEM NO Page 24 of 39 NDE METHOD OUTAGE REMARKS C-H C-H C-H C-H C-H C-H C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 2R15 2R15 2R16 2R 16 2R16 2R 16 14GB-H47(IA) 14HB-HIO(IA)

!4HB-H5(IA) 14-2DA12-6 14-2TSA16-10 14-2TSA16-8 14-2TSA16-9 14-2DB 12-1 14-2DB12-3 14-2TSB14-15 14-2DAC14-12 14-2TSC16-16 14-2TSC16-5 14-2DBDI4-7 2R13 2R14 2R 14 2R13 2R13 2R13 2R13 2R 14 2R14 2R14 2R15 2R15 2R15 2R16

SCHEDULE DATE - 3/29/02 REVISION-I PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS SYSTEM CORE SPRAY COMPONENT DESC 2

PIPE TO ELBOW PIPE TO ELBOW C-F-2 C-F-2 SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST 14-2DBD14-9 14-2DDI 2-7 A CS PT B CS PT A CS PT B CS PT A CS PT B CS PT 14GB-H47 14HB-HI 14HB-H3 14GB-H35 14GB-H46 14HB-HIO 14GB-H42 14HB-S31 14MO-H48 14GB-H40 14GB-S10 C-H C-H C-H C-H C-H C-H F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A C5.51 C5.51 C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX F1.20 F1.20 F1.20 FI.20 FI.20 FI.20 F1.20 11.20 F1.20 F1.20 F1.20 MT or PT, and UT MT or PT, and UT VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 EXAM CAT ITEM NO Page 25 of 39 NDE METHOD OUTAGE REMARKS SPRING HANGER SPRING HANGER SPRING HANGER RIGID RESTRAINT SPRING HANGER SPRING HANGER RIGID RESTRAINT RIGID RESTRAINT SPRING HANGER SPRING HANGER RIGID RESTRAINT 2R16 2R16 2R13 2R13 2R15 2R15 2R 17 2R17 2R13 2R13 2R13 2R14 2R14 2R14 2R15 2R 15 2R15 2R16 2R16

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 2

SYSTEM HIGH PRESSURE COOLANT INJECTION INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT ELBOW TO FLANGE PENETRATION TO ELBOW ELBOW TO PIPE FLANGE TO TEE PIPE TO TEE VALVE TO REDUCER PIPE TO ELBOW ELBOW TO PIPE PIPE TO FLANGE ELBOW TO PIPE PIPE TO ELBOW ELBOW TO PIPE SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST C-C C-C C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-H C-H C-H C-H C3.20 C3.20 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C7.XX C7.XX C7.XX C7.XX MT or PT MT, or PT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT VT-2 VT-2 VT-2 VT-2 23DDN-H9 SPRING HANGER EXAM CAT ITEM NO Page 26 of 39 NDE METHOD OUTAGE REMARKS 23DBN-S29(IA) 23DDN-H8(IA) 23-2TS 12-29 23-2TS 16-1 23-2TS16-14 23-2TE 18-1 23-2TE20-17 23-2TI24-1 23-0-29 23-0-36 23-0-46 23-2D14-19 23-2D14-24 23-21314-4 HPCI PT HPCI PT HPCI PT HPCI PT 2R16 2R17 2R14 2R14 2R14 2R15 2R15 2R15 2R16 2R 16 2R16 2R17 2R17 2R17 2R13 2R13 2R15 2R 16 2R14 Partial Exam Partial Exam F-A F1.20 VT-3

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 2

SYSTEM HIGH PRESSURE COOLANT INJECTION 23DDN-S25 HYDRAULIC SNUBBER 23HB-H31 SPRING HANGER 23HB-S13 RIGID RESTRAINT 23DBN-H39 SPRING HANGER 23DBN-S27 HYDRAULIC SNUBBER 23DBN-H55 RIGID RESTRAINT 23HB-H34 RIGID RESTRAINT 23HB-H35 SPRING HANGER 23DDN-H8 RIGID RESTRAINT 23DDN-S6 RIGID RESTRAINT SYSTEM MAIN STEAM IDB-H35(IA)

INTEGRAL ATTACHMENT 7DB-H75(IA)

INTEGRAL ATTACHMENT 1-2A26-26 1-2A26-30 1-2B26-31 1-2B26-34 1-2C26-34 1-2D26-16BC I -2D26-30 1-2MSA 14-2 ELBOW TO PIPE PIPE TO VALVE PIPE TO ELBOW PIPE TO VALVE PIPE TO VALVE BRANCH CONNECTION PIPE TO VALVE PIPE TO ELBOW F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F1.20 FI.20 F1.20 F1.20 FI.20 F1.20 FI.20 F1.20 FI.20 F1.20 C-C C-C C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C3.20 C3.20 C5.51.

C5.51 C5.51 C5.51 C5.51 C5.81 C5.51 C5.51 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 MT, or PT MT, or PT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT MT or PT, and UT MT or PT, and UT EXAM CAT ITEM NO Page 27 of 39 NDE METHOD OUTAGE REMARKS 2R 14 2R14 2R 14 2R15 2R15 2R16 2R 16 2RI6 2R 17 2R17 2R14 2R16 2RI4 2R 14 2R14 2R14 2R15 2R15 2RI5 2R15

SCHEDULE DATE - 3/29/02 REVISION - 1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS SYSTEM MAIN STEAM COMPONENT DESC 2

C-F-2 C-F-2 C-F-2 ELBOW TO PIPE ELBOW TO MANIFOLD TEE TO ELBOW SPRING HANGER SPRING HANGER RIGID RESTRAINT SPRING HANGER SPRING HANGER SPRING HANGER RIGID RESTRAINT SPRING HANGER SPRING HANGER RIGID RESTRAINT SPRING HANGER F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A C5.51 C5.51 C5.51 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 MT or PT, and UT MT or PT, and UT MT or PT, and UT VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 SYSTEM REACTOR CORE ISOLATION COOLING SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST C-H C-H C-H C7.XX C7.XX C7.XX VT-2 VT-2 VT-2 EXAM CAT ITEM NO Page 28 of 39 NDE METHOD OUTAGE REMARKS 1-2MSA6-2 1-2MSA18-5 I-2MSB 14-1 LDB-H1I 1DB-H35 1DB-H9B 7DB-H74 1DB-H12 IDB-H167 IDB-H5 1DB-Hi0 1DB-HI3 lDB-H3 7DB-H75 2R15 2R16 2R16 2R14 2R14 2R14 2R14 2R 15 2R15 2R15 2R16 2R16 2R16 2R16 RCIC PT RCIC PT RCIC PT 2R13 2R15 2R16

SCHEDULE DATE - 3/29/02 REVISION - 1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 2

SYSTEM REACTOR PRESSURE VESSEL RPV Flange PT RPV Flange PT RPV Flange PT SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM RESIDUAL HEAT REMOVAL

!0-2HXA-1 10-2HXA-2 N3(RP)-A N3-A N4(RP)-A IOGB-H78(IA) 1OHB-H41A(IA)

IGB-H50(IA)

IOGB-H58(IA) 1OHB-H33(IA)

RHRHX-A-US 1 (IA) 1ODDN-H92(IA) 2BP35 UP SHL TO FLG RHRHX-A LW SHL-TO-FLG RHRHX-A IN NOZZ REINF PLATE INLET NOZZLE RHRHX-A OUT NOZZ REINF PLATE PIPE LUGS PIPE LUGS PIPE LUGS PIPE LUGS PIPE LUGS INTEGRAL ATTACHMENT PIPE LUGS PUMP SUPPORT WELD EXAM CAT ITEM NO Page 29 of 39 NDE METHOD OUTAGE REMARKS C-H C-H C-H C7.XX C7.XX C7.XX VT-2 VT-2 VT-2 2R114 2R15 2R16 C-A C-A C-B C-B C-B C-C C-C C-C C-C C-C C-C C-C C-C CI.10 CI.10 C2.31 C2.33 C2.31 C3.20 C3.20 C3.20 C3.20 C3.20 C3.10 C3.20 C3.30 UT UT MT or PT VT-2 MT or PT MT or PT MT or PT MT, or PT MT or PT MT or PT MT, or PT MT or PT MT, or PT 2R14 2R16 2R14 2R14 2R16 2R114 2R114 2R15 2R15 2R116 2R16 2R17 2R17

SCHEDULE DATE - 3/29/02 REVISION - 1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 2

SYSTEM RESIDUAL HEAT REMOVAL PUMP TO REDUCER VALVE TO PIPE TEE TO PIPE PIPE TO VALVE ELBOW TO PIPE TEE TO PIPE PIPE TO VALVE PIPE TO TEE ELBOW TO PIPE REDUCER TO NOZZLE PIPE TO ELBOW PIPE TO ELBOW ELBOW TO PIPE VALVE TO ELBOW NOZZLE TO REDUCER ELBOW TO VALVE PIPE TO ELBOW PENETRATION TO ELBOW ELBOW TO ELBOW TEE TO VALVE PIPE TO FLANGE PIPE TO ELBOW ELBOW TO PIPE PIPE TO FLANGE C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT EXAM CAT ITEM NO Page 30 of 39 NDE METHOD OUTAGE REMARKS 10-2DC18-1 10-2DC20-7 10-2SCS24-2 10-2TSC24-13 10-2XCO20-4 10-2CSIA12-22 10-2CSIAI2-23 10-2CSIA24-2 10-2DA20-6 10-2DA24-18 10-2TSA24-4 10-2XA020- 10 10-2XA020-11 10-2XA020-8 10-2XA024-1A 10-2DD20-8 10-2SCSD20-6 10-2TS D24-1 10-2TSD24-5 10-2XD018-1 10-2XD020-12 10-2CSIB24-24 10-2DB20-11 10-2DB20-8 2R14 2R14 2R14 2R14 2R14 2R15 2R 15 2R 15 2R15 2R15 2R15 2R15 2R15 2R15 2R15 2R16 2R16 2R16 2R16 2R16 2R 16 2R17 2R17 2R17

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 2

SYSTEM RESIDUAL HEAT REMOVAL 10-2FPCB 16-6 10-2FPCB 16-8 10-21B24-11 10-2SCSB24-3 10-2TIA18-16BC 10-2TSB24-12 10-2XBO20-3 A RHR PT B RHR PT A RHR PT B RHR PT A RHR DW Spray HT A RHR PT B RHR DW Spray HT B RHR PT RHR SDC HT 10GB-H 154A 10GB-H44 1 0GB-H45 1OGB-H60 1OGB-H61 IOGB-H62 ELBOW TO PIPE ELBOW TO PIPE PIPE TO VALVE PIPE TO PUMP 6" BRANCH CONN ELBOW TO PIPE PIPE TO ELBOW SYSTEM PRESS/PARTIAL HYDRO TEST SYSTEM PRESS/PARTIAL HYDRO TEST SYSTEM PRESS/PARTIAL HYDRO TEST SYSTEM PRESS/PARTIAL HYDRO TEST SYSTEM PARTIAL HYDRO TEST SYSTEM PRESS/PARTIAL HYDRO TEST SYSTEM PARTIAL HYDRO TEST SYSTEM PRESS/PARTIAL HYDRO TEST SYSTEM PARTIAL HYDRO TEST SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER RIGID RESTRAINT SPRING HANGER C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-H C-H C-H C-H C-H C-H C-H C-H C-H F-A F-A F-A F-A F-A F-A C5.51 C5.51 C5.51 C5.51 C5.81 C5.51 C5.51 C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX F1.20 F1.20 F1.20 F1.20 FI.20 F1.20 MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT MT or PT, and UT MT or PT, and UT VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 EXAM CAT ITEM NO Page 31 of 39 NDE METHOD OUTAGE REMARKS 2R 17 2R17 2R17 2R17 2R17 2R17 2R17 2R13 2R13 2R15 2R15 2R17 2R17 2R17 2R17 2R17 2R13 2R13 2R13 2R 14 2R 14 2R 14

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 2

SYSTEM RESIDUAL HEAT REMOVAL 10GB-H78 10GB-S56 10GB-S94 1OHB-H41A 10GB-H10 10GB-H50 I0GB-H51 10GB-H58 IOGB-S59 10GB-S93 IOHB-HlI IOHB-S2 I ODDN-H66A I0GB-HI31A 10GB-S105 10GB-S45 10HB-H33 1OHB-H4 10HB-S1 RHRHX-A-LS RHRHX-A-US 1 RHRHX-A-US2 I ODDN-H92 10GB-H 132 10GB-H 162 SPRING HANGER RIGID RESTRAINT RIGID RESTRAINT SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER ANCHOR RIGID RESTRAINT SPRING HANGER RIGID RESTRAINT SPRING HANGER SPRING HANGER RIGID RESTRAINT RIGID RESTRAINT SPRING HANGER SPRING HANGER HYDRAULIC SNUBBER LOWER SUPPORT UPPER SUPPORT I UPPER SUPPORT 2 SPRING HANGER SPRING HANGER SPRING HANGER EXAM CAT ITEM NO Page 32 of 39 NDE METHOD OUTAGE REMARKS F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.40 F1.40 F1.40 F1.20 F1.20 Fl 20 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 2R 14 2R14 2R 14 2R14 2R15 2R15 2R15 2R15 2R15 2R15 2R15 2R15 2R16 2R16 2R 16 2R16 2R16 2R16 2R16 2R 16 2R 16 2R16 2R 17 2R17 2R17

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 2

SYSTEM RESIDUAL HEAT REMOVAL 10GB-H47 SPRING HANGER 1OGB-H48 SPRING HANGER PUMP-B-SC SUPPORT COMPONENTS SYSTEM SCRAM DISCHARGE VOLUME TEE TO PIPE PIPE TO ELBOW ELBOW TO PIPE CIRCUMFERENTIAL WELD PIPE TO ELBOW ELBOW TO PIPE ELBOW TO PIPE SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT ANCHOR RIGID RESTRAINT C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-H C-H C-H F-A F-A F-A F-A F-A C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C7.XX C7.XX C7.XX F1.20 F1.20 F1.20 F1.20 Fl 20 MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT MT or PT, and UT VT-2 VT-2 VT-2 VT-3 VT-3 VT-3 VT-3 VT-3 EXAM CAT ITEM NO Page 33 of 39 NDE METHOD OUTAGE REMARKS F-A F-A F-A FI.20 F1.20 F1.40 VT-3 VT-3 VT-3 2R17 2R17 2R 17 3-2SSV6-13 3-2SSV6-20 3-2SSV6-4 3-2TSV12-1 3-2NSV6-18 3-2NSV6-3 3-2NSV6-8 SDV PT SDV PT SDV PT M-1747-S-2 M-1747-S-3 M-1747-S-9 S-48 M-1747-S-1 2R14 2R14 2R14 2R14 2R16 2R16 2R16 2R13 2R15 2R16 2R13 2R13 2R13 2R13 2R17

SCHEDULE DATE - 3/29/02 REVISION-1 COMPONENT ID ASME XI CODE CLASS PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT DESC EXAM CAT ITEM NO NDE METHOD Page 34 of 39 OUTAGE REMARKS 2

SYSTEM SCRAM DISCHARGE VOLUME M-1747-S-25A,B M-1747-S-28A,B M-1747-S-7 RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT SYSTEM STANDBY LIQUID CONTROL SLC PT SLC PT SLC HT SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM HYDRO TEST NUMBER OF CLASS: 2 ASME XI CODE CLASS 3

SYSTEM EMERGENCY COOLING WATER 48GB-SI 2(IA) 48GB-S 17(IA) 48GB-S32(IA) 48HB-H58(IA) 48HB-HF1 (IA) 48HB-HF2(IA) 48HB-S33(IA)

INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT F-A F-A F-A F1.20 F1.20 Fl 20 VT-3 VT-3 VT-3 2R17 2R17 2R17 C-H C-H C-H C7.XX C7.XX C7.XX COMPONENTS VT-2 VT-2 VT-2 218 2R14 2R15 2R17 D-A D-A D-A D-A D-A D-A D-A D1.20 D1.20 D1.20 D1.20 D1.20 D1.20 D1.20 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 2R15 2R15 2R15 2R15 2R15 2R15 2R15

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 3

SYSTEM EMERGENCY COOLING WATER ESW/ECW PT SYSTEM PRESSURE TEST ESW/ECW PT SYSTEM PRESSURE TEST ESW/ECW PT SYSTEM PRESSURE TEST 48GB-S 12 RIGID RESTRAINT 48GB-S 17 RIGID RESTRAINT 48GB-$23 GUIDE 48GB-$32 RIGID RESTRAINT 48HB-H58 RIGID RESTRAINT 48HB-HFI SPRING HANGER 48HB-HF2 SPRING HANGER 48HB-$33 RIGID RESTRAINT 48HB-HF3 RIGID RESTRAINT 48HB-HF3A RIGID RESTRAINT SYSTEM EMERGENCY SERVICE WATER 33HB-H 115(IA) 33HB-H148(IA) 33HB-S1I(IA) 33HB-$21 (IA)

INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT EXAM CAT ITEM NO Page 35 of 39 NDE METHOD OUTAGE REMARKS VT-2 VT-2 VT-2 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 D-B D-B D-B F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A D-A D-A D-A D-A 2RI4 2R 15 2RI6 2R15 2RI5 2R15 2RI5 2R15 2R15 2R15 2R15 2R16 2R16 D2.10 D2.10 D2.10 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 D1.20 D1.20 D1.20 D1.20 VT-3 VT-3 VT-3 VT-3 2R14 2R14 2R 14 2R14

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 3

SYSTEM EMERGENCY SERVICE WATER ESW PT SYSTEM PRESSURE TEST ESW PT SYSTEM PRESSURE TEST ESW PT SYSTEM PRESSURE TEST 33HB-HI 15 SPRING HANGER 33HB-H1 16 SPRING HANGER 33HB-H148 SPRING HANGER 33HB-S 1I RIGID RESTRAINT 33HB-S12 RIGID RESTRAINT 33HB-S 143 RIGID RESTRAINT 33HB-SIA RIGID RESTRAINT 33HB-$2 RIGID RESTRAINT 33HB-$21 RIGID RESTRAINT 33HB-$25 RIGID RESTRAINT 33HB-$30 RIGID RESTRAINT 33HB-S 133 RIGID RESTRAINT 33HB-S 134 RIGID RESTRAINT 33HB-$6 RIGID RESTRAINT 33HB-$65 RIGID RESTRAINT 33HB-$67 RIGID RESTRAINT 33HB-$68 RIGID RESTRAINT EXAM CAT ITEM NO Page 36 of 39 NDE METHOD OUTAGE REMARKS D-B D-B D-B F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A D2.10 D2.10 D2.10 Fl.30 F1.30 FI.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 Fl 30 F1.30 F1.30 F1.30 VT-2 VT-2 VT-2 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 2R 14 2R15 2R16 2R13 2R13 2R13 2R13 2R13 2R 13 2R13 2R13 2R13 2R13 2R13 2R14 2R14 2R 14 2R14 2R14 2R14

SCHEDULE DATE -3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 3

SYSTEM HIGH PRESSURE SERVICE WATER 32GB-S24(IA) 32GB-S25(IA) 32GB-S44(IA) 32GB-S48A(IA)

HPSW PT HPSW PT HPSW PT 32GB-$24 32GB-$25 32GB-$44 32GB-S48A 32GB-$2 32GB-S60 32MO-H55 32GB-HI9 32GB-H21 32GB-S19 32GB-$21 2CP42-SC 32GB-H28 INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT SPRING HANGER RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT PUMP SUPPORT SPRING HANGER EXAM CAT ITEM NO Page 37 of 39 NDE METHOD OUTAGE REMARKS D-A D-A D-A D-A D-B D-B D-B F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A D1.20 D1.20 D1.20 D1.20 D2.10 D2.10 D2.10 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.40 F1.30 VT-3 VT-3 VT-3 VT-3 VT-2 VT-2 VT-2 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 2R13 2R13 2R13 2R13 2R13 2R15 2R 16 2R13 2R13 2R13 2R13 2R14 2R 14 2R14 2R16 2R16 2R 16 2R16 2R 17 2R17

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 3

SYSTEM MAIN STEAM RELIEF VALVE IGG-H299(IA) 1GG-H313(IA)

IGG-S104(IA) 1GG-S210G(IA)

IGG-S63(IA) 1GG-H295(IA) 1GG-H315(IA) 1GG-S106(IA)

IGG-S210K(IA)

IGG-H299 IGG-H313 1GG-H671 1GG-S 104-A/B 1GG-S209-A/B 1GG-S210G IGG-S63 1GG-H295 1GG-H297 IGG-H315 IGG-H711 IGG-H713 1GG-S 106-A/B INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT SPRING HANGER SPRING HANGER GUIDE MECHANICAL SNUBBER MECHANICAL SNUBBER GUIDE HYDRAULIC SNUBBER SPRING HANGER SPRING HANGER SPRING HANGER GUIDE GUIDE MECHANICAL SNUBBER EXAM CAT ITEM NO Page 38 of 39 NDE METHOD OUTAGE REMARKS D-A D-A D-A D-A D-A D-A D-A D-A D-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A D1.20 D1.20 D1.20 D1.20 D1.20 D1.20 D1.20 D1.20 D1.20 F1.30 F1.30 FI.30 F1.30 F1.30 FI.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 2R16 2R 16 2R 16 2R16 2R16 2R17 2R17 2R17 2R17 2R 16 2R 16 2R16 2R16 2R16 2R16 2R16 2R17 2R17 2R17 2R17 2R17 2R17

