ML17261B133

From kanterella
Jump to navigation Jump to search
Recommits to Performing Enhanced primary-to-secondary Leak Rate Monitoring,Per NRC Bulletin 88-002
ML17261B133
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/13/1990
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
Office of Nuclear Reactor Regulation
References
IEB-88-002, IEB-88-2, TAC-67308, NUDOCS 9008230006
Download: ML17261B133 (2)


Text

ACCELERATED DIORIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9008230006 DOC.DATE: 90/08/13 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R. Project Directorate I-3 R

SUBJECT:

Recommits to performing enhanced primary-to-secondary leak I rate monitoring,per NRC Bulletin 88-0 2. i DISTRIBUTION CODE: IE13D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Bulletin Response, 88-02 Rapidly Propag ting Fatigue Cracks zn Steam NOTES:License Exp date in accordance with "10CFR2,2.109(9/19/72). 05000244

/

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 1 0 PDl-3 PD JOHNSON,A INTERNAL: AEOD/DSP/TPAB NRR MURPHY,E NRR NEIGHBORS,D NRR/DOEA/OGCB11 NRR/DREP/PEPB9D NRR D~8E2 NRR/PMAS/ILRB12 RES/DSIR/EIB RGN1 FILE 01 EXTERNAL: LPDR NRC PDR NSIC R

D D

D, NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OP COPIEB REQUIRED: LTTR 16 ENCL

~g )

NC1

~ S I~

7 seen SSaSC ROCHESTER GAS AND ELECTRIC CORPORATION ~ eg EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C. AtECREOV TEl.EPNONf Vi<e Psesideni AAEACODRTS6 546 2700 Cinne Nucieas Psoduesidn August 13, 1990 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Allen R. Johnson Project Directorate I-3 Washington, D.C. 20555

Subject:

NRC Bulletin 88-02, TAC No. 67308 R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Johnson:

As requested in the subject letter dated July 10, 1990, RG&E recommits to performing enhanced primary-to-secondary leak rate monitoring in accordance with item C.1 of NRC Bulletin 88-02 at the R. E. Ginna Nuclear Power Plant. The enhanced monitoring is viewed as a temporary measure that will be performed until completion of the Westinghouse reassessment of the Ginna specific analyses re-lated to NRC Bulletin 88-02 and NRC staff review of the reassess-ment. The enhanced monitoring program that will be utilized is the program described in RGGE's initial response to NRC Bulletin 88-02 as provided in our letter to the NRC dated March 25, 1988.

Very truly yours, Robert C. Me redy GJW/115 Attachment xc: Mr. Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector 9008230006 9008i3 PDR 9

ADOCK 05000244 PDC f =yy(g+i~1 gE /9 I/O