ML17261B022

From kanterella
Jump to navigation Jump to search
Provides Revised Test Schedule for motor-operated Valve Diagnostic Test Program,Per IE Bulletin 85-003.NRC Notification of Changes to Valve Operability Program Required by Generic Ltr 89-10,dtd 890828
ML17261B022
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/22/1990
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
Office of Nuclear Reactor Regulation
References
GL-89-10, IEB-85-003, IEB-85-3, NUDOCS 9003290233
Download: ML17261B022 (3)


Text

C ACCELERATFJ3 DTRJBUTION DEMONSHTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9003290233 DOC.DATE: 90/03/22 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDEY,R.C. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R. Project Directorate I-3

SUBJECT:

Provides revised test schedule for MOV diagnostic test program.

DISTRIBUTION CODE: 1E11D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Bulletin Response (50 DKT)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR E CL ID CODE/NAME LTTR E CL PD1-3 LA 1 PD1-3 PD 1 JOHNSON,A 1 INTERNAL: AEOD/DOA AEOD/DSP/TPAB NRR/DET/EMEB9H3 NRR/DOEA/OEAB11 NRR/DOEA/OGCB11 NRR/DREP/PEPB9D NRR/DST/ SE2 NRR P S ILRB12 NUDOCS-ABSTRACT L 02 RES/DSIR/EIB G 1 FILE 01 EXTERNAL: LPDR NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM ISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL

/~

RSP TOSS STATC ROCHESTER GAS AND ELECTRIC CORPORATION ~ '89 EAST AVENUE, ROCHESTER, N.Y. 1484g-ggg1 March 22, 1990 TCS.CP~OA1C ARCA COOC 71'46 2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Allen R. Johnson Project Directorate I-3 Washington, D.C. 20555

Subject:

Change to the IEB 85-03 Program R.E. Ginna Nuclear Power Plant Docket No. 50-244

Reference:

1. RGGE to NRC letter dated July 8, 1988 from R.E. Smith to C. Stahle, "IEB 85-03, Report Summarizing Program Completion"
2. Generic Letter 89-10, "Safety-Related Motor Operated Valve Testing and Surveillance", dated June 28, 1989

Dear Mr. Johnson:

In Reference 1, RG&E submitted a program that satisfied the requirements of IEB 85-03. That program prescribed a test schedule consisting of an annual motor load test for AC MOVs, annual baseline test for DC MOVs and a full baseline test for AC MOVs every four years. This schedule was acknowledged to be flexible, subject to change based on either industry or in-plant data.

Since Reference 1 was submitted, RGGE has re-evaluated the MOV diagnostic test program based primarily upon the results of the Reliability Centered Maintenance Program at Ginna Station, changes in motor load testing methodology and the undertaking of an extensive valve refurbishment program. The test schedule has subsequently been revised as follows:

1. A complete baseline test shall be performed once on each MOV (AC or DC). If the MOV is overhauled or extensive corrective maintenance is performed, new baseline signatures will be acquired as necessary.

nteaU Ct CVOQ 2. Each MOV shall be retested at a specified interval at either Fr Cs GG the motor control center (i.e., motor load test) or the valve QU>

+cs as follows:

CSjgo FiO a. Environmentally Qualified MOVs 3 years C.~O CA b. Safety-Related MOVs - 5 years CV

c. Non Safety-Related MOVs 10 years R

OQ'Q In addition, motor load testing will be performed as necessary 0QQ upon completion of minor corrective maintenance tasks.

gP/

NRC notification of changes to the Valve Operability Program is required by Reference 2 which was issued on June 28, 1989.

Detailed justification for these changes has been retained on site as required by Reference 2.

Very truly yours, Robert C. Mec edy Division Manager Nuclear Production RWEN092 Attachment xc: Mr. Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector