Category:CORRESPONDENCE-LETTERS
MONTHYEARML17250B3041999-10-20020 October 1999 Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated IR 05000244/19990081999-10-14014 October 1999 Forwards Insp Rept 50-244/99-08 on 990809-0919.Severity Level IV Violation of NRC Requirements Occurred & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML17265A7651999-10-0808 October 1999 Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request ML17265A7631999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 ML17265A7641999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel ML20212J3561999-09-30030 September 1999 Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 ML20212J3801999-09-30030 September 1999 Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 IR 05000244/19990051999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7571999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs IR 05000244/19992011999-09-24024 September 1999 Forwards Insp Rept 50-244/99-201 (Operational Safeguards Response Evaluation) on 990621-24.No Violations Noted. Primary Purpose of Osre to Assess Licensee Ability to Respond to External Threat.Insp Rept Withheld ML17265A7461999-08-31031 August 1999 Submits Response to NRC Administrative Ltr 95-03,rev 2, Availability of Reactor Vessel Integrity Database,Version, Dtd 990726 ML17265A7401999-08-26026 August 1999 Requests Approval for Use of Relief Request Number 35 Re Use of ASME Section XI Code,1995 Edition,1996 Addenda.Code Will Be Used to Develop Plant Fourth 10-year Interval ISI Program on Class 1,2 & 3 Components ML17265A7411999-08-26026 August 1999 Forwards LER 99-004-01 Re Plant Being Outside Design Basis Due to Containment Recirculation Fan Moisture Separator Vanes Being Incorrectly Installed.Part 21 Notification of 990512 Is Being Rescinded ML17265A7451999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Rept for Six Months Ending 990630,per 10CFR26.71(d) ML17250B3021999-08-23023 August 1999 Informs That Util & NRC Had Conference Call on 990816 to Review Approach in Responding to Questions,As Result of Questions Re Main Steam Check Valve Performance Included in Insp Rept 50-244/99-05,dtd 990806 ML17265A7271999-07-30030 July 1999 Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply ML17265A7151999-07-23023 July 1999 Forwards LER 99-007-01 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Reactor Trip.Further Investigation of Event Identified Addl Corrective Actions ML17265A7061999-07-22022 July 1999 Forwards LER 98-003-02,re Actuations of CR Emergency Air Treatment Sys.All Creats Actuations,Including Those Originally Believed to Be Valid Actuations,Were,In Fact Invalid Actuations ML17265A7191999-07-21021 July 1999 Forwards Ginna Station ISI Rept for Refueling Outage Conducted in 1999 ML17265A7141999-07-21021 July 1999 Withdraws Relief Request 35 for Plant Inservice Insp Program Section XI Requirements,Submitted on 980806.Licensee Plans to Resubmit Relief Request,Which Includes Addl Level of Detail,In Near Future ML17265A7041999-07-16016 July 1999 Submits Info Re Specific Licensing Actions Which May Be Expected to Generate Complex Reviews,In Response to Administrative Ltr 99-02,dtd 990603 ML17265A6911999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Readiness Disclosure Attached ML17265A6871999-06-22022 June 1999 Forwards Response to RAI Made During 990225 Telcon Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Calculation Encl. Encl ML17265A6841999-06-21021 June 1999 Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment ML17265A6741999-06-15015 June 1999 Submits Annual ECCS Rept IAW 10CFR50.46(a)(3)(ii) Requirements.No Changes Have Been Made to Large Break LOCA PCT & Small Break LOCA PCT ML17265A6751999-06-11011 June 1999 Responds to NRC RAI Re Licensee GL 96-05 Program.Encl Info Verifies That Util Is Implementing Provisions of JOG Program on MOV Periodic Verification ML17309A6551999-06-0707 June 1999 Responds to NRC 990310 RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML17265A6671999-06-0101 June 1999 Requests Approval of Ginna QA Program for Radioactive Matl Packages,Form 311,approval Number 0019.Ginna QA Program for Station Operation, Was Most Recently Submitted to NRC by Ltr Dtd 981221 & Supplemented on 990301 ML17265A6641999-05-25025 May 1999 Forwards Addl Info on Use of GIP Method a for Re Ginna Nuclear Power Plant.Copy of Re Ginna Station USI A-46 Outlier Resolution Table as Requested ML17265A6611999-05-24024 May 1999 Forwards LER 99-007-00 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Rt.Util Is Planning to Submit Suppl to LER by 990730 ML20206U0921999-05-13013 May 1999 Forwards Four Copies of Rev R to Gnpp Security Plan,Per Provisions of 10CFR50.54(p).Rev Clarifies Armed Response Team Assignments & Does Not Degrade Physical Security Effectiveness.Rev Withheld,Per 10CFR73.21 ML17265A6461999-05-12012 May 1999 Forwards 1998 Annual Radioactive Effluent Release Rept & 1998 Annual Radiological Environ Operating Rept, for Re Ginna NPP ML17265A6411999-05-12012 May 1999 Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630 ML20206E7221999-04-29029 April 1999 Forwards Four Copies of Rev Q to Re Ginna Nuclear Power Plant Security Plan,Per 10CFR50.54(p).Changes Do Not Degrade Physical Security Effectiveness.Encl Withheld,Per 10CFR73.21 ML20206H6911999-04-22022 April 1999 Forwards Info Requested During Informal Telcon on 980408 Concerning Upcoming Osre at Ginna Station.Info Requested Listed.Without Encls ML17265A6271999-04-19019 April 1999 Forwards Rev 0 & Rev 1 to Colr,Cycle 28 for Re Ginna NPP, Per TS 5.6.5 ML17309A6501999-04-14014 April 1999 Forwards Revised Ginna Station EOPs & Procedures Index ML17265A6121999-03-29029 March 1999 Forwards Rept on Status of Decommissioning Funding for Re Ginna Npp,For Which Rg&E Is Sole Owner,Per 10CFR50.75. Data Presented Herein,Current as of 981231 ML17265A6041999-03-24024 March 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(ii)(B) & 10CFR21.Addl Analyses Are Being Performed to Support Future Cycle Operation & Supplemental LER Is Scheduled to Be Submitted by 990618 ML17265A5671999-03-0101 March 1999 Forwards Application for Amend to License DPR-18,to Revise TSs Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6).Supporting Tss,Encl ML17265A5641999-03-0101 March 1999 Forwards Response to NRC 990217 RAI Concerning Changes to QA Program for Re Ginna Station Operation.Rg&E Is Modifying Changes Requested in 981221 Submittal.Modified QA Program,Encl ML17265A5551999-02-25025 February 1999 Informs That Util Is in Process of Revising fitness-for-duty Program,Developed in Accordance with 10CFR26.Util Will Continue to Use Dept of Health & Human Svcs Certified Test Facility for Majority of Tests During Yr ML17265A5561999-02-22022 February 1999 Forwards FFD Performance Data Rept for Six Months Ending 981231,per 10CFR26.71(d) ML17265A5451999-02-12012 February 1999 Forwards Simulator Four Year Certification Rept,Per 10CFR55.45(b)(5)(ii) ML17309A6491999-02-12012 February 1999 Forwards Ginna Station EOPs ML17265A5431999-02-0909 February 1999 Supplements 980806 Relief Request with Attached Table.Util Third 10-Yr ISI of Reactor Vessel Being Performed During 1999 Refueling Outage,Beginning on 990301 ML17265A5361999-02-0202 February 1999 Forwards Response to NRC 981203 RAI Re Resolution of Unresolved Safety Issue USI A-46.Util Does Not Agree with NRCs Interpretation.Detailed Bases,Encl ML17311A0691999-01-25025 January 1999 Forwards Revs to Ginna Station Emergency Plan Implementing Procedures (Epips).Previous Rev Had Incorrect Effective Date ML17311A0671999-01-14014 January 1999 Forwards Revised Emergency Operating Procedures for Re Ginna NPP ML17265A5131999-01-12012 January 1999 Forwards Revised Cover Page for Ginna Station Technical Requirements Manual (Trm), Rev 7,correcting Error in Effective Date 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17250B3041999-10-20020 October 1999 Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated ML17265A7651999-10-0808 October 1999 Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request ML17265A7631999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 ML17265A7641999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel ML20212J3561999-09-30030 September 1999 Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 ML20212J3801999-09-30030 September 1999 Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 IR 05000244/19990051999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7571999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7461999-08-31031 August 1999 Submits Response to NRC Administrative Ltr 95-03,rev 2, Availability of Reactor Vessel Integrity Database,Version, Dtd 990726 ML17265A7401999-08-26026 August 1999 Requests Approval for Use of Relief Request Number 35 Re Use of ASME Section XI Code,1995 Edition,1996 Addenda.Code Will Be Used to Develop Plant Fourth 10-year Interval ISI Program on Class 1,2 & 3 Components ML17265A7411999-08-26026 August 1999 Forwards LER 99-004-01 Re Plant Being Outside Design Basis Due to Containment Recirculation Fan Moisture Separator Vanes Being Incorrectly Installed.Part 21 Notification of 990512 Is Being Rescinded ML17250B3021999-08-23023 August 1999 Informs That Util & NRC Had Conference Call on 990816 to Review Approach in Responding to Questions,As Result of Questions Re Main Steam Check Valve Performance Included in Insp Rept 50-244/99-05,dtd 990806 ML17265A7451999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Rept for Six Months Ending 990630,per 10CFR26.71(d) ML17265A7271999-07-30030 July 1999 Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply ML17265A7151999-07-23023 July 1999 Forwards LER 99-007-01 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Reactor Trip.Further Investigation of Event Identified Addl Corrective Actions ML17265A7061999-07-22022 July 1999 Forwards LER 98-003-02,re Actuations of CR Emergency Air Treatment Sys.All Creats Actuations,Including Those Originally Believed to Be Valid Actuations,Were,In Fact Invalid Actuations ML17265A7191999-07-21021 July 1999 Forwards Ginna Station ISI Rept for Refueling Outage Conducted in 1999 ML17265A7141999-07-21021 July 1999 Withdraws Relief Request 35 for Plant Inservice Insp Program Section XI Requirements,Submitted on 980806.Licensee Plans to Resubmit Relief Request,Which Includes Addl Level of Detail,In Near Future ML17265A7041999-07-16016 July 1999 Submits Info Re Specific Licensing Actions Which May Be Expected to Generate Complex Reviews,In Response to Administrative Ltr 99-02,dtd 990603 ML17265A6911999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Readiness Disclosure Attached ML17265A6871999-06-22022 June 1999 Forwards Response to RAI Made During 990225 Telcon Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Calculation Encl. Encl ML17265A6841999-06-21021 June 1999 Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment ML17265A6741999-06-15015 June 1999 Submits Annual ECCS Rept IAW 10CFR50.46(a)(3)(ii) Requirements.No Changes Have Been Made to Large Break LOCA PCT & Small Break LOCA PCT ML17265A6751999-06-11011 June 1999 Responds to NRC RAI Re Licensee GL 96-05 Program.Encl Info Verifies That Util Is Implementing Provisions of JOG Program on MOV Periodic Verification ML17309A6551999-06-0707 June 1999 Responds to NRC 990310 RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML17265A6671999-06-0101 June 1999 Requests Approval of Ginna QA Program for Radioactive Matl Packages,Form 311,approval Number 0019.Ginna QA Program for Station Operation, Was Most Recently Submitted to NRC by Ltr Dtd 981221 & Supplemented on 990301 ML17265A6641999-05-25025 May 1999 Forwards Addl Info on Use of GIP Method a for Re Ginna Nuclear Power Plant.Copy of Re Ginna Station USI A-46 Outlier Resolution Table as Requested ML17265A6611999-05-24024 May 1999 Forwards LER 99-007-00 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Rt.Util Is Planning to Submit Suppl to LER by 990730 ML20206U0921999-05-13013 May 1999 Forwards Four Copies of Rev R to Gnpp Security Plan,Per Provisions of 10CFR50.54(p).Rev Clarifies Armed Response Team Assignments & Does Not Degrade Physical Security Effectiveness.Rev Withheld,Per 10CFR73.21 ML17265A6461999-05-12012 May 1999 Forwards 1998 Annual Radioactive Effluent Release Rept & 1998 Annual Radiological Environ Operating Rept, for Re Ginna NPP ML17265A6411999-05-12012 May 1999 Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630 ML20206E7221999-04-29029 April 1999 Forwards Four Copies of Rev Q to Re Ginna Nuclear Power Plant Security Plan,Per 10CFR50.54(p).Changes Do Not Degrade Physical Security Effectiveness.Encl Withheld,Per 10CFR73.21 ML20206H6911999-04-22022 April 1999 Forwards Info Requested During Informal Telcon on 980408 Concerning Upcoming Osre at Ginna Station.Info Requested Listed.Without Encls ML17265A6271999-04-19019 April 1999 Forwards Rev 0 & Rev 1 to Colr,Cycle 28 for Re Ginna NPP, Per TS 5.6.5 ML17309A6501999-04-14014 April 1999 Forwards Revised Ginna Station EOPs & Procedures Index ML17265A6121999-03-29029 March 1999 Forwards Rept on Status of Decommissioning Funding for Re Ginna Npp,For Which Rg&E Is Sole Owner,Per 10CFR50.75. Data Presented Herein,Current as of 981231 ML17265A6041999-03-24024 March 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(ii)(B) & 10CFR21.Addl Analyses Are Being Performed to Support Future Cycle Operation & Supplemental LER Is Scheduled to Be Submitted by 990618 ML17265A5641999-03-0101 March 1999 Forwards Response to NRC 990217 RAI Concerning Changes to QA Program for Re Ginna Station Operation.Rg&E Is Modifying Changes Requested in 981221 Submittal.Modified QA Program,Encl ML17265A5671999-03-0101 March 1999 Forwards Application for Amend to License DPR-18,to Revise TSs Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6).Supporting Tss,Encl ML17265A5551999-02-25025 February 1999 Informs That Util Is in Process of Revising fitness-for-duty Program,Developed in Accordance with 10CFR26.Util Will Continue to Use Dept of Health & Human Svcs Certified Test Facility for Majority of Tests During Yr ML17265A5561999-02-22022 February 1999 Forwards FFD Performance Data Rept for Six Months Ending 981231,per 10CFR26.71(d) ML17265A5451999-02-12012 February 1999 Forwards Simulator Four Year Certification Rept,Per 10CFR55.45(b)(5)(ii) ML17309A6491999-02-12012 February 1999 Forwards Ginna Station EOPs ML17265A5431999-02-0909 February 1999 Supplements 980806 Relief Request with Attached Table.Util Third 10-Yr ISI of Reactor Vessel Being Performed During 1999 Refueling Outage,Beginning on 990301 ML17265A5361999-02-0202 February 1999 Forwards Response to NRC 981203 RAI Re Resolution of Unresolved Safety Issue USI A-46.Util Does Not Agree with NRCs Interpretation.Detailed Bases,Encl ML17311A0691999-01-25025 January 1999 Forwards Revs to Ginna Station Emergency Plan Implementing Procedures (Epips).Previous Rev Had Incorrect Effective Date ML17311A0671999-01-14014 January 1999 Forwards Revised Emergency Operating Procedures for Re Ginna NPP ML17265A5131999-01-12012 January 1999 Forwards Revised Cover Page for Ginna Station Technical Requirements Manual (Trm), Rev 7,correcting Error in Effective Date ML17265A5111999-01-11011 January 1999 Requests Relief Per 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME Bp&V Code for ISI Program.Relief Requests 37,38 & 39 Encl ML17265A5101999-01-11011 January 1999 Requests Relief Per to 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME B&PV Code for ISI Program.Relief Request 40 Encl 1999-09-30
[Table view] |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9910260278 DOC.DATE: 99/08/23 NOTARIZED: NO DOCKET CIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 UTH.NAME AUTHOR AFFXLZATION ECREDY,R.C. Rochestez Gas E Electric Corp.