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI Page 39 of 39 COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 3

SYSTEM MAIN STEAM RELIEF VALVE IGG-S201 lGG-S210K IGG-S35 NUMBER OF CL MECHANICAL SNUBBER GUIDE HYDRAULIC SNUBBER 4SS: 3 COMPONENTS EXAM CAT ITEM NO NDE METHOD OUTAGE REMARKS F-A F-A F-A F1.30 F1.30 F1.30 VT-3 VT-3 VT-3 89 2R17 2R17 2R17

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC I

SYSTEM CORE SPRAY 14-A-504 PIPE TO PIPE 14-B-11 PIPE TO PIPE 14-A-28 PIPE TO PIPE 14-B-28 PIPE TO PIPE 14-A-3 PENT PIPE TO PENT 14-A-502 VALVE TO PIPE 14-A-503 ELBOW TO PIPE 14-B-10 ELBOW TO PIPE I 4-B-3 PENT PIPE TO PENT 14-B-8 ELBOW TO PIPE 14-A-32 PIPE TO ELBOW 14-A-33 ELBOW TO PIPE 14-A-45 PIPE BND TO SAFE-END 14-B-32 PIPE TO ELBOW 14-B-33 ELBOW TO PIPE 14-B-44 PIPE BEND TO SF-END 14DCN-H74(IA)R INTEGRAL AITACHMENT B-F B-F B-F-X B-F-X B-J B-J B-J B-J B-J B-J B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B5.130 B5.130 B5.130-X B5.130-X B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9. I1 -X B9.I -X B9.1 I-X B9.1I-X B9.11-X B9.11-X PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT B-K B10.20 MT, or PT EXAM CAT ITEM NO Page I of 39 NDE METHOD OUTAGE REMARKS 3R13 3R15 3R13 3RI5 3R13 3R13 3R13 3R15 3R 15 3R15 3R14 3R14 3R14 3R14 3R14 3R14 3R13

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID COMPONENT DESC ASME XI CODE CLASS I

SYSTEM CORE SPRAY 14DCN-H74 SPRING HANGER 14DCN-H76 SPRING HANGER 14DCN-H73 SPRING HANGER N-16B ANCHOR SYSTEM FEEDWATER 6-A-I I 6-A-17 6-AA-10 6-AA-8 6-AB-4 6-AB-6 6-AC-2 6-AM-2 6-A-8 6-A-9 6-AC-9 6-ASU-1 6-B-IA 6-B-2 6-B-3/13-1 6-B-7 VALVE TO ELBOW VALVE TO PIPE TRANS PIECE TO NOZZ ELBOW TO PIPE ELBOW TO PIPE TRANS PIECE TO NOZZ ELBOW TO PIPE PIPE TO TEE TEE TO PIPE PIPE TO PENT TRANS PIECE TO NOZZ TEE TO PIPE VALVE TO PIPE PIPE TO ELBOW 6-IN. BRANCH CONNECTION TEE TO PIPE EXAM CAT Page 2 of 39 OUTAGE ITEM NO FI.10 F1,10 F1.10 FI.10 REMARKS NDE METHOD VT-3 VT-3 VT-3 VT-3 F-A F-A F-A F-A 3R13 3R14 3R15 3R15 B-J 13 B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.31 B9.11 MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R14 3RI4 3R14 3R14 3R14 3R14 3R14 3R14

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS SYSTEM FEEDWATER 6-B-8 6-BD-9 6-B-13 6-B-17 6-BD-3 6-BE-1 6-BE-3 6-BE-4 6-BE-6 6-BF-2 6-BF-6 6-BF-8 6-BM-1 6DDNL-H24(IA) 6DDNL-H32(IA) 6DD-H58(IA) 6DDNL-H24 6DDNL-H37 6DDNL-H41 6DDNL-H44 6DDNL-H29 6DDNL-H32 COMPONENT DESC I

PIPE TO PENT TRANS PIECE TO NOZZ ELBOW TO PIPE PIPE TO TEE PIPE TO ELBOW TEE TO PIPE BEND PIPE TO ELBOW ELBOW TO PIPE TRANS PIECE TO NOZZ PIPE TO ELBOW ELBOW TO PIPE TRANS PIECE TO NOZZ REDUCER TO PIPE INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER EXAM CAT ITEM NO Page 3 of 39 NDE METHOD OUTAGE REMARKS B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-K B-K B-K F-A F-A F-A F-A F-A F-A B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B10.20 B10.20 B10.20 FI.10 Fl.10 FI.10 FI.10 F1.10 FI.10 MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT MT or PT MT or PT VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 3R14 3R14 3R15 3R15 3R15 3R15 3R15 3R15 3R15 3R15 3R15 3R15 3R15 3R13 3R14 3R15 3R13 3R13 3R13 3R13 3R14 3R14

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID COMPONENT DESC ASME XI CODE CLASS 1

SYSTEM FEEDWATER 6DDNL-H34 SPRING HANGER 6DDNL-H40 SPRING HANGER 6DD-H58 SPRING HANGER 6DDNL-H6 SPRING HANGER N-9B ANCHOR SYSTEM HIGH PRESSURE COOLANT INJECTION 23-0-1 23-0-3 23-0-6 23-1-501 23-1-502 23-0-17 23-0-18 23-0-19 23DBN-H5 1 (IA)

N-1I 23DBN-H54 23DBN-H64 23DBN-H51 BRANCH CONN TO PIPE ELBOW TO PIPE PIPE TO ELBOW ELBOW TO VALVE VALVE TO PIPE ELBOW TO PENT PIPE PENT TO PIPE PIPE TO ELBOW INTEGRAL ATTACHMENT ANCHOR SPRING HANGER SPRING HANGER SPRING HANGER Page 4 of 39 OUTAGE EXAM CAT F-A F-A F-A F-A F-A ITEM NO F1.10 FI,10 F17.10 FI.10 FI.10 REMARKS NDE METHOD VT-3 VT-3 VT-3 VT-3 VT-3 3R 14 3R14 3R15 3R15 3R15 B-J B-J B-J B-J B-J B-J B-J B-A B-K F-A F-A F-A F-A B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B 10.20 F1.10 FI.10 FI.10 F1.10 MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT VT-3 VT-3 VT-3 VT-3 3R13 3R13 3R13 3R14 3R14 3R15 3R15 3R15 3R15 3R12 3R13 3R14 3R15

SCHEDULE DATE - 3/29/02 REVISION-1 COMPONENT ID ASME XI CODE CLASS PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT DESC EXAM CAT ITEM NO NDE METHOD OUTAGE SYSTEM HIGH PRESSURE COOLANT INJECTION N-11 ANCHOR SYSTEM MAIN RECIRCULATION PUMP IB PUMP B (FS)

PUMP B (NBW)

BS-23/CO(PRB) 2-BS-23/BSD 2-BSD-10 2-BSD-11 2-BSD-12 2-BSD-13 2-AS-21 2-AS-22 2-AS-23 2-BHD-7 2-BHE-7 2-BS-19 PRESS-RETAINING BLTS FLANGE SURFACES NUT,BUSHING,& WASHER CLEANOUT BOLTING 2" BRANCH CONNECTION PIPE TO ELBOW ELBOW TO PIPE PIPE TO ELBOW ELBOW TO PIPE PIPE BEND TO TEE TEE TO PIPE PIPE TO PIPE BEND PIPE BEND TO SF-END PIPE BEND TO SF-END SF-END TO PIPE BEND I

Page 5 of 39 REMARKS F-A F1.10 VT-3 3R15 B-G-1 B-G-1 B-G-1 B-G-2 B-J B-J B-J B-J B-J B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B6.180 B6.190 B6.200 B7.50 B9.32 B9.40 B9.40 B9.40 B9.40 B9.1 I-X B9.11 -X B9.11-X B9.11 -X B9.11 -X B9.11-X UT VT-1 VT-1 VT-I PT PT PT PT PT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT 3R15 3R15 3R15 3R16 3R16 3R16 3R16 3R16 3R16 3R13 3R13 3R13 3R13 3R13 3R13

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC I

SYSTEM MAIN RECIRCULATION 2-AS-20 2-BD-30 2-BHB-7 2-BS-21 2-AD-32 2-AHH-6 2-AHH-7 2-AM-6 2-AM-8 2-BS-23/CO-I H 1A(IA)R H 16B/SS 1B(IA)

H17B SS2B HI5B HIA SS6B HIOB H16B HIB SS1B SS3C SF END TO PIPE BEND PIPE TO CROSS PIPE BEND TO SF-END PIPE TO PIPE BEND PIPE TO TEE CROSS TO PIPE BEND PIPE BEND TO SF-END CROSS TO PIPE CROSS TO PIPE WELDOLET TO PIPE INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT SPRING HANGER MECHANICAL SNUBBER SPRING HANGER SPRING HANGER MECHANICAL SNUBBER SPRING HANGER SPRING HANGER SPRING HANGER HYDRAULIC SNUBBER HYDRAULIC SNUBBER EXAM CAT ITEM NO Page 6 of 39 NDE METHOD OUTAGE REMARKS B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-K B-K F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A B9.I -X B9.1 I-X B9. 11 -X B9.11-X B9.11-X B9.i1-X B9.1I-X B9.1 I-X B9.11-X B9.11-X BI0.20 B10.30 F1.40 F1.40 F1.40 F1.10 F1.40 F1.10 F1.40 FI.10 F1.40 F1.40 PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT MT or PT MT or PT VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 3R14 3R14 3R14 3R14 3R15 3R15 3R15 3R15 3R15 3R16 3R13 3R14 3R12 3R12 3R13 3R13 3R13 3R14 3R14 3R14 3R14 3R15

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC I

SYSTEM MAIN RECIRCULATION SS3D HYDRAULIC SNUBBER PG 11A RIGID RESTRAINT SYSTEM MAIN STEAM AO-3-01A-080B(PRB)

RV-3-02-070A(PRB)

RV-3-02-07IB(PRB)

RV-3-02-071C(PRB)

RV-3-02-07IF(PRB)

RV-3-02-07lJ(PRB)

RV-3-02-071K(PRB)

RV-3-02-071 L(PRB)

