Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML24022A2262024-01-22022 January 2024 Submittal of the Inservice Inspection (ISI) Owners Activity Report (OAR) for the 24th Refueling Outage for Unit 3 CCN:22-14, Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 32022-01-31031 January 2022 Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 3 ML21041A4502021-02-0909 February 2021 (PBAPS) Unit 2 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 2 ML20034E3322020-01-29029 January 2020 (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 22nd Refueling Outage for Unit 3 ML19308A0112019-10-31031 October 2019 Relief Request I4R-63 Associated with the Fourth Inservice Inspection (ISI) Interval ML19233A1332019-08-21021 August 2019 Inservice Inspection Relief Request 15R-10 ML19050A3522019-02-19019 February 2019 Submittal of the Snubber Inservice Testing Program Plan for the Fifth 10-Year Interval ML19024A1952019-01-23023 January 2019 Results of Visual Inspections of Unit 2 Replacement Steam Dryer in the Second Refueling Outage After Reaching EPU Conditions ML19025A0312019-01-16016 January 2019 (Pbaps), Unit 2 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 22nd Refueling Outage for Unit 2 ML18337A1962018-11-29029 November 2018 Submittal of the Fifth Ten-Year Interval Inservice Testing Program Plan ML18030A1902018-01-30030 January 2018 Results of Visual Inspections of Unit 3 Replacement Steam Dryer ML17039A8842017-02-0909 February 2017 Submittal of the In-Service Inspection (ISI) Owner'S Activity Report (OAR) for the 21st Refueling Outage ML16189A2182016-06-29029 June 2016 BWR Vessel and Internals Project - Vessel Internals Inspection Summaries for Fall 2015 Outages ML16118A4142016-04-27027 April 2016 Submittal of Relief Request Associated with the Fourth Inservice Testing Interval - Pressure Isolation Valve Leakage Testing Frequency ML16021A0892016-01-20020 January 2016 Submittal of the In-Service Inspection (ISI) Owner'S Activity Report (OAR) for the 20th Refueling Outage ML15225A5922015-08-13013 August 2015 Responds to Request for Additional Information Regarding Proposed Relief Request Associated with the Common Emergency Service Water (Esw)System Piping ML15068A3502015-03-0303 March 2015 Submittal of the In-Service Inspection (ISI) Owner'S Activity Report (Oar)For the 20th Refueling Outage for Unit 2 and Supplement to the 18 Refueling Outage OAR RS-14-316, Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System Operating Pressure2014-10-29029 October 2014 Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System Operating Pressure ML14021A0462014-01-21021 January 2014 Submittal of the Inservice Inspection (ISI) Owner'S Activity Report for the 19th Refueling Outage for Unit 3 ML13022A0302013-01-17017 January 2013 Submittal of the Inservice Inspection (ISI) Owner'S Activity Report for the 19th Refueling Outage ML12012A2192012-01-11011 January 2012 Submittal of the Inservice Inspection (ISI) Owner'S Activity Report for the 18th Refueling Outage ML1100700232011-01-0505 January 2011 Submittal of Inservice Inspection (ISI) Owner'S Activity Report for the 18th Refueling Outage ML1001901312010-01-0808 January 2010 Submittal of Inservice Inspection (ISI) Owner'S Activity Report for the 17th Refueling Outage ML0903301712009-01-29029 January 2009 Submittal of Third Interval Inservice Inspection (ISI) Owners Activity Reports ML0832300562008-11-13013 November 2008 Submittal of Program for the Fourth Ten-Year Interval Inservice Testing Program ML0806405872008-02-29029 February 2008 Submittal of Relief Requests Associated with the Third and Fourth Inservice Inspection (Lsi) Intervals and the First and Second Containment Inservice Inspection (Cisi) Intervals RS-07-058, Amergen/Exelon Nuclear - Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements2007-04-19019 April 2007 Amergen/Exelon Nuclear - Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements ML0212700072002-04-26026 April 2002 Submittal of the Third 10-Year Interval First Inspection Period, Inservice Inspection Owners Activity Report 2024-01-22
[Table view] Category:Letter
MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection 2024-09-06
[Table view] |
Text
,,,,_,
Exelon Generation 10CFR 50.55a January 16, 2019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station (PBAPS) Unit 2 Renewed Facility Operating License No.
DPR-44 NRC Docket No. 50-277
Subject:
Submittal of the lnService Inspection (ISi) Owner's Activity Report (OAR) for the 22nd Refueling Outage for Unit 2 Attached is the ISi Owner's Activity Report covering ISi activities associated with the third period of the 4th ISi inspection interval for Unit 2. This report is submitted pursuant to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, "Rules for the lnservice Inspection of Nuclear Power Plant Components," Article IWA-6200, "Requirements" (2001 Edition through 2003 Addenda) and ASME Code Case N-532-5 (Repair/Replacement Activity Documentation Requirements and lnservice Inspection Summary Report Preparation and Submission,Section XI, Division 1).
If you have any questions or require additional information, please contact Bryce Sessions at 717-456-3863.