REC P'NAME RECIPIENT AFFILIATION VISITING,G.S.
SUBJECT:
Informs that util & NRC had conference call on 990816 to review approach in responding to questions, as result of questions re main steam check valve performance included in Insp 50-244/99-05,dtd 990806.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response E
NOTES:License Exp date in accozdance with 10CFR2,2.109(9/19/72). ,05000244 Q
RECIPIENT COPXES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL' LPD1-1 1 1 VISSXNG,G 1 INTERNAL: AE 1 1 DEDRO 1 1 LE CENTER 1 1 NRR/DIPM/IIPB 1 1 R D 1 1 NRR/DRIP/REXB 1 1 NUDOCS -ABSTRACT 1 1 OE 1 1 OGC/RP 1 1 RGN1 FILE 01 1 1 RNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 NUDOCS FULLTEXT 1 1 D 0
'E NOTE TO ALL "RZDS". RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL 16
AND ROCHESTER GAS AND E'lECTRIC CORPORAT1ON ~ 89EASTAtrrENUE, ROCHESTER, N.Y. Id6d9-0001 AREA CODE 716 Sf6-2700 ROBERT C. MECREDY Vice President Nucleor Operations August 23, 1999 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I Washington, D.C. 20555
Reference:
NRC ¹40500 Team Inspection 50.244/99-05 dated 8/6/99
Dear Mr. Vissing:
As a result of questions regarding main steam check valve performance included in the above reference, received August 16, 1999, RG&E and the NRC had a conference call on August 16 to review our approach in responding to these questions. A summary of the conference call is provided as Attachment l.
As requested, we will formally respond to the questions within 30 days of receipt of that letter.
Very yours, Robert C. Mecredy xc: Mr. Guy S. Vissing (Mail Stop 8C2)
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector ,Q) go I
.r9 Greg Cranston 99i0260278 990823 PDR ADQCK 05000244 8 PDR
0 ATTACHMENT1:
SUMMARY
OF PHONE CONVERSATION W/NRC DATE: 8-16-99 TIME: 10:00 AM TOPIC: NRC 8 QUESTIONS ON Main Steam Check Valve PARTICIPANTS: G. Wrobel (RG&E - Licensing)
J. Dunne (RG&E - Reactor Engineering & Analysis)
K. Muller (RG&E - Primary Systems)
G. Cranston (NRC - Region 1)
During the 8-16-99 phone conversation, RG&E reviewed its plan for responding to the 8 questions provided to RG&E by the NRC concerning the RG&E Design Analysis on Main Steam (MS) check valve closure on reverse flow following a MSLB. A synopsis of the information verbally discussed is summarized below.
Question 1 To respond to Question 1 on the need for a more sophisticated flow analysis, RG&E identified that it is planning to have a'hird party Independent Review of the issue. RG&E has had discussions with Duke Engineering & Services for performing the Independent Review. Duke has been provided with the RG&E Design Analysis (DA-ME-92-147, Rev.2) along with a copy of the valve drawing and the list of the 8 NRC questions. RG&E specifically has asked Duke to perform their review in terms of providing a response to both Question 1 and Question 7.
~
After obtaining the results of the Duke Independent Review and assessing their findings, RG&E will evaluate if any additional actions are believed to be warranted. This would include the need for a detailed 3D analysis to address the NRC concerns as well as the need to implement any changes to the present check valve configuration on a short term basis.