I -A-7 1 -A-7/ASA I -A-7/ASG l-A-8 I -A-9 I-ASA-I I -ASA-2 I-ASG-1 1 -ASG-2 1-A-I INBD ISOL VLV BOLT SAF RLF VLV FLG BOLT RLF VLV FLG BOLTING RLF VLV FLG BOLTING RLF VLV FLG BOLTING RLF VLV FLG BOLTING RLF VLV FLG BOLTING RLF VLV FLG BOLTING ELBOW TO PIPE 6-IN. BRANCH CONN 6-IN. BRANCH CONN PIPE TO PIPE PIPE TO ELBOW BRANCH CONN TO PIPE PIPE TO FLANGE BRANCH CONN TO PIPE PIPE TO FLANGE NOZZ TO TRANS PIECE EXAM CAT ITEM NO Page 7 of 39 NDE METHOD OUTAGE F-A F-A REMARKS F1.40 F7.10 VT-3 VT-3 3R15 3R16 Disassembly Disassembly Disassembly Disassembly Disassembly Disassembly Disassembly Disassembly B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B7.70 B7.70 B7.70 B7.70 B7.70 B7.70 B7.70 B7.70 B9.11 B9.31 B9.31 B9.11 B9.II B9.11 B9.11 B9.11 B9.11 B9.11 VT-I VT-1 VT-I VT-1 VT-1 VT-I VT-I VT-1 MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT 3RI2 3R12 3R12 3R12 3R12 3R 12 3R12 3R12 3R12 3R 12 3R 12 3R12 3R12 3R12 3R12 3R12 3R12 3R13

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS SYSTEM MAIN STEAM I -A-3 1-B-I I-B-3 l-B-6 I-BSA-I I-A-14 l-B-!7 1-C-15 1-C-17 1-C-6 I -C-7/CSA I -C-7/CSD 1-CSA-I 1-CSA-2 1-CSD-1 1 -CSD-2 1-D-14 I-C-I I-C-3 I-D-1 I -D-3 l-D-12 I-D-7/DSA I -D-7/DSG I -D-9 COMPONENT DESC I

PIPE TO ELBOW NOZZ TO TRANS PIECE PIPE TO ELBOW PIPE TO TEE BRANCH CONN TO PIPE PENT TO PIPE PENT TO PIPE PIPE TO VALVE PENT TO PIPE PIPE TO TEE 6-IN. BRANCH CONNECTION 6-IN. BRANCH CONNECTION BRANCH CONN TO PIPE PIPE TO FLANGE BRANCH CONN TO PIPE PIPE TO FLANGE PENT TO PIPE NOZZ TO TRANS PIECE PIPE TO ELBOW NOZZ TO TRANS PIECE PIPE TO ELBOW PIPE TO VALVE 6-IN. BRANCH CONN 6-IN. BRANCH CONN PIPE TO ELBOW EXAM CAT ITEM NO Page 8 of 39 NDE METHOD OUTAGE REMARKS B-J B-J B-J B-J B-J B-J B-J B-A B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.31 B9.31 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.11 B9.31 B9.31 B9.11 MT or PT & UT MT or PT & UT MTor PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT 3R13 3R13 3R13 3R13 3R13 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R15 3R15 3R15 3R15 3R16 3R16 3R16 3R16

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS SYSTEM MAIN STEAM 1-DSA-1 1-DSA-2 1 -DSG-I I-DSG-2 HA2(IA)

GC I (IA)

HD4(IA)

AO-3-01 A-080B RV-3-02-071K HA2 HA4 GB1 SSB3 SSB6 GCI HC1 HC2 HD2 HD4 COMPONENT DESC I

BRANCH CONN TO PIPE PIPE TO FLANGE BRANCH CONN TO PIPE PIPE TO FLANGE INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INBD ISOL VLV RELIEF VALVE SPRING HANGER SPRING HANGER RIGID RESTRAINT HYDRAULIC SNUBBER HYDRAULIC SNUBBER RIGID RESTRAINT SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER EXAM CAT ITEM NO Page 9 of 39 NDE METHOD OUTAGE REMARKS B-J B-J B-J B-J B-K B-K B-K B-M-2 B-M-2 B9.11 B9.11 B9.11 B9.11 B110.20 B110.20 B110.20 B12.50 B12.50 F1.10 Fl.10 FI.10 FI.10 FI.10 FI.10 FI.10 FI.10 FI.10 FI.10 MT or PT & UT MT or PT & UT MT or PT & UT MTor PT &UT MT or PT MT or PT or UT MT or PT or UT VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 3R16 3R16 3R16 3R16 3R12 3R14 3R16 3R12 3R12 3R12 3R12 3R13 3R13 3R13 3R14 3R14 3R14 3R16 3R16 Disassembly Disassembly F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 1

SYSTEM REACTOR CORE ISOLATION COOLING 13-1-501 13-1-502 ELBOW TO VALVE VALVE TO PIPE SPRING HANGER 13DDN-H76 SYSTEM REACTOR DRAIN 4-RD-56 4-RD-10 4-RD-I l 4-RD-12 4-RD-13 4-RD-14 4-RD-15 4-RD-45 4-RD-46 4-RD-55 PIPE TO PIPE ELBOW TO PIPE BEND PIPE TO ELBOW ELBOW TO PIPE PIPE BND TO ELBOW COUPLING TO PIPE BND PIPE BND TO COUPLING COUPLING TO PIPE BND PIPE BND TO COUPLING PIPE TO PIPE BEND PH-86 PH-87 SPRING HANGER SPRING HANGER EXAM CAT ITEM NO Page 10 of 39 NDE METHOD OUTAGE REMARKS B-J B-J F-A B9.11 B9.11 FI.10 MT or PT & UT MT or PT & UT VT-3 3R 14 3R14 3R14 B-F B-J B-J B-J B-J B-J B-J B-J B-J B-i F-A F-A PT PT PT PT PT PT PT PT PT PT B5.140 B9.40 B9.40 B9.40 B9.40 B9.40 B9.40 B9.40 B9.40 B9.21 FI.10 FI.IO 3R16 3R12 3R12 3R 12 3R12 3R12 3R12 3R16 3R16 3R16 3R12 3R12 VT-3 VT-3

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID COMPONENT DESC EXAM CAT ASME XI CODE CLASS I

SYSTEM REACTOR DRAIN 4DCA-S51 RIGID RESTRAINT SYSTEM REACTOR PRESSURE VESSEL HEAD TO FLANGE DOLLAR PLATE WELD AT 0 DEG.

AT 60 DEG.

AT 120 DEG.

AT 180 DEG.

AT 240 DEG.

AT 300 DEG.

CH MERID @ 0 DEG CH MERID @ 60 DEG CH MERID @ 120 DEG CH MERID @ 180 DEG.

AT 0 DEG.

AT 120 DEG.

AT 300 DEG.

SHL CRS NO. 5 TO FLANGE CH MERID @ 120 DEG CH MERID @ 180 DEG.

CH MERID @ 240 DEG.

CH MERID @ 300 DEG.

B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B 1.40 B 1.21 B 1.22 B 1.22 131.22 B11.22 B 1.22 B 1.22 B 1.22 B 1.22 B 1.22 B 1.22 B11.22 B13.22 B 1.22 B 1.30 B11.22 B1.22 B 1.22 B 1.22 MT or PT & UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT 3R12 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R14 3R14 3R14 3R14 3R14 3R14 3R15 3R15 Required per IWB-2430(a)

Required per IWB-2430(a)

IWB-2420 Successive Examinations IWB-2420 Successive Examinations IWB-2420 Successive Examinations Partial Exam, CR#96725 IWB-2430c Additional Exams IWB-2430c Additional Exams ITEM NO Page 11 of 39 NDE METHOD OUTAGE F-A REMARKS FLI10 VT-3 3R16 CH-C-2 CH-C-1 CH-MA CH-MB CH-MC CH-MD CH-ME CH-MF RPV-MA RPV-MB RPV-MC RPV-MD CH-MA CH-MC CH-MF RPV-C6 RPV-MC RPV-MD RPV-ME RPV-MF

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS I

SYSTEM REACTOR PRESSURE VESSEL AT 0 DEG.

AT 120 DEG.

AT 300 DEG.

SHL CRS NO. 5 TO FLANGE REPAIR WELD SHELL COURSE 2 ON SHL CRS NO. I ON SHL CRS NO. 1 ON SHL CRS NO. 1 ON SHL CRS NO. 2 ON SHL CRS NO. 2 ON SHL CRS NO. 2 ON SHL CRS NO. 3 ON SHL CRS NO. 3 ON SHL CRS NO. 3 ON SHL CRS NO. 4 ON SHL CRS NO. 4 ON SHL CRS NO. 4 ON SHL CRS NO. 5 ON SHL CRS NO. 5 ON SHL CRS NO. 5 NOZZLE N6A NOZZLE N6A NOZZLE N7 B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-A B-D B-D B-D B 1.22 B11.22 B 1.22 B11.30 B1.51 B1.12 B1.12 B1.12 B1.12 B1.12 B1.12 B1.12 BI.12 B1.12 B1.12 Bl.12 B1.12 B1.12 Bl.12 B1.12 B3.90 B3.100 B3.90 UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R13 3R13 3R13 IWB-2420 Successive Examinations IWB-2420 Successive Examinations IWB-2420 Successive Examinations Partial Exam COMPONENT DESC EXAM CAT ITEM NO Page 12 of 39 NDE METHOD OUTAGE REMARKS CH-MA CH-MC CH-MF RPV-C6 RPV-RW1 RPV-VIA RPV-V1B RPV-V1C RPV-V2A RPV-V2B RPV-V2C RPV-V3A RPV-V3B RPV-V3C RPV-V4A RPV-V4B RPV-V4C RPV-V5A RPV-V5B RPV-V5C CH-NA CH-NA-IRS CH-NB

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC I

SYSTEM REACTOR PRESSURE VESSEL CH-NB-IRS NOZZLE N7 CH-NC NOZZLE N6B CH-NC-IRS NOZZLE N6B NIB MAIN RECIRC OUT NOZ NIB-IRS MAIN RECIRC OUT NOZ N2D MAIN RECIRC IN NOZ N2D-IRS MAIN RECIRC IN NOZ N2E MAIN RECIRC IN NOZ N2E-IRS MAIN RECIRC IN NOZ N2F MAIN RECIRC IN NOZ N2F-IRS MAIN RECIRC IN NOZ N3A MAIN STEAM NOZZLE N3A-IRS MAIN STEAM NOZZLE N3B MAIN STEAM NOZZLE N3B-IRS MAIN STEAM NOZZLE N4A FEEDWATER NOZZLE N4A-IRS FEEDWATER NOZZLE N4B FEEDWATER NOZZLE N4B-lRS FEEDWATER NOZZLE N8A JET PUMP INSTR NOZZ N8A-IRS JET PUMP INSTR NOZZ N10 SLC NOZZLE TO VESSEL WELD NIA MAIN RECIRC OUT NOZ N1A-IRS MAIN RECIRC OUT NOZ N2A MAIN RECIRC IN NOZ EXAM CAT ITEM NO Page 13 of 39 NDE METHOD OUTAGE REMARKS B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3. 100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.90 B3.100 B3.90 UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R14 3R14 3R14 3R14