Sincerely,
~7h___
Matthew J. Herr Plant Manager Peach Bottom Atomic Power Station Attachment cc: US NRC, Regional Administrator, Region 1 US NRC, PBAPS Senior Resident Inspector R. R. Janati, Commonwealth of Pennsylvania D. Tancabel, State of Maryland B. Watkins, PSEG, Financial Control and Co-owner Affairs CCN: 19-14
FORM OAR*l OWNER'S ACTlVITY REPORT Plant Peach Bottom Atomic Power Station, 1848 Lay Road, Delta, PA 17314 Unit No. _ _ _2_____ Commercial Seivlce Date ----=J..;;;u.;..r.ly-=5;.L,..;;;;1..:;..97:....4.;..____ Refueling Outage Number ----=2:.:2_ __
(It applicable) current Inspection Inteival ISI =Fourth Inspection Interval I OSI =Second Inspection Interval 111, (tst, 2nd, 3rc1, 4 other)
Current Inspection Period ISI =Third Inspection Period / OSI =Third Inspection Period (1st, 2nd, Jrd )
Edition and Addenda of Section XI applicable to the Inspection Plans ASME Section XI 2001 Ed. through 2003 Add.
Date and Revision of Inspection Plans ISI Program Plan (PBT05.G03), Rev. 4 (9/2/2014 ), ER-PB-330-1001, Rev. 0 (9/18/2018)
Edition and Addenda of Section XI applicable to repair/replacement activities, If different than the Inspection plans Same as above Code cases used: N-432-1, N-460, N-504-4, N-508-4, N-513*3, N-513-4, N-516*3, N-517-1, N-526, N-528-1, N-532-5, N-552, N-552-1, N-561-2, N-562*2, N-566-2, N-578*1, N-586*1, N-597-2, N-600, N-606*1, N-613*1, N-613*2, N-624, N-629, N-638-4, N-638-6, N-639, N-641, N-648*1, N-651, N-652*1, N-652*2, N-653-1, N-661*2, N-666, N-666*1, N-685, N-686-1, N-695, N-696, N*
700, N-702, N-705, N-730, N-730*1, N-733, N-735, N-747, N-751, N-753, N-762, N-765, N-769, N-769*2, N-773, N-786*1, N-789, N-798, N-800, N-803, N-805, N-823, N-845 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made In this report are correct; (b) the examinations and tests, meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of P2R22 conform to the requirements of Section XI
~~ (
(:s:J or own gnee.
Program Owner W-e)
Sl.H*)a" (refUellng outage number)
CERTIFICATE OF INSERVICE INSPEcnON I, the undersigned, holding a valid commission Issued by the National Soard of Boller and Pressure Vessel Inspectors and employed by The Hartford Steam Boller Inspection and Insurance Company of Hartford, Connecticut have Inspected the Items described In this owner's Activity Report, and state that, to the best of my knowledge and belief, the owner has performed all activities represented by this report In accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied concerning the repair/replacement activities and evaluation described In this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner ~ any personal In *ury or p erty damage or a loss of any kind arising from or connected with this Inspection.
~~Ul!':!....L.~~:!!:'!~~.==::=_ _ _ Commissions nspector's Signature) (National Board Number and Endorsement)
Date 1l/s:ho19
TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Examination Item hem Description Evaluation Description Cateaorv Number N/A N/A N/A N/A
I TABLE2 ABSTRACT OF ASME REPAIRS/REPLACEMENTS ACTIVITIES REQUIRED FOR CONTINUED SERVICE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 11/11/16 TO 10fJOl18
( END OF 2R22 REFUEL OUTAGE)
SYSTEMD1: Main Steam (MS) Flaw or Relevant Repair, Condition Found Replacement, DurinQ Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure lcomnnnent 1.0.\ Descriotion Of Work Performed Or Test Comolete RlliR Plan #and W/O #
1 Replacement A0-2-01 A-0808 ReOlacement of 1 stud and 2 nuts on A0-2-01A-080B No 10/2612018 18-021, 04329928 1 Replacement A0-2-01A-080C Replacement of 5 stud and 5 nuts on A0-2-01A-080C No 10/26/2018 18-022, 04329928 2 Reolacement MS 4* Line Cut and Cao 4* MS Line Upstream of M0-2469 No 10/25/2018 , 8-039, 04746115
-
- I SYSTEMB: Off-Oas/Steam Jet Air Ejector Flaw or Relevant Repair, ! Condition Found Replacement, During Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure fcomnonent I.DJ Descrintion Of Work Performed Or Test Comnlete RlliR Plan #and W/O #
1 2 Replacement HV-2-0BA-43001 A Install new MS lsol Viv for SJAE Train A No Not Comoleted 18-045, 04762849
- 1. AU associated work was not completed. IA #04211066 will track this work until completion and this ~ r wiU be included in the next OAR-1 cvcle.
SYSTEM 65A: HYDRAULIC SNUBBERS Aaw or Relevant Repair ,
Replacement, - Condition Found During Scheduled Code or Corrective Item Descriptl~n Section XI Exam Date Class Measure lcom...,..nent 1.0 .\ Descrintion Of Work Performed o r-Test Comolete RlliR Plan # and W/O #
1 Replacement SS-D-7 Replace hydraulic snubber SS-0-7 No 10/21/2018 18-082, 04765881 SYsTEllf SsB: MECHANICAL SNUBBERS
-- - Flaw or Relevant Repair, Condition Found Replacement, During Scheduled Code or Corrective Item Description Section XI Exam Date Class Measure lcomnnnent I.DJ Descriotion Of Work Performed Or Test Comolete R&R Plan #and W/O #
1 Replacement M-295-49-H2 Reolace mechanical snubber M-295-49-H2 No 10/2412018 18-046, 04761843 2 Replacement 10-GB-S-75 Replace mechanical snubber 10-GB-S-75 No 10/1512018 16-048, 04762876 2 Replacement 1Q-GB-S-92 Replace mechanical snubber 10-GB-S-92 No 10/15/2018 18-053, 04763267 i
I I
I I