ML17244A570

From kanterella
Revision as of 15:02, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Responds to IE Bulletins79-06A & 79-06A,Revision 1.No Tech Spec Changes Required at This Time.Change Will Be Requested When Design & Safety Evaluations Are Prepared
ML17244A570
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/18/1979
From: WHITE L D
ROCHESTER GAS & ELECTRIC CORP.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 7906270200
Download: ML17244A570 (2)


Text

r<<IIp'//j'/g/j/,'Il/gg/JI/rejig ROCHESTER GASANDELECTRICCORPORATION~1~sslz89EASTAYEVVE,ROCHESTR,N.Y.14649LEOND.WHITE,JR,VICEPRESIDCNT May18,1979TELKPwOhE JIIIKAcoos7re546.2700Mr.BoyceH.Grier,DirectorU.S.NuclearRegulatory Commission OfficeofInspection andEnforcement RegionI631ParkAvenueKingofPrussia,Pennsylvania 19406

Subject:

ResponsetoItem13ofIEBulletins 79-06Aand79-06A,RevisionIentitled"Reviewofoperational errorsandsystemmisalignments identified duringtheThreeMileIslandIncident.

"R.E.GinnaNuclearPowerPlant,Unit41DocketNo.50-244

DearMr.Grier:

"ThisisinreplytoInspection andEnforcement Bulletins 79-06Aand79-06A,RevisionI,Item13concerning anyproposaltochangePlantTechnical Specifications andanydesignchangesasaresultofimplementation oftheotheritemsinthesebulletins.

NoTechnical Specification changesarerequiredatthistimeasaresultofitemsidentified inourresponses totheabovebulletin.

However,wearecurrently investigating amodification tothesafetyinjection logicwhichwouldinitiatesafetyinjection onatwooutofthree(2/3)lowpressurizer pressuresignal.ThiswillrequirechangingTechnical Specification table3.5-2Item1.d.Achangewillberequested whenthedesignandsafetyevaluation areprepared.

Verytrulyyours,L.D.Whe,jr.xc:NRCOfficeofInspection andEnforcement DivisionofReactorOperations Inspection Washington, D.C.20555