Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply
ML17265A727
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/30/1999
From: Popp R
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17265A728 List:
References
REF-PT21-99 NUDOCS 9908060102
Download: ML17265A727 (4)


Text

CATEGORY 1 WO REGULAR'CRY'NFORMATION DISTRIBUTIO SYSTEM (RIDS) r

~

ACCESSION NBR:9908060102 DOC.DATE: 99/07/30 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME '- AUTHOR AFFILIATION POPP,R.W., Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATXON VISSXNG,G.S. Records Management Branch (Document Control Desk)

SUBJECT:

Forwards 10CFR21 interim rept per reporting of defects &

noncompliance, section 21 (a) (2).Interim rept prepared because evaluation cannot be completed within 60 days from discovery of deviation or failure to comply.

DISTRIBUTION CODE: IE19T COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Part 21 Rept (50 DKT) E NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES XD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL VIS 1 1 INTERNA FILE CENTER 01 1 1 NRR/DIPM/IQMB 1 1 1 1 PDR WARD, M. 1 1 RES/DET/ERAB 1 1 RGN1 1 1 RGN2 1 1 RGN3 1 1 RGN4 1 1 EXTERNAL: INPO RECORD CTR 1 1 NOAC SILVER,E 1 1 NRC PDR 1 1 NUDOCS FULL TXT 1 1 D 0

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE."TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPXES REQUIRED: LTTR 14 ENCL 14

4 I

Q Aen ROCHESTER GAS AND EIECIIC CORPORATION + 89 EASTAVENUE, ROCHESTER, N. Y Idbf9 0001 AREA CODE716 54'6-2700 ROBERT C. MECREDY Vice President Hudear Operations July 30, 1999 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I Washington, D.C. 20555

Subject:

10 CFR Part 21 Interim Report R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

The attached 10 CFR 21 interim report is submitted in accordance with 10 CFR Part 21, Reporting of Defects and Noncompliance, Section 21 (a) (2), which requires "if an evaluation of an identified deviation or failure to comply potentially associated with a substantial safety hazard cannot be completed within 60 days from discovery of the deviation or failure to comply, an interim report is prepared and submitted to the Commission".

Very truly yours, Robert W. Popp Superintendent Ginna Production xc: Mr. Guy S. Vissing (Mail Stop SC2)

Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Regional Administrator, Region I U.S'. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector 9908060i02 990730 PDR S s.""