Recommits to Performing Enhanced primary-to-secondary Leak Rate Monitoring,Per NRC Bulletin 88-002
ML17261B133
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/13/1990
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
Office of Nuclear Reactor Regulation
References
IEB-88-002, IEB-88-2, TAC-67308, NUDOCS 9008230006
Download: ML17261B133 (2)


Text

ACCELERATED DIORIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9008230006 DOC.DATE: 90/08/13 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

Project Directorate I-3 R

SUBJECT:

Recommits to performing enhanced primary-to-secondary leak I

i rate monitoring,per NRC Bulletin 88-0 2.

DISTRIBUTION CODE:

IE13D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Bulletin Response, 88-02 Rapidly Propag ting Fatigue Cracks zn Steam NOTES:License Exp date in accordance with "10CFR2,2.109(9/19/72).

05000244 /

RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DSP/TPAB NRR NEIGHBORS,D NRR/DREP/PEPB9D NRR/PMAS/ILRB12 RES/DSIR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1

0 RECIPIENT ID CODE/NAME PDl-3 PD NRR MURPHY,E NRR/DOEA/OGCB11 NRR D~8E2 RGN1 FILE 01 NRC PDR COPIES LTTR ENCL R

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OP COPIEB REQUIRED:

LTTR 16 ENCL ~g D

D,

)

ROCHESTER GAS AND ELECTRIC CORPORATION NC1

~

S I ~

7 seen SSaSC

~

eg EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C. AtECREOV Vi<e Psesideni Cinne Nucieas Psoduesidn August 13, 1990 TEl.EPNONf AAEACODRTS6 546 2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Allen R. Johnson Project Directorate I-3 Washington, D.C.

20555

Subject:

NRC Bulletin 88-02, TAC No.

67308 R.E.

Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Johnson:

As requested in the subject letter dated July 10,

1990, RG&E recommits to performing enhanced primary-to-secondary leak rate monitoring in accordance with item C.1 of NRC Bulletin 88-02 at the R. E. Ginna Nuclear Power Plant.

The enhanced monitoring is viewed as a temporary measure that will be performed until completion of the Westinghouse reassessment of the Ginna specific analyses re-lated to NRC Bulletin 88-02 and NRC staff review of the reassess-ment.

The enhanced monitoring program that willbe utilized is the program described in RGGE's initial response to NRC Bulletin 88-02 as provided in our letter to the NRC dated March 25, 1988.

Very truly yours, Robert C.

Me redy GJW/115 Attachment xc: Mr. Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector 9008230006 9008i3 PDR ADOCK 05000244

=yy(g+i~1 9

PDC f gE /9 I/O