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS I

SYSTEM REACTOR PRESSURE VESSEL N2A-IRS MAIN RECIRC IN NOZ N2B MAIN RECIRC IN NOZ N2B-IRS MAIN RECIRC IN NOZ N2C MAIN RECIRC IN NOZ N2C-IRS MAIN RECIRC IN NOZ N2G MAIN RECIRC IN NOZ N2G-IRS MAIN RECIRC IN NOZ N4C FEEDWATER NOZZLE N4C-IRS FEEDWATER NOZZLE N4D FEEDWATER NOZZLE N4D-IRS FEEDWATER NOZZLE N5A CORE SPRAY NOZZLE N5A-IRS CORE SPRAY NOZZLE N9 CRD NOZZLE N9-IRS CRD NOZZLE N2H MAIN RECIRC IN NOZ N2H-IRS MAIN RECIRC IN NOZ N2J MAIN RECIRC IN NOZ N2J-IRS MAIN RECIRC IN NOZ N2K MAIN RECIRC IN NOZ N2K-IRS MAIN RECIRC IN NOZ N3C MAIN STEAM NOZZLE N3C-IRS MAIN STEAM NOZZLE N3D MAIN STEAM NOZZLE N3D-IRS MAIN STEAM NOZZLE COMPONENT DESC EXAM CAT ITEM NO Page 14 of 39 NDE METHOD OUTAGE REMARKS B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B3.100 B3.90 B13.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 13390 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R15 3R15 3R15 3R15 3R15 3R15 3R15 3R15 3R15 3R15

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC I

SYSTEM REACTOR PRESSURE VESSEL N4E FEEDWATER NOZZLE N4E-IRS FEEDWATER NOZZLE N4F FEEDWATER NOZZLE N4F-IRS FEEDWATER NOZZLE N5B CORE SPRAY NOZZLE N5B-IRS CORE SPRAY NOZZLE N8B JET PUMP INSTR NOZZ N8B-IRS JET PUMP INSTR NOZZ CRD NOZZLES INSTR NOZ VESSEL NOZZLES 4-NilA-1 4-NI6A-1 4-NI0-1 4-NIIB-1 4-NI6B-1 2-AHF-8 2-BHD-8 2-BHE-8 2-BS-18 NI 1A,B NI2A,B N16A,B NI5,1N-CORE PROBES "NI IA NOZ TO SAFE END "NI6A NOZ TO SAFE END N10 NOZ TO SF-END "N11B NOZ TO SAFE END "NI6B NOZ TO SAFE END SAFE END TO NOZ N2F SAFE END TO NOZ N2D SAFE END TO NOZ N2E SAFE END TO NOZ NIB EXAM CAT ITEM NO Page 15 of 39 NDE METHOD OUTAGE REMARKS B-D B-D B-D B-D B-D B-D B-D B-D B-E B-E B-E B-F B-F B-F B-F B-F B-F-X B-F-X B-F-X B-F-X B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B3.90 B3.100 B4.12 B4.13 B4.11 B5.20 B5.20 B5.20 B5.20 B5.20 B5.10-X B5.10-X B5.10-X B5.10-X UT UT UT UT UT UT UT UT VT-2 VT-2 VT-2 PT PT PT and UT PT PT PT and UT PT and UT PT and UT PT and UT 3R15 3R15 3R15 3R15 3R15 3R15 3R15 3R15 3R14 3R14 3R14 3R13 3R13 3R14 3R14 3R15 3R13 3R13 3R13 3R13

SCHEDULE DATE - 3/29/02 REVISION-1 COMPONENT ID ASME XI CODE CLASS PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT DESC EXAM CAT ITEM NO NDE METHOD Page 16 of 39 OUTAGE 1

SYSTEM REACTOR PRESSURE VESSEL JP-A-6 14-A-46 2-AHG-8 2-AS-19 2-BHA-8 2-BHB-8 2-BHC-8 3-1-20 14-B-45 2-AHH-8 2-AHJ-8 2-AHK-8 JP-B-6 STUDS 1-46 (BUSHNGS)

STUDS 1-46 (INPLACE)

STUDS 1-46 (LG WSHR)

STUDS 1-46 (NUTS)

STUDS 1-46 (SM WSHR)

STUDS 1-46 (THREADS)

STUDS 47-92(BUSHNGS)

STUDS 47-92(INPLACE)

STUDS 47-92(LG WSHR)

STUDS 47-92(NUTS)

N8A NOZ TO PEN SEAL SAFE-END TO NOZ N5A SAFE END TO NOZ N2G SAFE END TO NOZ NIA SAFE END TO NOZ N2A SAFE END TO NOZ N2B SAFE END TO NOZ N2C NOZZLE N9 TO CAP SAFE-END TO NOZ N5B SAFE END TO NOZ N2H SAFE END TO NOZ N2J SAFE END TO NOZ N2K N8B NOZ TO PEN SEAL CH BUSHINGS CH STUDS IN PLACE CH WASHERS, LARGE CH NUTS CH WASHER, SMALL THREADS IN FLANGE CH BUSHINGS CH STUDS IN PLACE CH WASHERS, LARGE CH NUTS REMARKS B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-F-X B-G-1 B-G-I B-G-1 B-G-1 B-G-1 B-G-1 B-G-1 B-G-1 B-G-I B-G-1 B5.10-X B5,10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B5.10-X B6.50 B6.20 B6.50 B6.10 B6.50 B6.40 B6.50 B6.20 B6.50 B6.10 MT or PT & UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT MT or PT & UT VT-I UT VT-1 UT VT-I UT VT-I UT VT-1 UT*

3R13 3R14 3R14 3R14 3R14 3R 14 3R14 3R 14 3R15 3R15 3R15 3R1 5 3R15 3R13 3R13 3R13 3R13 3R13 3R13 3R 15 3R15 3R15 3R15

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 1

SYSTEM REACTOR PRESSURE VESSEL STUDS 47-92(SM WSHR)

STUDS 47-92(THREADS)

STUDS 67-72(REMOVED)

CRD HOUSING BOLTING CRD HOUSING BOLTING N-A-1FB N-B-IFB N-C-IFB N-B-I 4-NIO-2 4-N16B-2 SUPPORT-3(IA)

SUPPORT-4(IA)

SUPPORT-5(IA)

SUPPORT-6(IA)

RPV-SK SUPPORT-7(IA)

SUPPORT-8(IA)

SUPPORT-I (IA)

SUPPORT-2(IA)

CH WASHER, SMALL THREADS IN FLANGE CH STUDS WHEN REMOVE FLANGE BOLTING FLANGE BOLTING N6A FLANGE BOLTING N7 FLANGE BOLTING N6B FLANGE BOLTING N7 NOZZLE TO FLANGE SAFE-END TO TEE SAFE END TO REDUCER STAB BAR @ 90 DEG STAB BAR @ 135 DEG STAB BAR @ 180 DEG.

STAB BAR @ 225 DEG SUPPORT SKIRT WELD STAB BAR @ 270 DEG STAB BAR @ 315 DEG.

STAB BAR @ 0 DEG.

STAB BAR @ 45 DEG B-G-I B-G-I B-G-1 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-J B-J B-J B-K B-K B-K B-K B-K B-K B-K B-K B-K B6.50 B6.40 B6.30 B7.80 B7.80 B7.50 B7.50 B7.50 B9.11 B9.21 B9.40 B10.10 B10.10 B10.10 B10.10 B10.10 B10.10 B10.10 B10.10 B10.10 VT-i UT MT or PT & UT VT-I VT-i VT-I VT-I VT-I MT or PT & UT PT PT MT or PT or UT MT or PT or UT MT or PT or UT MT or PT or UT MT or PT or UT MT or PT or UT MT or PT, or UT MT or PT or UT MT or PT or UT EXAM CAT ITEM NO Page 17 of 39 NDE METHOD OUTAGE REMARKS Disassembly Disassembly 3R15 3R15 3R15 3R12 3R13 3R13 3R13 3R13 3R12 3R14 3R15 3R13 3R14 3R 14 3R14 3R15 3R15 3R15 3R16 3R16

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS 1

SYSTEM REACTOR PRESSURE VESSEL VESSEL INTERIOR VESSEL INTERIOR VESSEL INTERIOR CS HDR BKTWLD 15AZ CS HDR BKT WLD 117AZ CS HDR BKT WLD 123AZ CS HDR BKT WLD 165AZ CS HDR BKT WLD 195AZ CS HDR BKT WLD 237AZ CS HDR BKT WLD 243AZ CS HDR BKT WLD 345AZ DRYER BKTWLD 4AZ DRYER BKT WLD 94AZ FW SPG BKT WLD 5AZ FW SPG BKT WLD 55AZ FW SPG BKT WLD 65AZ FW SPG BKT WLD 115AZ J P 01/02 BRACE ARM J P 03/04 BRACE ARM J P 05/06 BRACE ARM SHRD SUP PLT WLD H-9 DRYER BKT WLD 184AZ RPV INTERIOR RPV INTERIOR RPV INTERIOR MAG-CG-408, 7.6.6 MAG-CG-408, 7.6.6 MAG-CG-408, 7.6.6 MAG-CG-408, 7.6.6 MAG-CG-408, 7.6.6 MAG-CG-408, 7.6.6 MAG-CG-408, 7.6.6 MAG-CG-408, 7.6.6 MAG-CG-408, 7.3.10 MAG-CG-408, 7.3.10 N4A SPARGER N4A SPARGER N4B SPARGER N4B SPARGER PAD TO VESSEL WELD PAD TO VESSEL WELD PAD TO VESSEL WELD MAG-CG-408, 7.5.8.2 MAG-CG-408, 7.3.10 COMPONENT DESC EXAM CAT ITEM NO Page 18 of 39 NDE METHOD OUTAGE REMARKS B-N-i B-N-i B-N-i B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B13.10 B13.10 B13.10 B 13.30 B 13.30 B 13.30 B 13.30 B13.30 B13.30 B 13.30 B13.30 B 13.30 B13.30 B13.30 B13.30 B13.30 B13.30 B 13.20 B 13.20 B 13.20 B 13.30 B 13.30 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-I VT-I VT-i VT-3 VT-3 3R13 3R14 3R16 3R12 3R12 3R12 3R12 3R12 3R12 3R12 3R12 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R14 Partial Exam

SCHEDULE DATE - 3/29/02 REVISION - 1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 1