Question 2 The Design Analysis assumed that the change in steam density associated with the change in- steam pressure was negligible for the pressure variations used in the analysis. Specifically, for an assumed steam pressure at the inlet of the check valve (e.g. 800 psia), the difference in density between static and stagnation conditions was negligible and could be ignored. This is based on the difference between static and stagnation conditions in the design analysis being on the order of a couple of psi.
Attachment 1 of Design Analysis DA-ME-97-147 lists torques for various steam pressures of 700 psia, 800 psia and 900 psia. The incompressible assumption was not used to develop the pressure dependent torques listed in the Design Analysis; a curve fit was used for steam density as a function of the three assumed steam pressures.
Question 3:
The constant pressure assumption was only made to perform the analysis of the valve at the instant in time that valve closure is expected to occur. This time is the time when maximum flow &om the intact SG to the break occurs. From the LOFTRAN analysis, the mass flow rate used was 603 ibm/sec and the corresponding main steam pressure was approximately 800 psia. Therefore, this flow rate and pressure were used for the analysis of closing torque on the check valve. The initial steady state Main Steam flow condition used in the LOFIRAN run was 914 lb/sec.
Actual reverse flow through the Main Steam check valve from the intact SG would be expected to occur following termination of flow to the turbine. Prior to the Turbine Stop Valve closure, the flow from the intact SG would be expected to flow primarily to the Turbine. The review of the LOFTRAN transient results indicated that the peak flow rate from the intact SG following the Turbine Stop Valve closure bounded the 603 lb/sec value used in DA-ME-97-147. The changes in steam flow and pressure subsequent to the initiation of check valve movement is not relevant to the DA-ME-92-147 analysis. Once the check valve begins to close, closure of the valve is ensured by its movement into the flow stream and the increase in drag force due to its movement. Therefore, the check valve calculation did not need to evaluate the impact of lower flows and pressures that would occur afler check valve movement is assumed to have occurred.
Questions 4 & 5:
The 603 lb/sec flow past the check valve is based on choked flow occurring at the break location.
The break flow is controlled by choked conditions. The flow rate out the break is a summation of the flow that reached the break from the two flow paths feeding the break location. The 603 lb/sec flow rate was the LOFTRAN flow for the flow path from the intact SG to the break location. This flow was added to the forward flow from the faulted SG to obtain the total break flow.
The flow from the faulted SG to the break is expected to be somewhat greater than the flow from the intact SG to the break location. The difference in flow results from the combined effect of the following two conditions which tend to off-set each other:
Increased hydraulic resistance from the intact SG to the break causes increased frictional losses which tends to decrease flow from the intact SG to the break.
- 2) The higher flow from the faulted SG to the break causes it to depressurize faster than the intact SG. This causes the faulted SG pressure to be lower than the pressure in the intact SG.
This difference in SG pressures minimizes the difference in flow splits between the two SGs that results from Item 1.
Question 6:
The one second check valve closure time has minimal impact on the DA-ME-92-147 analysis. The one second time is used to assess what point in time the LOFTRAN transient analysis on SG blowdown is used to quantify the flow from the intact SG to the break and the corresponding MS pressure conditions. The one second closure time is the typical Chapter 15 accident analysis time used for Ginna for isolation of the intact SG from the break by closure of the MS check valves for the design basis large MSLBs.
Question 7:
As stated in the response to Question 1, RG&E will have the'Independent Review assess the assumption of treating the valve disk as a flat circular disk. The NRC identified that a concern expressed within the NRC was the potential for the angled disk to act as an air foil. This combined with the effect of the disk hinge arm on the top side of the disk could result in flow patterns over the top disk surface which results in differential pressure across the disk to lift up the disk instead of closing it. RG&E stated that this concern would be addressed by Duke in their assessment.
Question 8:
RG&E stated that presently we do not have detailed drawings of the valve internals that would allow us to quantify the flow areas and volumes requested by this concern. We are pursuing this information with Atwood Morril.