SYSTEM REACTOR PRESSURE VESSEL DRYER B KT WLD 274AZ GD RD UBKT WLD OAZ GD RD UBKT WLD 180AZ J P 09/10 BRACE ARM J P 13/14 BRACE ARM SURVLLBKTWLD 30AZ SURVL LBKT WLD 120AZ SURVL LBKT WLD 300AZ SURVLUBKTWLD 30AZ SURVL UBKT WLD 120AZ SURVL UBKT WLD 300AZ J P 11/12 BRACE ARM J P 15/16 BRACE ARM J P 17/18 BRACE ARM J P 19/20 BRACE ARM SHRD SUP PLT WLD H-9 CORE PLATE/SUP BOLTS CRD HOUSING DHDB-1 41.5 AZ DHDB-2 138.5 AZ DHDB-3 221.5 AZ DHDB-4 318.5 AZ FW SPG BKT WLD 125AZ FW SPG BKT WLD 175AZ FW SPG BKT WLD 185AZ MAG-CG-408, 7.3.10 MAG-CG-408, 7.3.6 MAG-CG-408, 7.3.6 PAD TO VESSEL WELD PAD TO VESSEL WELD MAG-CG-408, 7.4.20 MAG-CG-408, 7.4.20 MAG-CG-408, 7.4.20 MAG-CG-408, 7.4.20 MAG-CG-408, 7.4.20 MAG-CG-408, 7.4.20 PAD TO VESSEL WELD PAD TO VESSEL WELD PAD TO VESSEL WELD PAD TO VESSEL WELD MAG-CG-408, 7.5.8.2 MAG-CG-408, 7.5.6.5, 7.5.7.3 MAG-CG-408, 7.5.6, -.7, -.8 DRYER HOLD-DOWN BRKT WELD DRYER HOLD-DOWN BRKT WELD DRYER HOLD-DOWN BRKT WELD DRYER HOLD-DOWN BRKT WELD N4C SPARGER N4C SPARGER N4D SPARGER EXAM CAT ITEM NO Page 19 of 39 NDE METHOD OUTAGE REMARKS B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B 13.30 B13.30 B13.30 B 13.20 B13.20 B 13.20 B 13.20 B 13.20 B 13.20 B 13.20 B 13.20 B 13.20 B 13.20 B 13.20 B 13.20 B13.30 B 13.40 B 13.40 B 13.30 B13.30 B 13.30 B 13.30 B13.30 B 13.30 B 13.30 VT-3 VT-3 VT-3 VT-I VT-1 VT-I VT-i VT-i VT-i VT-3 VT-3 VT-I VT-I VT-I VT-I VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R15 3R15 3R15 3R15 3R15 3R16 3R16 3R16 3R16 3R116 3R16 3R16 3R16 3R16 Partial Exam

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC I

SYSTEM REACTOR PRESSURE VESSEL FW SPG BKT WLD 225AZ FW SPG BKT WLD 245AZ FW SPG BKT WLD 295AZ FW SPG BKT WLD 305AZ FW SPG BKT WLD 355AZ GD RD LBKT WLD OAZ GD RD LBKT WLD 180AZ J P 07/08 BRACE ARM ORIFICED FUEL SUP PERIPHERAL FUEL SUP SHROUD SUPPORT TOP CORE GUIDE RPV PT RPV PT RPV HT SLC CL I HT RPV PT RPV PT RPV-SK(SC)

SUPPORT-1 SUPPORT-2 SUPPORT-3 N4D SPARGER N4E SPARGER N4E SPARGER N4FSPARGER N4F SPARGER MAG-CG-408, 7.3.6 MAG-CG-408, 7.3.6 PAD TO VESSEL WELD MAG-CG-408, 7.5.7 MAG-CG-408, 7.5.6 MAG-CG-408, 7.5.8.2 MAG-CG-408, 7.3.8 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PARTIAL HYDRO TEST SYSTEM PARTIAL HYDRO TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SUPPORT SKIRT STAB BAR @ 0 DEG.

STAB BAR @ 45 DEG.

STAB BAR @ 90 DEG.

B-P B-P B-P B-P B-P B-P F-A F-A F-A F-A B13.30 B13.30 B 13.30 B13.30 B 13.30 B13.30 B13.30 B 13.20 B 13.40 B 13.40 B 13.40 B 13.40 B15.XX B15.XX B15.XX B I5.XX B15.XX B15.XX F1.40 F1.40 FI.40 FI.40 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-I VT-3 VT-3 VT-3 VT-3 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-3 VT-3 VT-3 VT-3 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R16 3R12 3R13 3R14 3R14 3R15 3R16 3R12 3R12 3R12 3R13 Work With SLC CL 1 HT EXAM CAT ITEM NO Page 20 of 39 NDE METHOD OUTAGE REMARKS

SCHEDULE DATE - 3/29/02 REVISION-1 COMPONENT ID ASME XI CODE CLASS PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT DESC EXAM CAT ITEM NO NDE METHOD OUTAGE SYSTEM REACTOR PRESSURE VESSEL SUPPORT-4 STAB BAR @ 135 DEG.

SUPPORT-5 STAB BAR @ 180 DEG SUPPORT-6 STAB BAR @ 225 DEG.

SUPPORT-7 STAB BAR @ 270 DEG.

SUPPORT-8 STAB BAR @ 315 DEG SYSTEM REACTOR WATER CLEAN-UP 12-I-2R VALVE TO PIPE PIPE TO COUPLING ELBOW TO PIPE WELDOLET TO PIPE VALVE TO PIPE PIPE TO ELBOW ELBOW TO PIPE PIPE TO VALVE PIPE TO PIPE PIPE TO VALVE VALVE TO PIPE PIPE TO PIPE ELBOW TO ELBOW I

Page 21 of 39 REMARKS VT-3 VT-3 VT-3 VT-3 VT-3 F-A F-A F-A F-A F-A B-F-X 3R14 3R14 3R14 3R15 3R15 B-J B-J F1.40 F1.40 FI.40 FI.40 F1.40 B5.130-X B9.32 B9.11 B9.11-X B9.11-X B9.1 I-X B9.11 -X B9.11-X B9.11-X B9.1I-X B9.1I-X B9.11-X B9.11-X 12-0-22/4-RD 12-1-3 12-O-20A 12-1-1 12-I-IA 12-1-1B 12-I-IC 12-0-201 12-0-202 12-0-203 12-0-204 12-0-30 PT and UT PT MT or PT & UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X B-J-X 3R15 3R12 3R15 3R12 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R13 3R14

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC I

SYSTEM REACTOR WATER CLEAN-UP 12-0-33 12-1-IC 12-I-1D 12-0-38 12-0-39 12DCN-HI 52(IA)

MO-3-12-68 12DCN-H 152 12DCN-H150 12DCN-S6 ELBOW TO PIPE PIPE TO VALVE PIPE TO PIPE PENETRATION TO PIPE PIPE TO VALVE INTEGRAL ATTACHMENT GATE VALVE SPRING HANGER SPRING HANGER RIGID RESTRAINT B-J-X B-J-X B-J-X B-J-X B-J-X B-K B-M-2 F-A F-A F-A B9.11-X B9.1 I -X B9.11 -X B9.1I-X B9.11-X B10.20 B 12.50 F1.10 Fl.10 PT and UT PT and UT PT and UT PT and UT PT and UT PT VT-3 VT-3 VT-3 VT-3 3R14 3R15 3R15 3R16 3R 16 3R12 3R 12 3R1 2 3R14 3R14 88-01 Exam Only (no ASME XI credit)

Disassembly SYSTEM RESIDUAL HEAT REMOVAL PIPE TO PIPE BEND PENETRATION TO PIPE PIPE BEND TO PIPE PIPE TO PIPE BEND PIPE BEND TO PIPE EXAM CAT ITEM NO Page 22 of 39 NDE METHOD OUTAGE REMARKS 10-0-30 10-0-32 10-0-23 10-0-26 10-0-27 B-F B-F B-F-X B-F-X B-F-X B5.130 B5.130 B5.130-X B5.130-X B5.130-X PT and UT PT and UT PT and UT PT and UT PT and UT 3R113 3R13 3R13 3R13 3R13

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 1

SYSTEM RESIDUAL HEAT REMOVAL 10-IB-21 ELBOW TO PIPE 10-IB-24 PIPE TO CROSS 10-IA-21 ELBOW TO PIPE 10-IA-24 PIPE TO CROSS 10-0-31 PIPE BEND TO PENT 10-IB-14B VALVE TO PENETRATION 10-IA-1 4A VALVE TO PENETRATION 10-IB-19 PIPE BEND TO ELBOW 1ODCN-H 153 SPRING HANGER N-12 ANCHOR IODE-H 133A SPRING HANGER N-13A ANCHOR NUMBER OF CLASS: 1 ASME XI CODE CLASS COMPONENTS 2

SYSTEM CONTAINMENT ATMOSHPERE CONTROL Torus Purge PT SYSTEM PRESSURE TEST 3R13 EXAM CAT ITEM NO Page 23 of 39 NDE METHOD OUTAGE REMARKS B-F-X B-F-X B-F-X B-F-X B-J B-J B-J B-J-X F-A F-A F-A F-A B5.130-X B5.130-X B5.130-X B5.130-X B9.11 B9.11 B9.11 B9.11-X F1.10 Fl.10 F1.10 FI.10 PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT PT and UT VT-3 VT-3 VT-3 VT-3 3R14 3R14 3R15 3R15 3R13 3R14 3R15 3R14 3R 13 3R13 3R14 3R14 465 C-H C7.XX VT-2

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 2

SYSTEM CONTAINMENT ATMOSHPERE CONTROL Torus Purge PT Torus Purge PT SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM CONTAINMENT ATMOSPHERE CONTROL Instr N2 PT Instr N2 PT lnstr N2 PT SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM CONTAINMENT ATMOSPHERE DILUTION A CAD DW PT A CAD Torus PT B CAD DW PT B CAD Torus PT A CAD DW PT A CAD Torus PT B CAD DW PT B CAD Torus PT A CAD DW PT A CAD Torus PT B CAD DW PT B CAD Torus PT SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST EXAM CAT ITEM NO Page 24 of 39 NDE METHOD OUTAGE C-H C-H REMARKS C7.XX C7.XX VT-2 VT-2 3R14 3R15 C-H C-H C-H C7.XX C7.XX C7.XX VT-2 VT-2 VT-2 3R13 3R14 3R15 C-H C-H C-H C-H C-H C-H C-H C-H C-H C-H C-H C-H C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 3R13 3R13 3R13 3R13 3R14 3R14 3R14 3R14 3R15 3R15 3R15 3R15

SCHEDULE DATE - 3129/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 2

SYSTEM CORE SPRAY 14GB-H58(IA)

INTEGRAL ATTACHMENT 14GB-H40(IA)

INTEGRAL ATTACHMENT 14HB-S47(IA)

INTEGRAL ATTACHMENT 3DP37(IA)

PUMP SUPPORT WELD 14-2DA12-1 14-2DA12-8 14-2TSA14-17 14-2TSA16-16 14-2DB 12-1 14-2TSB 16-14 14-2DBD 14-20 14-2DBD 14-24 14-2TIBI0-1 14-2TSC16-1 14-2DC12-1 14-2TSC16-14 14-2DD12-1 14-2TSD16-15 A CS PT B CS PT A CS PT PUMP TO PIPE ELBOW TO PIPE TEE TO PIPE PIPE TO PUMP PUMP TO PIPE PIPE TO PUMP TEE TO REDUCER PIPE TO REDUCER REDUCER TO PIPE PENT TO PIPE PUMP TO PIPE PIPE TO PUMP PUMP TO PIPE PIPE TO PUMP SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST EXAM CAT ITEM NO Page 25 of 39 NDE METHOD OUTAGE REMARKS C-C C-C C-C C-C C-F-2 C-F-2 C-P-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-H C-H C-H C3.20 C3.20 C3.20 C3.30 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C7.XX C7.XX C7.XX MT or PT MT or PT MT or PT MT or PT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT VT-2 VT-2 VT-2 3R13 3R14 3R15 3R15 3R12 3R12 3R12 3R12 3R13 3R13 3R14 3R14 3R14 3R14 3R 15 3R15 3R16 3R16 3R12 3R12 3R14

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS SYSTEM CORE SPRAY B CS PT A CS PT B CS PT 14GB-H30 14GB-H58 14GB-H40 14GB-H43 I 4GB-S2 14MO-H59A 14GB-SIO 14HB-H2 14HB-H6 14HB-H8 14HB-$47 3DP37-SC COMPONENT DESC 2

SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER RIGID RESTRAINT SPRING HANGER RIGID RESTRAINT SPRING HANGER SPRING HANGER SPRING HANGER RIGID RESTRAINT PUMP SUPPORT SYSTEM HIGH PRESSURE COOLANT INJECTION 23DBN-H60(IA) 23DBN-H63(IA) 23DBN-H40(IA) 23HB-S40(IA)

INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT EXAM CAT ITEM NO Page 26 of 39 NDE METHOD OUTAGE REMARKS C-H C-H C-H F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A C7.XX C7.XX C7.XX F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.40 VT-2 VT-2 VT-2 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 3R14 3R16 3R16 3R13 3R13 3R14 3R14 3R14 3R14 3R15 3R15 3R15 3R15 3R15 3R15 C-C C-C C-C C-C C3.20 C3.20 C3.20 C3.20 MT or PT MT or PT MT or PT MT or PT 3R13 3R13 3R14 3R16

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 2

SYSTEM HIGH PRESSURE COOLANT INJECTION 23-2TE20-12 23-2TE20-15 23-2TE18-1 23-2TS16-1 23-0-48 23-0-53 23-2D14-13 23-2D14-14 23-2D10-1 23-2TS 12-30 23-2TS14-25 23-2TS16-13 HPCI PT HPCI PT HPCI PT HPCI PT 23DBN-H60 23DBN-H63 23HB-H622 23HB-S2A 23DBN-H40 PIPE TO TEE TEE TO ELBOW FLANGE TO TEE PENETRATION TO ELBOW TEE TO PIPE PIPE TO VALVE ELBOW TO PIPE PIPE TO VALVE PUMP TO REDUCER ELBOW TO FLANGE FLANGE TO PUMP VALVE TO PIPE SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SPRING HANGER SPRING HANGER RIGID RESTRAINT HYDRAULIC SNUBBER SPRING HANGER EXAM CAT ITEM NO Page 27 of 39 NDE METHOD OUTAGE REMARKS C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-H C-H C-H C-H F-A F-A F-A F-A F-A C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C7.XX C7.XX C7.XX C7.XX F1l.20 Fl.20 F1.20 FI.20 FI.20 MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT VT-2 VT-2 VT-2 VT-2 VT-3 VT-3 VT-3 VT-3 VT-3 3R13 3R13 3R14 3R14 3R14 3R14 3R15 3R15 3R16 3R16 3R16 3R16 3R12 3R112 3R14 3R 15 3R13 3R13 3R13 3R 13 3R14 Partial Test Partial Test

SCHEDULE DATE - 3/29/02 REVISION -1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC EXAM CAT 2

SYSTEM HIGH PRESSURE COOLANT INJECTION 23DBN-H65 SPRING HANGER 23DBN-S2 RIGID RESTRAINT 23DBN-S3 RIGID RESTRAINT 23DDN-S31 RIGID RESTRAINT 23DDN-H8A SPRING HANGER 23HB-H23 SPRING HANGER 23HB-$40 RIGID RESTRAINT SYSTEM MAIN STEAM 1DB-Hi 67(IA)

INTEGRAL ATTACHMENT 1-2A26-20 1-2A26-25 1-2B26-21 1-2B26-24 1-2MSA14-1 1-2MSB14-1 1-2C26-20 1-2C26-22BC 1-2C26-23 1-2D26-20 1-2D26-23 1-2MSB18-6 PIPE TO ELBOW PIPE TO VALVE PIPE TO ELBOW PIPE TO VALVE TEE TO ELBLOW TEE TO PIPE PIPE TO ELBOW BRANCH CONNECTION PIPE TO VALVE PIPE TO ELBOW PIPE TO VALVE ELBOW TO VALVE F-A F-A F-A F-A F-A F-A F-A C-C C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 ITEM NO Page 28 of 39 NDE METHOD OUTAGE REMARKS F1.40 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 3R14 3R14 3R14 3R15 3R16 3R16 3R16 C3.20 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.81 C5.51 C5.51 C5.51 C5.51 MT or PT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT 3R15 3R13 3R13 3R13 3R13 3R13 3R13 3R14 3R14 3R14 3R14 3R14 3R15

SCHEDULE DATE - 3/29/02 REVISION - 1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS SYSTEM MAIN STEAM I-2MSD6-1 1-2MSD6-2 1DB-HI2 1DB-H20 1DB-H22 7DB-H79 IDB-H32 IDB-H34 1DB-H43 1DB-H44 1DB-H46 1DB-H167 7DB-SI2 COMPONENT DESC 2

BRANCH CONN TO ELBOW ELBOW TO PIPE SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER HYDRAULIC SNUBBER SYSTEM REACTOR CORE ISOLATION COOLING RCIC PT RCIC PT RCIC PT SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST EXAM CAT ITEM NO Page 29 of 39 NDE METHOD OUTAGE REMARKS C-F-2 C-F-2 F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A C5.51 C5.51 FI.20 FI.20 F1.20 F1.20 F1.20 F1.20 F1.20 Fl.20 Fl.20 F1.20 F1.20 MTor PT& UT MT or PT & UT VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 3R15 3R15 3R13 3R13 3R13 3R13 3R14 3R14 3R14 3R14 3R14 3R15 3R15 C-H C-H C-H C7.XX C7.XX C7.XX VT-2 VT-2 VT-2 3R12 3R14 3R15

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 2

SYSTEM RESIDUAL HEAT REMOVAL 10-2HXA-1 UPPER SHELL-TO-FLANGE 10-2HXA-2 LOWER SHELL-TO-FLANGE N4(RP)-A N4 REINFORCING PLATE N4-A OUTLET NOZZ RHRHX-A N3(RP)-A N3 REINFORCING PLATE N3-A INLET NOZZLE RHRHX-A 1OHB-HI4(IA) 10DDN-H92(IA)

I0HB-H33(IA)

IODDN-H66A(IA)

IOGB-H67(IA)

IOHB-H41(IA)

I0GB-H69(IA)

I 0GB-H78(IA) 10GB-S60(IA)

RHRHX-A-LS(IA)

I0GB-H50(IA)

IOHB-SlO(IA)

INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT C-F-2 C5.51 MT or PT & UT EXAM CAT ITEM NO Page 30 of 39 NDE METHOD OUTAGE REMARKS C-A C-A C-B C-B C-B C-B C-C C-C C-C C-C C-C C-C C-C C-C C-C C-C C-C C-C CI.10 C1.10 C2.31 C2.33 C2.31 C2.33 C3.20 C3.20 C3.20 C3.20 C3.20 C3.20 C3.20 C3.20 C3.20 C3.10 C3.20 C3.20 UT UT MT or PT VT-2 MT or PT VT-2 MT or PT MT or PT MT or PT MT or PT MT or PT MT or PT MT or PT MT or PT MT or PT MT or PT MT or PT MT or PT 3R13 3R15 3R13 3R13 3R15 3R15 3R12 3R13 3R13 3R14 3R14 3R14 3R15 3R15 3R15 3R15 3R16 3R16 3R12 10-2SCSA20-3 ELBOW TO PIPE

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 2

SYSTEM RESIDUAL HEAT REMOVAL 10-2SCSA20-5 10-2SCSC20-3 10-2SCSC20-5 10-2CSIAI 2-1 10-2CSIA 12-3 10-2DC18-1 10-2SC24-3 10-2TSC24-1 10-2XC024-1 A 10-2CSIB12-7 10-2DB 18-1 10-2DB20-11 10-2SB24-3 10-2SCS20-2 10-2TSB24-1 10-2XBO24-1 A 10-2DA18-1 I 0-2DA24-18 10-2SA24-4 10-2TIA18-16BC 10-2TIA6-2 10-2TIA6-4 10-2TSA24-1 10-2XA020-10 10-2XA020- 11 A ELBOW TO PIPE ELBOW TO PIPE ELBOW TO PIPE TEE TO PIPE VALVE TO PIPE PUMP TO REDUCER PIPE TO PUMP PENETRATION TO ELBOW NOZZLE TO REDUCER ELBOW TO PIPE PUMP TO REDUCER ELBOW TO PIPE PIPE TO PUMP TEE TO VALVE PENETRATION TO ELBOW NOZZLE TO REDUCER PUMP TO REDUCER REDUCER TO NOZZLE PIPE TO PUMP BRANCH CONNECTION PIPE TO ELBOW PIPE TO ELBOW PENETRATION TO ELBOW PIPE TO ELBOW PIPE TO PIPE EXAM CAT ITEM NO Page 31 of 39 NDE METHOD OUTAGE REMARKS C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.81 C5.51 C5.51 C5.51 C5.51 C5.51 MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT 3R12 3R12 3R 12 3R13 3R13 3R13 3R13 3R13 3R13 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3R15 3R15 3R15 3R15 3R15 3R15 3R15 3R15 3R15

SCHEDULE DATE. 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 2

SYSTEM RESIDUAL HEAT REMOVAL 10-2XA020-2 10-2XA024-1A 10-2FPCA16-10 10-2FPCA16-12 10-2SD24-4 10-2TSD24-I 10-2XD020-II 10-2XD020-8 A RHR PT B RHR PT A RHR PT B RHR PT A RHR DW Spray HT A RHR PT B RHR DW Spray HT B RHR PT RHR SDC HT IOHB-H14 IOHB-H28 IOHB-H36 IODDN-H92 1OGB-H57 ELBOW TO PIPE NOZZLE TO REDUCER PIPE TO ELBOW PIPE TO ELBOW PIPE TO PUMP PENETRATION TO ELBOW ELBOW TO PIPE VALVE TO ELBOW SYSTEM PRESS/PARTIAL HYDRO TEST SYSTEM PRESS/PARTIAL HYDRO TEST SYSTEM PRESS/PARTIAL HYDRO TEST SYSTEM PRESS/PARTIAL HYDRO TEST SYSTEM PARTIAL HYDRO TEST SYSTEM PRESS/PARTIAL HYDRO TEST SYSTEM PARTIAL HYDRO TEST SYSTEM PRESS/PARTIAL HYDRO TEST SYSTEM PARTIAL HYDRO TEST SPRING HANGER SPRING HANGER SPRING HANGER RIGID RESTRAINT SPRING HANGER EXAM CAT ITEM NO Page 32 of 39 NDE METHOD OUTAGE REMARKS C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C5.51 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-H C-H C-H C-H C-H C-H C-H C-H C-H MT or PT & UT MT or PT & UT MT or PT & UT MTor PT& UT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-3 VT-3 VT-3 VT-3 VT-3 3R15 3R15 3R16 3R16 3R16 3R16 3R16 3R16 3R12 3R12 3R14 3R14 3R16 3R16 3R16 3R 16 3R16 3R12 3R12 3R12 3R13 3R13 C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX C7.XX F1.20 F1.20 Fl.20 F1.20 FI.20 F-A F-A F-A F-A F-A

SCHEDULE DATE - 3/29/02 REVISION-1 COMPONENT ID ASME XI CODE CLASS PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT DESC EXAM CAT ITEM NO NDE METHOD Page 33 of 39 OUTAGE 2

SYSTEM RESIDUAL HEAT REMOVAL SPRING HANGER RIGID RESTRAINT SPRING HANGER SPRING HANGER RIGID RESTRAINT SPRING HANGER SPRING HANGER SPRING HANGER RIGID RESTRAINT SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER SPRING HANGER ANCHOR SPRING HANGER RIGID RESTRAINT LOWER SUPPORT UPPER SUPPORT 1 UPPER SUPPORT 2 SPRING HANGER SPRING HANGER RIGID RESTRAINT SPRING HANGER RIGID RESTRAINT REMARKS IOGB-H88 10GB-S88 I0 HB-H22 IOHB-H33 IODDN-H66A 1OGB-H157 1OGB-H47 1OGB-H67 10GB-S56 I0HB-HI 10HB-H41 1OGB-H69 1OGB-H78 IOGB-H89 I0GB-S60 10HB-H31 1OMO-S79 RHRHX-A-LS RHRHX-A-US I RHRHX-A-US2 10GB-H134 10GB-H50 1OGB-S46 10HB-H11 IOHB-S10 F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.40 F1.40 F1.40 F1.20 F1.20 F1.20 F1.20 F1.20 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 3R13 3R13 3R13 3R13 3R14 3R14 3R14 3R14 3R14 3R14 3R14 3RIS 3R15 3R15 3R15 3R15 3R15 3R15 3R15 3R15 3R16 3R16 3R16 3R16 3R16

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 2

SYSTEM SCRAM DISCHARGE VOLUME 3-2SSV8-14 3-2SSV8-16 3-2STV12-1 3-2NSV8-14 3-2NSV8-17 3-2NSV8-21 SDV PT SDV PT SDV PT 3GE-H20 3GE-H40 3GE-H95 3GE-HSI S5 3GE-H310 3GE-H375 S8 PIPE TO ELBOW WELDOLET TO TANK CAP TO PIPE PIPE TO ELBOW ELBOW TO PIPE ELBOW TO PIPE SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT EXAM CAT ITEM NO Page 34 of 39 NDE METHOD OUTAGE REMARKS C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C5.51 C5.81 C5.51 C5.51 C5.51 C5.51 C7.XX C7.XX C7.XX F1.20 F1.20 FI.20 FI.20 F1.20 F1.20 F1.20 F1.20 MT or PT & UT MT or PT MT or PT & UT MT or PT & UT MT or PT & UT MT or PT & UT VT-2 VT-2 VT-2 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 C-H C-H C-H F-A F-A F-A F-A F-A F-A F-A F-A 3R13 3RI3 3R13 3R15 3R15 3R15 3R12 3R14 3R15 3R12 3R12 3R12 3R13 3R15 3R16 3R16 3R16

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 2

SYSTEM STANDBY LIQUID CONTROL SLC PT SYSTEM PRESSURE TEST SLC PT SYSTEM PRESSURE TEST SLC HT SYSTEM HYDRO TEST NUMBER OF CLASS: 2 ASME XI CODE CLASS COMPONENTS 3

SYSTEM EMERGENCY COOLING WATER SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM EMERGENCY SERVICE WATER INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT ESW PT SYSTEM PRESSURE/HYDRO TEST EXAM CAT ITEM NO Page 35 of 39 NDE METHOD OUTAGE REMARKS C-H C-H C-H C7.XX C7.XX C7.XX VT-2 VT-2 VT-2 226 3R13 3R14 3R16 ESW/ECW PT ESW/ECW PT ESW/ECW PT D-B D-B D-B D2.10 D2.10 D2.10 VT-2 VT-2 VT-2 33HB-H144(IA) 33HB-HI45(IA) 33HB-H127(IA) 33HB-S73(IA) 3R13 3R14 3R15 D-A D-A D-A D-A D1.20 D1.20 D1.20 D1.20 VT-3 VT-3 VT-3 VT-3 3R14 3R14 3R15 3R15 3R12 D-B D2.10 VT-2

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 3

SYSTEM EMERGENCY SERVICE WATER ESW PT SYSTEM PRESSURE/HYDRO TEST ESW PT SYSTEM PRESSURE/HYDRO TEST 33HB-H 127 RIGID RESTRAINT 33HB-$63 RIGID RESTRAINT 33HB-H88 RIGID RESTRAINT 33HB-S151 RIGID RESTRAINT 33HB-H 144 SPRING HANGER 33HB-H1145 SPRING HANGER 33HB-S121 RIGID RESTRAINT 33HB-S 123 RIGID RESTRAINT 33HB-S 125 RIGID RESTRAINT 33HB-S132 RIGID RESTRAINT 33HB-S 133 RIGID RESTRAINT 331HB1-H1127 RIGID RESTRAINT 33HB-S122 RIGID RESTRAINT 33HB-S 124 RIGID RESTRAINT 33HB-S 126 RIGID RESTRAINT 33HB-$73 RIGID RESTRAINT 33HB-$74 RIGID RESTRAINT 33HB-H152 SPRING HANGER 33HB-S 145 RIGID RESTRAINT EXAM CAT ITEM NO Page 36 of 39 NDE METHOD OUTAGE REMARKS D-B D-B F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A D2.10 D2.10 FI.30 F1.30 F1.30 F1.30 F1.30 F1.30 FI.30 F1.30 F1.30 F1.30 F1.30 F1.30 Fl 30 F1.30 F1.30 F1.30 F1.30 F1,30 F1.30 VT-2 VT-2 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 3R14 3R15 3R12 3R12 3R13 3R13 3R14 3R14 3R14 3R14 3R14 3R 14 3R14 3R15 3R15 3R 15 3R15 3R15 3R15 3R16 3R16

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 3

SYSTEM HIGH PRESSURE SERVICE WATER 32GB-H65(IA) 32GB-S23(IA) 32GB-S24(IA) 32GB-S51A(IA)

HPSW PT HPSW PT HPSW PT 32GB-H65 32GB-S28 32GB-S30 32GB-S19 32GB-S23 32GB-S24 32GB-S27 32GB-$44 32GB-S55 32GB-H42 32GB-S51A 32MO-H57 3BP42-SC INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SYSTEM PRESSURE/HYDRO TEST SPRING HANGER RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT RIGID RESTRAINT SPRING HANGER RIGID RESTRAINT SPRING HANGER PUMP SUPPORT EXAM CAT ITEM NO Page 37 of 39 NDE METHOD OUTAGE REMARKS D-A D-A D-A D-A D-B D-B D-B F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A D1.20 D1.20 D1.20 D1.20 D2.10 D2.10 D2.10 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F.-30 F1.30 F1.30 FI.30 F1.30 F1.30 F1.40 VT-3 VT-3 VT-3 VT-3 VT-2 VT-2 VT-2 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 3R12 3R13 3R13 3R16 3R13 3R14 3R15 3R12 3R12 3R12 3R13 3R13 3R13 3R13 3R14 3R14 3R16 3R16 3R16 3R16

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC 3

SYSTEM MAIN STEAM RELIEF VALVE IGG-H295(IA) 1GG-S210K(IA)

I GG-S51 (IA) 1GG-H291(IA) 1GG-H305(IA)

I GG-H306(IA)

IGG-S21OF(IA)

IGG-S55(IA)

IGG-H299(IA)

IGG-H313(IA)

I GG-S49(IA)

IGG-H295 1GG-S210K 1GG-S210L lGG-S51 1GG-H291 IGG-H305 1GG-S210B IGG-S210C 1GG-H290 IGG-H306 IGG-H323 INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT SPRING HANGER GUIDE GUIDE SNUBBER SPRING HANGER SPRING HANGER GUIDE GUIDE SPRING HANGER SPRING HANGER SPRING HANGER EXAM CAT ITEM NO Page 38 of 39 NDE METHOD OUTAGE REMARKS D-A D-A D-A D-A D-A D-A D-A D-A D-A D-A D-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A D1.20 D1.20 D1.20 D1.20 D1.20 D1.20 D1.20 D1.20 D1.20 D1.20 DI.20 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 FF130 F1.30 F1.30 FI.30 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 3R12 3R12 3R12 3R13 3R13 3R14 3R14 3R14 3R15 3R15 3R15 3R12 3R12 3R12 3R12 3R13 3R13 3R13 3R13 3R14 3R14 3R14

SCHEDULE DATE - 3/29/02 REVISION-1 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 THIRD INTERVAL ISI EXAMINATION/TEST SCHEDULE SECTION XI ISI COMPONENT ID ASME XI CODE CLASS COMPONENT DESC EXAM CAT ITEM NO 3

SYSTEM MAIN STEAM RELIEF VALVE 1GG-S21OF GUIDE IGG-S55 HYDRAULIC SNUBBER 1 GG-H299 SPRING HANGER IGG-H313 SPRING HANGER 1GG-S21OG GUIDE IGG-$49 HYDRAULIC SNUBBER F-A F-A F-A F-A F-A F-A F1.30 F1.30 F1.30 F1.30 F1.30 F1.30 COMPONENTS 77 Page 39 of 39 NDE METHOD OUTAGE REMARKS VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 3R14 3R14 3R15 3R15 3R15 3R15 NUMBER OF CLASS: 3